Bathroom Renovation - A Step by Step Guide

Bathrooms are probably the smallest rooms inside your home and they are generally also certainly the most costly to renovate. Bathroom renovation is a job that, if done well, can add value to a home along with a great space filled with design and lightweight.
Bonito: Interior Design Bangalore  Interior Design India

Bathroom design
Bathroom design will be the first part of your bathroom renovation you should get right. Just replacing the existing bathroom sticking with the same design may not be enough. The key to great bathroom design is always to design it while using individuals who are going to apply it planned. However make sure that a bath room design boasts a broad use factor too.

For example: If you were designing a bathroom for families you could still design the restroom with quick access to the shower and bath. This would be sure that the design would work if you have limited mobility. This means if you choose to sell your own home or if you happen to be renovating for profit your design has a wider market appeal. Great bathroom design also uses the room well, looking at the sunshine or window space, sized fittings, and drainage options. Draw out an idea to scale and right down the sizes of the room. Mark the present drainage points then and water inlet points. Write down a wish listing of the bathroom fittings to wish and wish with their sizes. Now marry the 2 together and discover what fits. Note: Most bathroom drainage and water inlet points may be moved but this certainly does come at extra cost.
How To Create 3D Architecture Indian Home Design  HomeLK.com

Bathroom remodel
If you decide to do the work yourself or part of the work it really is time to hire a skip bin and retrieve that old bathroom. If your home is made pre 1980 maybe you have fibro bathroom wall linings with asbestos within it and great care will have to be taken. You will need some full body disposable overalls, eye protection, and quality dust mask. Check with the local building authority or council regarding the regulation on bathroom asbestos wall lining removal.
Remove everything except the plumbing. If you keep the toilet plumbing available you won't need to turn water off for your house. Also you will likely need to jack hammer a floor tiles up and also the sand and cement bed that they're laid on.
Vastu House

Bathroom Renovation and construction
Bathrooms should be construction properly through the ground up to make certain that the finished job is correct and true. This also ensures the design and appear of the restroom can have an excellent finish
The Bathroom Renovation Process

Install water and drainage pipe and electrical wires.

Install wall lining and ceiling after which install the bathtub hob and bath.

Waterproof a floor and shower and bath recess.

Correct december the bottom with sand and cement ready for tiling.

Lay floor and wall tiles and after that grout.

Install new bathroom vanity, fittings, and taps - install new electrical.
Exterior  Interior  Complete Home Design  Architect Magazine  Ashwin Architects, Bangalore


Paint ceiling and final  one - Plumbing and electrical
At this point new plumbing is installed for clean cold and warm water and drainage. Careful attention must be taken when positioning the new plumbing so your plumbing fittings are correct if the tiling is completed. For example: To centre a fitting in a very shower recess you should take into consideration the thickness from the wall board, tile glue and tile so the fitting will probably be centred as soon as the tiles are in place. The same relates to installing drainage pipes to get a toilet; the wall lining and tile thickness has to be taken into account therefore the pipe influences correct position if the toilet is installed after tiling. Also rough within the any new electrical wires without connecting them on the mains power.
Front elevation design  Mamre Oaks 3d Architectural Design and Elevation Services

Step two - Install wall and ceiling linings
Install your 6mm wall lining being careful to nail the fibro board every 150mm without nailing into the newest pipes and electrical wires. The best way is to measure and mark the pipe and wire layout on your new wall board using a pencil as you go. Screw up (or nail) the ceiling lining, plasterboard may be the most common. However if you might be laying your tiles from floor to ceiling tend not to install the cornice because most effectively achieved after tiling. If you happen to be not tiling to the ceiling go on and install the cornice after the wallboard and ceiling lining are actually installed. Also if your bath isn't freestanding it's simple to make up the frame and install the bathtub. Ensure the bathtub is installed correctly allowing for the thickness from the tiles and  sure to test all linings and pipes when you continue with a bath room renovation.

How To Create 3D Architecture Indian Home Design HomeLK.com
Bonito: Interior Design Bangalore  Interior Design India

Step three - Waterproof your bathroom
Waterproof your bathroom floor, shower recess, and around the tub. When waterproofing the bottom ensure that the waterproofing comes 100mm in the walls. The shower recess must be waterproofed 100mm higher than the shower rose outlet. Also the bathtub must be waterproofed 100mm across the lip from the bath right around and for the floor. At the doorway put in a 25 x 25mm aluminum angle glued into place with quality silicone and waterproof to the lip. Your whole bathroom should now the tanked, hence the all water will still only drop a drain. Bathroom waterproofing tip: waterproofing is a straightforward job but quality and accuracy is most crucial.
Step four - Lay within the cement screed for the floor.

Before a floor tiles can laid the bottom has to be smooth and fairly flat which has a slight fall for the drainage outlet. To do this you must use sand and cement mix in fact it is advisable to add a waterproofing agent into this too. With a level, set the ground level on the doorway. Use the top aluminum angle as the finished floor level and measure on the thickness in the tile plus 10mm for the glue. Mark right around the lavatory which has a level after which screed with your sand and cement mix with a 1 to 3 degree fall on the top from the drain outlet. Take your time and get it right using the finished level as smooth as you possibly can. When the sand cement mix has set but is not dry (you'll be able to walk into it nevertheless, you it is somewhat soft) rub it over using a house brick. This will remove every one of the small highs and lows and appearance with a level because you go. Let the lavatory floor fully dry and then you must have a fantastic surface to tile onto. Tip: the more work you set into a floor screed the simpler your tiling is going to be.
Vastu House
How To Create 3D Architecture Indian Home Design  HomeLK.com

Step five: Tile floor and walls
Lay your tiles on the ground first and then grout. Then lay your wall tiles making sure they are level when you lay. Once the lavatory tiles happen to be cut and laid, grout your entire tiles then buff the tiles clean.
Step six: Install plumbing fitting and fixtures
Install all your plumbing fittings and taps. Also fit all your towel rails and soap holders. Fit your bathroom vanity ensuring it can be level and sealed throughout the top with silicone and in addition seal around the bath. Tip: make sure they have been in the right place prior to deciding to drill to your tiles.
Exterior Interior Complete Home Design Architect Magazine Ashwin Architects, Bangalore
Vastu House

Step seven: painting, and cleaning - enjoy
Paint your ceiling and perform a final clean ensuring things are all fitted correctly and that there won't be any leaks inside your plumbing. - Enjoy your new bathroom.