Carport Starter Home Plan 59779ND Architectural Designs House Plans

3 Bedroom Home Design Plans House Plans Carport Starter Home Plan 59779ND Architectural Designs House Plans

Bathroom Renovation - A Step by Step Guide

Bathrooms are probably the smallest rooms in the home and they are also the most expensive to renovate. Bathroom renovation is often a job that, if done well, may add value to your home as well as a great space filled with design and lightweight.
Carport Starter Home Plan  59779ND  Architectural Designs  House Plans

Bathroom design
Bathroom design could be the first part of your bathroom renovation you need to get right. Just replacing the current bathroom sticking with the same design will not be enough. The key to great bathroom design is always to design it while using folks that are likely to put it to use in mind. However make certain that a bath room design boasts an over-all use factor at the same time.

For example: If you were designing your bathroom for families you could still design the restroom with easy access on the shower and bath. This would make certain that the look would recieve treatment for those who have limited mobility. This means if you sell your house or if you're renovating for profit your design has a wider market appeal. Great bathroom design also uses the area well, taking into account the lighting or window space, sized fittings, and drainage options. Draw out an agenda to scale and down the sizes of your respective room. Mark the existing drainage points after which and water inlet points. Write down a wish listing of the lavatory fittings to wish and want using sizes. Now marry the 2 together to see what fits. Note: Most bathroom drainage and water inlet points could be moved but this certainly does come at extra expense.
Contemporary House Plans: Modern House CH173

Bathroom remodel
If you have chosen to complete the job yourself or part of the job it's time to employ a skip bin and pull out the previous bathroom. If your own home is made pre 1980 you might have fibro bathroom wall linings with asbestos inside and great care will need to be taken. You will need some full body disposable overalls, eye protection, and quality dust mask. Check with your neighborhood building authority or council regarding the regulation on bathroom asbestos wall lining removal.
Remove everything except the plumbing. If you keep the restroom plumbing in position you do not have to turn the water off for the complete house. Also you will need to jack hammer the floor tiles up and also the sand and cement bed that they are laid on.
Amazing Best 3 Bedroom Floor Plan Best Home Design Luxury Lcxzz Design 3bedroom Floor Plans Pic

Bathroom Renovation and construction
Bathrooms has to be construction properly from the start to be sure that the finished job is correct and true. This also ensures the design and look of the lavatory could have a great finish
The Bathroom Renovation Process

Install water and drainage pipe and electrical wires.

Install wall lining and ceiling and after that install the bath hob and bath.

Waterproof the bottom and shower and bath recess.

Correct late the bottom with sand and cement ready for tiling.

Lay floor and wall tiles and then grout.

Install new bathroom vanity, fittings, and taps - install new electrical.
Attractive 3 Bedroom Rambler  14565RK  Architectural Designs  House Plans


Paint ceiling and final  one - Plumbing and electrical
At this aspect many new plumbing is installed for clean hot and cold water and drainage. Careful attention needs to be taken when positioning the brand new plumbing in order that the plumbing fittings are correct once the tiling is completed. For example: To centre a fitting in a very shower recess you should take into consideration the thickness from the wall board, tile glue and tile so the fitting will be centred after the tiles are in position. The same pertains to installing drainage pipes for a toilet; the wall lining and tile thickness should be considered and so the pipe influences correct position once the toilet is installed after tiling. Also rough within the any new electrical wires without connecting them on the mains power.
2 Bedroom House Plan  ID 12209  House Plans by Maramani

Step two - Install wall and ceiling linings
Install your 6mm wall lining the constant maintenance to nail the fibro board every 150mm without nailing into the brand new pipes and electrical wires. The best way is always to measure and mark the pipe and wire layout on to your new wall board using a pencil because you go. Screw up (or nail) the ceiling lining, plasterboard is the most common. However if you happen to be laying your tiles from floor to ceiling usually do not install the cornice as this is best done after tiling. If you might be not tiling for the ceiling go on and install the cornice after the wallboard and ceiling lining are actually installed. Also if your bath is just not freestanding now you can make up the frame and install the tub. Ensure the tub is installed correctly enabling the thickness of the tiles and  sure to check all linings and pipes before you continue with your bathrooms renovation.

Contemporary House Plans: Modern House CH173
Carport Starter Home Plan  59779ND  Architectural Designs  House Plans

Step three - Waterproof your bathroom
Waterproof your bathroom floor, shower recess, and around the bathtub. When waterproofing a floor be sure that the waterproofing comes 100mm the walls. The shower recess must be waterproofed 100mm across the shower rose outlet. Also the bathtub needs to be waterproofed 100mm above the lip from the bath about and towards the floor. At the doorway put in a 25 x 25mm aluminum angle glued into place with quality silicone and waterproof in to the lip. Your whole bathroom should now the tanked, and so the all water will still only decrease a drain. Bathroom waterproofing tip: waterproofing is a straightforward job but quality and accuracy is most critical.
Step four - Lay inside cement screed for a floor.

Before the ground tiles can laid the bottom have to be smooth and fairly flat having a slight fall to the drainage outlet. To do this you have to use sand and cement mix and it's also far better to put in a waterproofing agent into this too. With a level, set the bottom level with the doorway. Use the top aluminum angle because the finished floor level and measure on the thickness in the tile plus 10mm for the glue. Mark about the bathroom using a level and then screed in your sand and cement mix which has a 1 to 3 degree fall on the top of the drain outlet. Take your time and acquire it right with all the finished level as smooth as is possible. When the sand cement mix has set but is just not dry (you are able to walk on it nevertheless, you it's still a lttle bit soft) rub it over using a house brick. This will remove all the small highs and lows and check using a level because you go. Let the toilet floor fully dry and after that you really should have an incredible surface to tile onto. Tip: the greater work you place into the ground screed the simpler your tiling will probably be.
Amazing Best 3 Bedroom Floor Plan Best Home Design Luxury Lcxzz Design 3bedroom Floor Plans Pic
Contemporary House Plans: Modern House CH173

Step five: Tile floor and walls
Lay your tiles on the bottom first after which grout. Then lay your wall tiles ensuring they are level as you lay. Once the lavatory tiles happen to be cut and laid, grout all your tiles then buff the tiles clean.
Step six: Install plumbing fitting and fixtures
Install all your plumbing fittings and taps. Also fit your towel rails and soap holders. Fit your bathroom vanity ensuring it is level and sealed around the top with silicone as well as seal around the tub. Tip: make sure they come in the right place when you drill in your tiles.
Attractive 3 Bedroom Rambler 14565RK Architectural Designs House Plans
Amazing Best 3 Bedroom Floor Plan Best Home Design Luxury Lcxzz Design 3bedroom Floor Plans Pic

Step seven: painting, and cleaning - enjoy
Paint your ceiling and perform final clean making sure things are all fitted correctly knowning that there aren't any leaks in your plumbing. - Enjoy your brand-new bathroom.

Comments