Bathroom Renovation - A Step by Step Guide

Bathrooms are some of the smallest rooms in the home and they are also certainly the most costly to renovate. Bathroom renovation is a job that, if done well, may add value to your home along with a great space filled with design and light.
Carrera Marble Shower Tiles  Eclectic  bathroom

Bathroom design
Bathroom design is the first section of your bathrooms renovation you should get right. Just replacing the current bathroom sticking with the same design is probably not enough. The key to great bathroom design would be to design it while using people that will certainly use it in mind. However make certain that your bathroom design boasts a broad use factor at the same time.

For example: If you were designing your bathrooms for families you can still design the restroom with quick access for the shower and bath. This would make sure that the structure would work if you have limited mobility. This means if you sell your property or if you happen to be renovating for profit your design carries a wider market appeal. Great bathroom design also uses the space well, taking into account the sunshine or window space, height and width of fittings, and drainage options. Draw out an idea to scale and down the sizes of the room. Mark the present drainage points after which and water inlet points. Write down a wish set of the bathroom fittings to want and desire making use of their sizes. Now marry the 2 together and find out what fits. Note: Most bathroom drainage and water inlet points may be moved but this may come at expense.
100 Small Bathroom Designs  Ideas  Hative

Bathroom remodel
If you have decided to accomplish the work yourself or part of the project it's time to employ a skip bin and retrieve the existing bathroom. If your home was developed pre 1980 maybe you have fibro bathroom wall linings with asbestos in it and great care must be taken. You will need some full body disposable overalls, eye protection, and quality dust mask. Check with your local building authority or council regarding the regulation on bathroom asbestos wall lining removal.
Remove everything except the plumbing. If you keep the lavatory plumbing in position you'll not need to turn the water off for the complete house. Also you will likely need to jack hammer the ground tiles up as well as the sand and cement bed actually laid on.
100 Small Bathroom Designs  Ideas  Hative

Bathroom Renovation and construction
Bathrooms should be construction properly from your ground-up to make certain that the finished job is correct and true. This also ensures the design and appearance of the lavatory can have an excellent finish
The Bathroom Renovation Process

Install water and drainage pipe and electrical wires.

Install wall lining and ceiling and after that install the tub hob and bath.

Waterproof a floor and shower and bath recess.

Correct december the bottom with sand and cement ready for tiling.

Lay floor and wall tiles after which grout.

Install new bathroom vanity, fittings, and taps - install new electrical.
Doorless Shower Designs  Doorless Shower Design Ideas  Interior Designs, Architectures and


Paint ceiling and final  one - Plumbing and electrical
At this time brand new plumbing is installed for clean hot and cold water and drainage. Careful attention has to be taken when positioning the brand new plumbing so that the plumbing fittings are correct once the tiling is fully gone. For example: To centre a fitting inside a shower recess you need to consider the thickness from the wall board, tile glue and tile so the fitting will likely be centred following your tiles are in place. The same refers to installing drainage pipes to get a toilet; the wall lining and tile thickness has to be taken into consideration therefore the pipe influences correct position if the toilet is installed after tiling. Also rough within the any new electrical wires without connecting them to the mains power.
25 Incredible Open Shower Ideas

Step two - Install wall and ceiling linings
Install your 6mm wall lining fostering to nail the fibro board every 150mm without nailing into the modern pipes and electrical wires. The best way is to measure and mark the pipe and wire layout onto your new wall board having a pencil as you go. Screw up (or nail) the ceiling lining, plasterboard is the most common. However if you're laying your tiles from floor to ceiling don't install the cornice as this is best done after tiling. If you are not tiling to the ceiling go ahead and install the cornice as soon as the wallboard and ceiling lining happen to be installed. Also if your bath is just not freestanding it's simple to make up the frame and install the bathtub. Ensure the bath is installed correctly enabling the thickness from the tiles and  sure to test all linings and pipes before you decide to continue with a bath room renovation.

100 Small Bathroom Designs Ideas Hative
Carrera Marble Shower Tiles  Eclectic  bathroom

Step three - Waterproof a bath room
Waterproof your bathroom floor, shower recess, and around the bathtub. When waterproofing the bottom be sure that the waterproofing comes 100mm the walls. The shower recess must be waterproofed 100mm across the shower rose outlet. Also the bathtub should be waterproofed 100mm higher than the lip from the bath around and towards the floor. At the doorway install a 25 x 25mm aluminum angle glued into place with quality silicone and waterproof to the lip. Your whole bathroom should now the tanked, hence the all water will simply go down a drain. Bathroom waterproofing tip: waterproofing is a simple job but quality and accuracy is most significant.
Step four - Lay in the cement screed for the ground.

Before a floor tiles can laid the ground should be smooth and fairly flat having a slight fall towards the drainage outlet. To do this you have to use sand and cement mix and it is advisable to add a waterproofing agent into this also. With a level, set the ground level on the doorway. Use the top aluminum angle because finished floor level and measure around the thickness in the tile plus 10mm for the glue. Mark about the toilet having a level and then screed within your sand and cement mix with a 1 to 3 degree fall for the top in the drain outlet. Take your time and get it right with the finished level as smooth as you can. When the sand cement mix has set but is just not dry (you are able to walk about it however, you will still be a bit soft) rub it over using a house brick. This will remove every one of the small highs and lows and look having a level while you go. Let the lavatory floor fully dry and after that you should have a fantastic surface to tile onto. Tip: greater work you set into the ground screed the more your tiling will be.
100 Small Bathroom Designs Ideas Hative
100 Small Bathroom Designs  Ideas  Hative

Step five: Tile floor and walls
Lay your tiles on the bottom first and after that grout. Then lay your wall tiles ensuring that that they're level as you lay. Once the lavatory tiles have been cut and laid, grout your entire tiles after which buff the tiles clean.
Step six: Install plumbing fitting and fixtures
Install your entire plumbing fittings and taps. Also fit your entire towel rails and soap holders. Fit your new bathroom vanity making sure it is level and sealed round the top with silicone and in addition seal around the tub. Tip: make sure they come in the right place when you drill in your tiles.
Doorless Shower Designs Doorless Shower Design Ideas Interior Designs, Architectures and
100 Small Bathroom Designs  Ideas  Hative

Step seven: painting, and cleaning - enjoy
Paint your ceiling and perform final clean making sure things are all fitted correctly which there won't be any leaks in your plumbing. - Enjoy your bathroom.