Bathroom Renovation - A Step by Step Guide

Bathrooms are one of the smallest rooms in the home and they are also one the most costly to renovate. Bathroom renovation is really a job that, if done well, can add value to a home plus a great space brimming with design and light.
Best 25+ Tuscan furniture ideas on Pinterest  Tuscan decor, Tuscany decor and Tuscan style

Bathroom design
Bathroom design could be the first division of your bathroom renovation you should get right. Just replacing the present bathroom with the same design may not be enough. The key to great bathroom design is always to design it with all the individuals who will certainly use it at heart. However make sure that a bath room design boasts a broad use factor too.

For example: If you were designing your bathroom for families you can still design the toilet with easy accessibility to the shower and bath. This would make certain that the structure would also work for people with limited mobility. This means if you decide to sell your own home or if you are renovating for profit your design includes a wider market appeal. Great bathroom design also uses the area well, taking into account the light or window space, size of fittings, and drainage options. Draw out a strategy to scale and all the way down the sizes of one's room. Mark the present drainage points and then and water inlet points. Write down a wish listing of the toilet fittings to want and desire using sizes. Now marry the 2 together to see what fits. Note: Most bathroom drainage and water inlet points may be moved but this may come at extra expense.
443 best images about Tuscan Decor on Pinterest

Bathroom remodel
If you've decided to accomplish the work yourself or part of the work it is time to employ a skip bin and pull out the previous bathroom. If your home was developed pre 1980 you might have fibro bathroom wall linings with asbestos within it and great care should be taken. You will need some full body disposable overalls, eye protection, and quality dust mask. Check with your local building authority or council concerning the regulation on bathroom asbestos wall lining removal.
Remove everything except the plumbing. If you keep the toilet plumbing available you'll not ought to turn the lake off for the complete house. Also you will likely need to jack hammer a floor tiles up and the sand and cement bed they are laid on.
294 best images about Tuscan Inspired Home on Pinterest  Spanish, Powder rooms and Tuscany

Bathroom Renovation and construction
Bathrooms must be construction properly in the start to make sure that the finished job is correct and true. This also ensures the look and appearance of the bathroom could have an incredible finish
The Bathroom Renovation Process

Install water and drainage pipe and electrical wires.

Install wall lining and ceiling and after that install the tub hob and bath.

Waterproof the floor and shower and bath recess.

Correct nov the floor with sand and cement ready for tiling.

Lay floor and wall tiles and then grout.

Install new bathroom vanity, fittings, and taps - install new electrical.
Best 25+ Tuscan furniture ideas on Pinterest  Tuscan living rooms, Tuscan decor and Tuscany decor


Paint ceiling and final  one - Plumbing and electrical
At this time all new plumbing is installed for clean cold and hot water and drainage. Careful attention needs to be taken when positioning the modern plumbing so the plumbing fittings are correct in the event the tiling is finished. For example: To centre a fitting inside a shower recess you have to take into account the thickness from the wall board, tile glue and tile so the fitting will likely be centred following the tiles are in place. The same refers to installing drainage pipes for the toilet; the wall lining and tile thickness should be taken into account hence the pipe is incorporated in the correct position once the toilet is installed after tiling. Also rough inside any new electrical wires without connecting them on the mains power.
17 Best images about Tuscan Style Decor on Pinterest  Tuscan decorating, Wrought iron wall

Step two - Install wall and ceiling linings
Install your 6mm wall lining the constant maintenance to nail the fibro board every 150mm without nailing into the newest pipes and electrical wires. The best way is usually to measure and mark the pipe and wire layout on to your new wall board using a pencil while you go. Screw up (or nail) the ceiling lining, plasterboard could be the most common. However if you are laying your tiles from floor to ceiling tend not to install the cornice as this is most effectively achieved after tiling. If you happen to be not tiling on the ceiling go on and install the cornice following your wallboard and ceiling lining are actually installed. Also if your bath isn't freestanding you can now from the frame and install the tub. Ensure the bathtub is installed correctly allowing for the thickness of the tiles and  sure to evaluate all linings and pipes before you decide to continue with your bathroom renovation.

443 best images about Tuscan Decor on Pinterest
Best 25+ Tuscan furniture ideas on Pinterest  Tuscan decor, Tuscany decor and Tuscan style

Step three - Waterproof your bathroom
Waterproof a bath room floor, shower recess, and around the tub. When waterproofing a floor make sure that the waterproofing comes 100mm the walls. The shower recess must be waterproofed 100mm higher than the shower rose outlet. Also the tub ought to be waterproofed 100mm higher than the lip with the bath around and for the floor. At the doorway purchase a 25 x 25mm aluminum angle glued into place with quality silicone and waterproof in to the lip. Your whole bathroom should now the tanked, and so the all water will only go down a drain. Bathroom waterproofing tip: waterproofing is a simple job but quality and accuracy is most critical.
Step four - Lay in the cement screed for a floor.

Before the floor tiles can laid a floor must be smooth and fairly flat having a slight fall to the drainage outlet. To do this you should use sand and cement mix which is better to put in a waterproofing agent into this at the same time. With a level, set the bottom level at the doorway. Use the top aluminum angle because finished floor level and measure around the thickness with the tile plus 10mm for your glue. Mark right around the bathroom with a level and after that screed within your sand and cement mix having a 1 to 3 degree fall on the top in the drain outlet. Take your time and get it right with all the finished level as smooth as you possibly can. When the sand cement mix has set but is just not dry (it is possible to walk onto it however, you will still be a little soft) rub it over with a house brick. This will remove each of the small highs and lows and appearance with a level while you go. Let the restroom floor fully dry and then you should have an excellent surface to tile onto. Tip: the harder work you add into the floor screed the simpler your tiling will be.
294 best images about Tuscan Inspired Home on Pinterest Spanish, Powder rooms and Tuscany
443 best images about Tuscan Decor on Pinterest

Step five: Tile floor and walls
Lay your tiles on the floor first and after that grout. Then lay your wall tiles making sure that they're level because you lay. Once the bathroom tiles happen to be cut and laid, grout all your tiles then buff the tiles clean.
Step six: Install plumbing fitting and fixtures
Install all your plumbing fittings and taps. Also fit all your towel rails and soap holders. Fit your new bathroom vanity ensuring that it is level and sealed round the top with silicone plus seal around the bathtub. Tip: make sure they will be in the right place when you drill into the tiles.
Best 25+ Tuscan furniture ideas on Pinterest Tuscan living rooms, Tuscan decor and Tuscany decor
294 best images about Tuscan Inspired Home on Pinterest  Spanish, Powder rooms and Tuscany

Step seven: painting, and cleaning - enjoy
Paint your ceiling and do a final clean ensuring things are all fitted correctly which there are no leaks inside your plumbing. - Enjoy a new bathroom.

Comments