Bathroom Renovation - A Step by Step Guide

Bathrooms are probably the smallest rooms inside your home and they are also certainly the most expensive to renovate. Bathroom renovation is a job that, if done well, can add value with a home along with a great space filled with design and light-weight.
California log home kits and pre built log homes, custom Interior finishes exactly the way you want.

Bathroom design
Bathroom design will be the first area of a bath room renovation you should get right. Just replacing the existing bathroom with the same design is probably not enough. The key to great bathroom design is always to design it with all the folks that are going to put it to use planned. However ensure that your bathrooms design also has a general use factor too.

For example: If you were designing a bathroom for families you may still design the lavatory with comfortable access towards the shower and bath. This would make sure that the look would work for people with limited mobility. This means if you choose to sell your house or if you happen to be renovating for profit your design features a wider market appeal. Great bathroom design also uses space well, looking at the sunlight or window space, size fittings, and drainage options. Draw out a plan to scale and right down the sizes of your respective room. Mark the present drainage points and then and water inlet points. Write down a wish list of the lavatory fittings to require and wish using their sizes. Now marry the 2 together and find out what fits. Note: Most bathroom drainage and water inlet points might be moved but this may come at extra expense.
15 Examples of Wonderful Rustic Home Interior Designs  Dream Home Decor  Log home floor plans

Bathroom remodel
If you have chosen to complete the work yourself or part of the job it can be time to engage a skip bin and retrieve the old bathroom. If your house is made pre 1980 you may have fibro bathroom wall linings with asbestos inside it and great care must be taken. You will need some full body disposable overalls, eye protection, and quality dust mask. Check with any local building authority or council in connection with regulation on bathroom asbestos wall lining removal.
Remove everything except the plumbing. If you keep the toilet plumbing in place you won't ought to turn the lake off for the whole house. Also you will have to jack hammer a floor tiles up as well as the sand and cement bed that they are laid on.
Perfect Log Cabin Interior Design Ideas!! Best For Your Home Interior Decoration!!  YouTube

Bathroom Renovation and construction
Bathrooms have to be construction properly in the ground-up to make certain that the finished job is correct and true. This also ensures the design and appearance of the bathroom may have an incredible finish
The Bathroom Renovation Process

Install water and drainage pipe and electrical wires.

Install wall lining and ceiling then install the tub hob and bath.

Waterproof the bottom and shower and bath recess.

Correct nov the ground with sand and cement ready for tiling.

Lay floor and wall tiles and after that grout.

Install new bathroom vanity, fittings, and taps - install new electrical.
Log Homes Kitchen  Dining Image Gallery  BC, Canada


Paint ceiling and final  one - Plumbing and electrical
At this time new plumbing is installed for clean cold and warm water and drainage. Careful attention has to be taken when positioning the newest plumbing in order that the plumbing fittings are correct in the event the tiling ends. For example: To centre a fitting in a shower recess you have to consider the thickness from the wall board, tile glue and tile therefore the fitting will probably be centred after the tiles are in position. The same refers to installing drainage pipes for any toilet; the wall lining and tile thickness have to be taken into account therefore the pipe is within the correct position when the toilet is installed after tiling. Also rough inside any new electrical wires without connecting them on the mains power.
Today’s Log Homes for Advantageous and Luxurious Living

Step two - Install wall and ceiling linings
Install your 6mm wall lining the constant maintenance to nail the fibro board every 150mm without nailing into the newest pipes and electrical wires. The best way is to measure and mark the pipe and wire layout on your new wall board which has a pencil while you go. Screw up (or nail) the ceiling lining, plasterboard is the most common. However if you happen to be laying your tiles from floor to ceiling tend not to install the cornice because best done after tiling. If you are not tiling for the ceiling just install the cornice following the wallboard and ceiling lining are actually installed. Also if your bath is just not freestanding you can now form the frame and install the tub. Ensure the bathtub is installed correctly enabling the thickness with the tiles and  sure to check on all linings and pipes prior to deciding to continue with your bathroom renovation.

15 Examples of Wonderful Rustic Home Interior Designs Dream Home Decor Log home floor plans
California log home kits and pre built log homes, custom Interior finishes exactly the way you want.

Step three - Waterproof your bathrooms
Waterproof a bath room floor, shower recess, and around the bathtub. When waterproofing the bottom make sure that the waterproofing comes 100mm the walls. The shower recess will have to be waterproofed 100mm over the shower rose outlet. Also the bathtub should be waterproofed 100mm across the lip of the bath around and for the floor. At the doorway install a 25 x 25mm aluminum angle glued into place with quality silicone and waterproof into the lip. Your whole bathroom should now the tanked, therefore the all water will simply go down a drain. Bathroom waterproofing tip: waterproofing is a simple job but quality and accuracy is most crucial.
Step four - Lay within the cement screed for the bottom.

Before the bottom tiles can laid the floor has to be smooth and fairly flat using a slight fall for the drainage outlet. To do this you have to use sand and cement mix and it's also better to put in a waterproofing agent into this as well. With a level, set the floor level with the doorway. Use the top aluminum angle because finished floor level and measure along the thickness of the tile plus 10mm for that glue. Mark right around the toilet having a level and after that screed within your sand and cement mix having a 1 to 3 degree fall on the top of the drain outlet. Take your time and have it right using the finished level as smooth as possible. When the sand cement mix has set but just isn't dry (you can walk into it nevertheless, you it is still somewhat soft) rub it over using a house brick. This will remove every one of the small highs and lows and look having a level as you go. Let the restroom floor fully dry and then you needs to have a great surface to tile onto. Tip: greater work you add into the ground screed the easier your tiling will likely be.
Perfect Log Cabin Interior Design Ideas!! Best For Your Home Interior Decoration!! YouTube
15 Examples of Wonderful Rustic Home Interior Designs  Dream Home Decor  Log home floor plans

Step five: Tile floor and walls
Lay your tiles on the floor first and then grout. Then lay your wall tiles making certain actually level while you lay. Once the restroom tiles are actually cut and laid, grout all of your tiles then buff the tiles clean.
Step six: Install plumbing fitting and fixtures
Install all of your plumbing fittings and taps. Also fit your towel rails and soap holders. Fit your bathroom vanity ensuring that it's level and sealed around the top with silicone plus seal around the tub. Tip: make sure they are in the right place before you decide to drill into your tiles.
Log Homes Kitchen Dining Image Gallery BC, Canada
Perfect Log Cabin Interior Design Ideas!! Best For Your Home Interior Decoration!!  YouTube

Step seven: painting, and cleaning - enjoy
Paint your ceiling and execute a final clean making certain things are all fitted correctly and that there isn't any leaks within your plumbing. - Enjoy a new bathroom.