Bathroom Renovation - A Step by Step Guide

Bathrooms are among the smallest rooms at home plus they are also one the most expensive to renovate. Bathroom renovation is really a job that, if done well, will add value to some home along with a great space full of design and light-weight.
Classic Living Room Interior Design DelhiNCR

Bathroom design
Bathroom design could be the first part of a bath room renovation you ought to get right. Just replacing the present bathroom with similar design will not be enough. The key to great bathroom design is usually to design it using the people that are going to utilize it planned. However make certain that a bath room design also offers a broad use factor also.

For example: If you were designing a bath room for families you may still design the toilet with easy access to the shower and bath. This would make certain that the look would recieve treatment if you have limited mobility. This means if you opt to sell your home or if you are renovating for profit your design includes a wider market appeal. Great bathroom design also uses the area well, taking into consideration the sunshine or window space, size of fittings, and drainage options. Draw out an agenda to scale and down the sizes of one's room. Mark the existing drainage points then and water inlet points. Write down a wish listing of the toilet fittings to want and want using their sizes. Now marry the 2 together and see what fits. Note: Most bathroom drainage and water inlet points may be moved but this does come at extra expense.
Beautiful living room rendering  Kerala home design and floor plans

Bathroom remodel
If you decide to do the task yourself or part of the project it can be time to hire a skip bin and take out the previous bathroom. If your house was made pre 1980 you may have fibro bathroom wall linings with asbestos within it and great care must be taken. You will need some full body disposable overalls, eye protection, and quality dust mask. Check with your local building authority or council about the regulation on bathroom asbestos wall lining removal.
Remove everything except the plumbing. If you keep the toilet plumbing in place you won't ought to turn the water off for the complete house. Also you will need to jack hammer the bottom tiles up as well as the sand and cement bed that they're laid on.
30 Elegant American Style Living Room Designs from Jane Lockhart  4BetterHome

Bathroom Renovation and construction
Bathrooms must be construction properly through the ground up to ensure that the finished job is correct and true. This also ensures the design and search of the toilet can have a great finish
The Bathroom Renovation Process

Install water and drainage pipe and electrical wires.

Install wall lining and ceiling and after that install the tub hob and bath.

Waterproof the ground and shower and bath recess.

Correct the fall of a floor with sand and cement ready for tiling.

Lay floor and wall tiles and after that grout.

Install new bathroom vanity, fittings, and taps - install new electrical.
Future House Design: Modern Living Room Interior Design Styles 2010 by Natuzzi


Paint ceiling and final  one - Plumbing and electrical
At this time all new plumbing is installed for clean cold and warm water and drainage. Careful attention should be taken when positioning the new plumbing in order that the plumbing fittings are correct when the tiling is fully gone. For example: To centre a fitting in the shower recess you should take into consideration the thickness from the wall board, tile glue and tile so the fitting will be centred following your tiles are set up. The same applies to installing drainage pipes to get a toilet; the wall lining and tile thickness have to be considered therefore the pipe is within the correct position in the event the toilet is installed after tiling. Also rough within the any new electrical wires without connecting them for the mains power.
Free Images : table, wood, vintage, house, chair, old, home, wall, living room, furniture

Step two - Install wall and ceiling linings
Install your 6mm wall lining the constant maintenance to nail the fibro board every 150mm without nailing into the new pipes and electrical wires. The best way is to measure and mark the pipe and wire layout on to your new wall board with a pencil when you go. Screw up (or nail) the ceiling lining, plasterboard will be the most common. However if you are laying your tiles from floor to ceiling don't install the cornice because done after tiling. If you're not tiling to the ceiling proceed to install the cornice following the wallboard and ceiling lining are actually installed. Also if your bath is just not freestanding it's simple to from the frame and install the bath. Ensure the bathtub is installed correctly enabling the thickness in the tiles and  sure to check on all linings and pipes before you decide to continue with your bathrooms renovation.

Beautiful living room rendering Kerala home design and floor plans
Classic Living Room Interior Design DelhiNCR

Step three - Waterproof your bathroom
Waterproof a bath room floor, shower recess, and around the tub. When waterproofing the ground be sure that the waterproofing comes 100mm in the walls. The shower recess will have to be waterproofed 100mm across the shower rose outlet. Also the bathtub ought to be waterproofed 100mm above the lip in the bath around and for the floor. At the doorway install a 25 x 25mm aluminum angle glued into place with quality silicone and waterproof into the lip. Your whole bathroom should now the tanked, and so the all water will simply go lower a drain. Bathroom waterproofing tip: waterproofing is a straightforward job but quality and accuracy is most significant.
Step four - Lay within the cement screed for a floor.

Before the ground tiles can laid the bottom has to be smooth and fairly flat having a slight fall towards the drainage outlet. To do this you need to use sand and cement mix in fact it is best to include a waterproofing agent into this also. With a level, set the ground level with the doorway. Use the top aluminum angle as the finished floor level and measure down the thickness in the tile plus 10mm to the glue. Mark right around the restroom using a level and then screed in your sand and cement mix having a 1 to 3 degree fall on the top with the drain outlet. Take your time and get it right with the finished level as smooth as you can. When the sand cement mix has set but is not dry (it is possible to walk on it however, you it's still a little soft) rub it over using a house brick. This will remove every one of the small highs and lows and look with a level as you go. Let the restroom floor fully dry then you must have an incredible surface to tile onto. Tip: the harder work you add into the bottom screed the simpler your tiling will be.
30 Elegant American Style Living Room Designs from Jane Lockhart 4BetterHome
Beautiful living room rendering  Kerala home design and floor plans

Step five: Tile floor and walls
Lay your tiles on the ground first and then grout. Then lay your wall tiles ensuring that that they're level when you lay. Once the restroom tiles are actually cut and laid, grout all your tiles after which buff the tiles clean.
Step six: Install plumbing fitting and fixtures
Install all your plumbing fittings and taps. Also fit your towel rails and soap holders. Fit a new bathroom vanity making certain it really is level and sealed throughout the top with silicone and in addition seal around the tub. Tip: make sure they are in the right place when you drill in your tiles.
Future House Design: Modern Living Room Interior Design Styles 2010 by Natuzzi
30 Elegant American Style Living Room Designs from Jane Lockhart  4BetterHome

Step seven: painting, and cleaning - enjoy