Cape Cod Great Room With Stone Fireplace HGTV

Bedroom Windows Designs Modern Bedroom With Large Windows | Interior Design Ideas Cape Cod Great Room With Stone Fireplace HGTV

Bathroom Renovation - A Step by Step Guide

Bathrooms are probably the smallest rooms in the house and they are generally also the most costly to renovate. Bathroom renovation can be a job that, if done well, can add value with a home as well as a great space filled with design and lightweight.
Cape Cod Great Room With Stone Fireplace  HGTV

Bathroom design
Bathroom design is the first part of a bath room renovation you need to get right. Just replacing the current bathroom with the exact same design will not be enough. The key to great bathroom design is to design it while using individuals who are going to use it in your mind. However be sure that a bath room design boasts a general use factor at the same time.

For example: If you were designing a bath room for families you could still design the toilet with easy accessibility towards the shower and bath. This would be sure that the structure would also work for people with limited mobility. This means if you choose to sell your own home or if you are renovating for profit your design carries a wider market appeal. Great bathroom design also uses the area well, considering the lighting or window space, size of fittings, and drainage options. Draw out an agenda to scale and down the sizes of your room. Mark the present drainage points then and water inlet points. Write down a wish list of the bathroom fittings to want and desire using sizes. Now marry the two together and find out what fits. Note: Most bathroom drainage and water inlet points might be moved but this certainly does come at extra expense.
Aménagement dun petit appartement

Bathroom remodel
If you have decided to complete the work yourself or part of the task it can be time to engage a skip bin and grab the existing bathroom. If your property was made pre 1980 you might have fibro bathroom wall linings with asbestos within it and great care will need to be taken. You will need some full body disposable overalls, eye protection, and quality dust mask. Check with your local building authority or council about the regulation on bathroom asbestos wall lining removal.
Remove everything except the plumbing. If you keep the bathroom plumbing in place you'll not ought to turn water off for the complete house. Also you should jack hammer the bottom tiles up and also the sand and cement bed that they're laid on.
Urban Loft by Nordes Design  Interior Design Ideas [1080p]  YouTube

Bathroom Renovation and construction
Bathrooms has to be construction properly through the ground up to make certain that the finished job is correct and true. This also ensures the style and search of the bathroom can have an incredible finish
The Bathroom Renovation Process

Install water and drainage pipe and electrical wires.

Install wall lining and ceiling and after that install the bathtub hob and bath.

Waterproof the bottom and shower and bath recess.

Correct late the bottom with sand and cement ready for tiling.

Lay floor and wall tiles after which grout.

Install new bathroom vanity, fittings, and taps - install new electrical.
Idée déco toilette moderne, classique, élégante


Paint ceiling and final  one - Plumbing and electrical
At this time new plumbing is installed for clean cold and warm water and drainage. Careful attention must be taken when positioning the brand new plumbing so the plumbing fittings are correct once the tiling is completed. For example: To centre a fitting in a shower recess you need to consider the thickness in the wall board, tile glue and tile and so the fitting will probably be centred following the tiles are in position. The same applies to installing drainage pipes for a toilet; the wall lining and tile thickness have to be looked at and so the pipe is within the correct position in the event the toilet is installed after tiling. Also rough in the any new electrical wires without connecting them on the mains power.
莫斯科New Arbat现代极简风格公寓设计  设计之家

Step two - Install wall and ceiling linings
Install your 6mm wall lining being careful to nail the fibro board every 150mm without nailing into the modern pipes and electrical wires. The best way would be to measure and mark the pipe and wire layout onto your new wall board using a pencil because you go. Screw up (or nail) the ceiling lining, plasterboard could be the most common. However if you might be laying your tiles from floor to ceiling usually do not install the cornice as this is done after tiling. If you're not tiling on the ceiling proceed to install the cornice after the wallboard and ceiling lining are already installed. Also if your bath just isn't freestanding you can now from the frame and install the bath. Ensure the bath is installed correctly enabling the thickness with the tiles and  sure to check all linings and pipes when you continue with your bathrooms renovation.

Aménagement dun petit appartement
Cape Cod Great Room With Stone Fireplace  HGTV

Step three - Waterproof your bathroom
Waterproof your bathroom floor, shower recess, and around the tub. When waterproofing the ground ensure that the waterproofing comes 100mm the walls. The shower recess will need to be waterproofed 100mm over the shower rose outlet. Also the bath should be waterproofed 100mm across the lip of the bath around and towards the floor. At the doorway put in a 25 x 25mm aluminum angle glued into place with quality silicone and waterproof into the lip. Your whole bathroom should now the tanked, and so the all water will simply go lower a drain. Bathroom waterproofing tip: waterproofing is a straightforward job but quality and accuracy is most critical.
Step four - Lay in the cement screed for the bottom.

Before a floor tiles can laid a floor must be smooth and fairly flat using a slight fall to the drainage outlet. To do this you must use sand and cement mix in fact it is advisable to put in a waterproofing agent into this at the same time. With a level, set the bottom level in the doorway. Use the top aluminum angle as the finished floor level and measure on the thickness from the tile plus 10mm for your glue. Mark about the toilet which has a level then screed inside your sand and cement mix which has a 1 to 3 degree fall to the top of the drain outlet. Take your time and acquire it right with the finished level as smooth as is possible. When the sand cement mix has set but just isn't dry (you are able to walk about it but you it is still somewhat soft) rub it over with a house brick. This will remove every one of the small highs and lows and check using a level when you go. Let the toilet floor fully dry then you really should have an excellent surface to tile onto. Tip: the greater work you add into a floor screed the easier your tiling will likely be.
Urban Loft by Nordes Design Interior Design Ideas [1080p] YouTube
Aménagement dun petit appartement

Step five: Tile floor and walls
Lay your tiles on the bottom first and after that grout. Then lay your wall tiles making sure they are level when you lay. Once the lavatory tiles happen to be cut and laid, grout all of your tiles then buff the tiles clean.
Step six: Install plumbing fitting and fixtures
Install your plumbing fittings and taps. Also fit your entire towel rails and soap holders. Fit your new bathroom vanity making certain it is level and sealed throughout the top with silicone and also seal around the bath. Tip: make sure they come in the right place before you decide to drill into the tiles.
Idée déco toilette moderne, classique, élégante
Urban Loft by Nordes Design  Interior Design Ideas [1080p]  YouTube

Step seven: painting, and cleaning - enjoy
Paint your ceiling and perform final clean making certain things are fitted correctly knowning that there are no leaks within your plumbing. - Enjoy your bathroom.

Comments