Best Tropical Swimming Pool Design Ideas Plans Waterfalls Design Lanscaping Ideas YouTube

Swimming Pools Design Outdoor Swimming Pool Designs Awesome Outdoor Swimming Pool Design Best Tropical Swimming Pool Design Ideas Plans Waterfalls Design Lanscaping Ideas YouTube

Bathroom Renovation - A Step by Step Guide

Bathrooms are one of the smallest rooms at home and they're also one the most expensive to renovate. Bathroom renovation is often a job that, if done well, will add value to your home along with a great space filled with design and light.
Best Tropical Swimming Pool Design Ideas Plans Waterfalls Design Lanscaping Ideas  YouTube

Bathroom design
Bathroom design could be the first area of a bath room renovation you need to get right. Just replacing the current bathroom with the same design is probably not enough. The key to great bathroom design would be to design it while using individuals who are likely to utilize it at heart. However make certain that a bath room design boasts a general use factor as well.

For example: If you were designing a bath room for families you might still design the toilet with easy access on the shower and bath. This would make sure that the style would work if you have limited mobility. This means if you sell your property or if you're renovating for profit your design features a wider market appeal. Great bathroom design also uses space well, taking into account the light or window space, size of fittings, and drainage options. Draw out a plan to scale and down the sizes of your respective room. Mark the current drainage points after which and water inlet points. Write down a wish listing of the toilet fittings to want and desire making use of their sizes. Now marry the two together and discover what fits. Note: Most bathroom drainage and water inlet points can be moved but this certainly does come at extra cost.
20+ Backyard Pool Designs, Decorating Ideas  Design Trends  Premium PSD, Vector Downloads

Bathroom remodel
If you've decided to complete the job yourself or part of the work it really is time to employ a skip bin and retrieve that old bathroom. If your property was developed pre 1980 maybe you have fibro bathroom wall linings with asbestos within it and great care will need to be taken. You will need some full body disposable overalls, eye protection, and quality dust mask. Check with the local building authority or council about the regulation on bathroom asbestos wall lining removal.
Remove everything except the plumbing. If you keep the lavatory plumbing in position you do not need to turn the water off for the complete house. Also you should jack hammer the bottom tiles up and also the sand and cement bed that they're laid on.
15 Amazing backyard swimming pool designs  Little Piece Of Me

Bathroom Renovation and construction
Bathrooms has to be construction properly from your start to make certain that the finished job is correct and true. This also ensures the look and appear of the restroom may have an excellent finish
The Bathroom Renovation Process

Install water and drainage pipe and electrical wires.

Install wall lining and ceiling then install the tub hob and bath.

Waterproof the ground and shower and bath recess.

Correct the fall of the bottom with sand and cement ready for tiling.

Lay floor and wall tiles and then grout.

Install new bathroom vanity, fittings, and taps - install new electrical.
Backyard Landscaping IdeasSwimming Pool Design  Homesthetics  Inspiring ideas for your home.


Paint ceiling and final  one - Plumbing and electrical
At this point all new plumbing is installed for clean cold and hot water and drainage. Careful attention should be taken when positioning the brand new plumbing so the plumbing fittings are correct if the tiling is finished. For example: To centre a fitting inside a shower recess you have to consider the thickness of the wall board, tile glue and tile hence the fitting will probably be centred after the tiles are set up. The same refers to installing drainage pipes for a toilet; the wall lining and tile thickness must be taken into consideration and so the pipe is in the correct position in the event the toilet is installed after tiling. Also rough within the any new electrical wires without connecting them for the mains power.
Backyard Landscaping IdeasSwimming Pool Design  Homesthetics  Inspiring ideas for your home.

Step two - Install wall and ceiling linings
Install your 6mm wall lining the constant maintenance to nail the fibro board every 150mm without nailing into the modern pipes and electrical wires. The best way is always to measure and mark the pipe and wire layout on to your new wall board using a pencil when you go. Screw up (or nail) the ceiling lining, plasterboard may be the most common. However if you're laying your tiles from floor to ceiling tend not to install the cornice because this is best done after tiling. If you are not tiling for the ceiling go ahead and install the cornice following the wallboard and ceiling lining have been installed. Also if your bath just isn't freestanding now you can make up the frame and install the bath. Ensure the bath is installed correctly permitting the thickness with the tiles and  sure to check on all linings and pipes before you decide to continue with your bathroom renovation.

20+ Backyard Pool Designs, Decorating Ideas Design Trends Premium PSD, Vector Downloads
Best Tropical Swimming Pool Design Ideas Plans Waterfalls Design Lanscaping Ideas  YouTube

Step three - Waterproof a bath room
Waterproof your bathroom floor, shower recess, and around the bath. When waterproofing the ground ensure that the waterproofing comes 100mm the walls. The shower recess must be waterproofed 100mm over the shower rose outlet. Also the bathtub must be waterproofed 100mm above the lip of the bath around and towards the floor. At the doorway purchase a 25 x 25mm aluminum angle glued into place with quality silicone and waterproof into the lip. Your whole bathroom should now the tanked, hence the all water will still only decrease a drain. Bathroom waterproofing tip: waterproofing is a straightforward job but quality and accuracy is most critical.
Step four - Lay inside the cement screed for the ground.

Before the bottom tiles can laid the floor has to be smooth and fairly flat with a slight fall for the drainage outlet. To do this you need to use sand and cement mix and it's also advisable to add a waterproofing agent into this at the same time. With a level, set the ground level on the doorway. Use the top aluminum angle since the finished floor level and measure on the thickness from the tile plus 10mm to the glue. Mark around the lavatory having a level and then screed with your sand and cement mix using a 1 to 3 degree fall for the top from the drain outlet. Take your time and obtain it right using the finished level as smooth as possible. When the sand cement mix has set but is just not dry (you are able to walk into it but you it is still a little soft) rub it over using a house brick. This will remove all of the small highs and lows and appearance which has a level while you go. Let the toilet floor fully dry then you really should have an incredible surface to tile onto. Tip: the more work you set into the ground screed the easier your tiling is going to be.
15 Amazing backyard swimming pool designs Little Piece Of Me
20+ Backyard Pool Designs, Decorating Ideas  Design Trends  Premium PSD, Vector Downloads

Step five: Tile floor and walls
Lay your tiles on a floor first and then grout. Then lay your wall tiles making sure they are level when you lay. Once the lavatory tiles happen to be cut and laid, grout your tiles and then buff the tiles clean.
Step six: Install plumbing fitting and fixtures
Install all of your plumbing fittings and taps. Also fit all your towel rails and soap holders. Fit your new bathroom vanity ensuring that it can be level and sealed throughout the top with silicone plus seal around the tub. Tip: make sure they have been in the right place before you drill into the tiles.
Backyard Landscaping IdeasSwimming Pool Design Homesthetics Inspiring ideas for your home.
15 Amazing backyard swimming pool designs  Little Piece Of Me

Step seven: painting, and cleaning - enjoy
Paint your ceiling and execute a final clean ensuring that it is all totally fitted correctly understanding that there aren't any leaks with your plumbing. - Enjoy your new bathroom.

Comments