Bathroom Renovation - A Step by Step Guide

Bathrooms are probably the smallest rooms in the house and they are also one the most expensive to renovate. Bathroom renovation is really a job that, if done well, may add value to some home along with a great space packed with design and light-weight.
Дизайн интерьера: двухэтажная квартира в Бухаресте

Bathroom design
Bathroom design will be the first division of your bathroom renovation you need to get right. Just replacing the prevailing bathroom with the exact same design will not be enough. The key to great bathroom design is to design it using the people who are likely to put it to use in mind. However be sure that your bathroom design even offers a general use factor at the same time.

For example: If you were designing a bathroom for families you may still design the restroom with comfortable access on the shower and bath. This would ensure that the structure would work for people with limited mobility. This means if you choose to sell your home or if you happen to be renovating for profit your design carries a wider market appeal. Great bathroom design also uses the room well, taking into consideration the light or window space, size of fittings, and drainage options. Draw out a plan to scale and right down the sizes of one's room. Mark the current drainage points then and water inlet points. Write down a wish set of the lavatory fittings to wish and desire using their sizes. Now marry the 2 together and see what fits. Note: Most bathroom drainage and water inlet points could be moved but this does come at extra cost.
Mini for 2  Micro Apartment Concept  Studio Presentation  City Tech  YouTube

Bathroom remodel
If you've decided to do the task yourself or part of the project it can be time to engage a skip bin and pull out the existing bathroom. If your house was developed pre 1980 you could have fibro bathroom wall linings with asbestos inside it and great care will have to be taken. You will need some full body disposable overalls, eye protection, and quality dust mask. Check with any local building authority or council about the regulation on bathroom asbestos wall lining removal.
Remove everything except the plumbing. If you keep the restroom plumbing in place you will not have to turn the water off for the whole house. Also you should jack hammer the floor tiles up along with the sand and cement bed they are laid on.
New York City Apartment Tour  Living Room  Kitchen  Katies Bliss

Bathroom Renovation and construction
Bathrooms should be construction properly from the ground up to ensure that the finished job is correct and true. This also ensures the look and appearance of the toilet can have a fantastic finish
The Bathroom Renovation Process

Install water and drainage pipe and electrical wires.

Install wall lining and ceiling after which install the tub hob and bath.

Waterproof the floor and shower and bath recess.

Correct nov the floor with sand and cement ready for tiling.

Lay floor and wall tiles after which grout.

Install new bathroom vanity, fittings, and taps - install new electrical.
Modern Apartment Interior Design in Warm And Glamour Style  DigsDigs


Paint ceiling and final  one - Plumbing and electrical
At this time brand new plumbing is installed for clean cold and warm water and drainage. Careful attention needs to be taken when positioning the brand new plumbing in order that the plumbing fittings are correct once the tiling ends. For example: To centre a fitting inside a shower recess you must think about the thickness from the wall board, tile glue and tile so the fitting will be centred after the tiles are in position. The same relates to installing drainage pipes for the toilet; the wall lining and tile thickness must be looked at therefore the pipe is incorporated in the correct position when the toilet is installed after tiling. Also rough within the any new electrical wires without connecting them on the mains power.
24 Large OpenConcept Living Room Designs  Page 5 of 5

Step two - Install wall and ceiling linings
Install your 6mm wall lining fostering to nail the fibro board every 150mm without nailing into the new pipes and electrical wires. The best way is to measure and mark the pipe and wire layout on your new wall board which has a pencil because you go. Screw up (or nail) the ceiling lining, plasterboard is the most common. However if you are laying your tiles from floor to ceiling usually do not install the cornice as this is most effectively achieved after tiling. If you're not tiling on the ceiling proceed to install the cornice as soon as the wallboard and ceiling lining have been installed. Also if your bath just isn't freestanding anyone can form the frame and install the bathtub. Ensure the bath is installed correctly enabling the thickness of the tiles and  sure to test all linings and pipes prior to deciding to continue with your bathroom renovation.

Mini for 2 Micro Apartment Concept Studio Presentation City Tech YouTube
Дизайн интерьера: двухэтажная квартира в Бухаресте

Step three - Waterproof your bathroom
Waterproof a bath room floor, shower recess, and around the bath. When waterproofing the floor be sure that the waterproofing comes 100mm inside the walls. The shower recess will need to be waterproofed 100mm higher than the shower rose outlet. Also the tub must be waterproofed 100mm over the lip with the bath about and towards the floor. At the doorway use a 25 x 25mm aluminum angle glued into place with quality silicone and waterproof to the lip. Your whole bathroom should now the tanked, therefore the all water will simply drop a drain. Bathroom waterproofing tip: waterproofing is a simple job but quality and accuracy is most important.
Step four - Lay in the cement screed for the bottom.

Before a floor tiles can laid the bottom should be smooth and fairly flat having a slight fall towards the drainage outlet. To do this you must use sand and cement mix in fact it is advisable to put in a waterproofing agent into this at the same time. With a level, set the floor level at the doorway. Use the top aluminum angle since the finished floor level and measure along the thickness from the tile plus 10mm for the glue. Mark around the restroom with a level then screed within your sand and cement mix using a 1 to 3 degree fall towards the top from the drain outlet. Take your time and have it right while using finished level as smooth as you can. When the sand cement mix has set but is just not dry (you are able to walk on it however, you it's still a bit soft) rub it over having a house brick. This will remove all the small highs and lows and appearance which has a level while you go. Let the lavatory floor fully dry and then you should have an incredible surface to tile onto. Tip: the harder work you set into the ground screed the more your tiling is going to be.
New York City Apartment Tour Living Room Kitchen Katies Bliss
Mini for 2  Micro Apartment Concept  Studio Presentation  City Tech  YouTube

Step five: Tile floor and walls
Lay your tiles on the floor first and then grout. Then lay your wall tiles ensuring that they are level as you lay. Once the bathroom tiles are actually cut and laid, grout your entire tiles and after that buff the tiles clean.
Step six: Install plumbing fitting and fixtures
Install your entire plumbing fittings and taps. Also fit all your towel rails and soap holders. Fit your new bathroom vanity ensuring that it can be level and sealed around the top with silicone and also seal around the bathtub. Tip: make sure they have been in the right place before you drill into the tiles.
Modern Apartment Interior Design in Warm And Glamour Style DigsDigs
New York City Apartment Tour  Living Room  Kitchen  Katies Bliss

Step seven: painting, and cleaning - enjoy
Paint your ceiling and perform a final clean making sure things are all fitted correctly and that there won't be any leaks in your plumbing. - Enjoy your new bathroom.