Best 25+ Hamptons Kitchen ideas on Pinterest Hampton style, American kitchen and White kitchen

Kitchens Styles And Designs 50 Best Kitchen Styles Dream Kitchen Ideas Best 25+ Hamptons Kitchen ideas on Pinterest Hampton style, American kitchen and White kitchen

Bathroom Renovation - A Step by Step Guide

Bathrooms are one of the smallest rooms inside your home plus they are also certainly the most costly to renovate. Bathroom renovation can be a job that, if done well, may add value to a home and a great space packed with design and light-weight.
Best 25+ Hamptons Kitchen ideas on Pinterest  Hampton style, American kitchen and White kitchen

Bathroom design
Bathroom design will be the first section of a bath room renovation you need to get right. Just replacing the present bathroom with similar design will not be enough. The key to great bathroom design is always to design it using the people that will put it to use in your mind. However make sure that a bath room design even offers a general use factor too.

For example: If you were designing your bathrooms for families you could still design the bathroom with easy accessibility for the shower and bath. This would ensure that the design would work if you have limited mobility. This means if you choose to sell your property or if you happen to be renovating for profit your design carries a wider market appeal. Great bathroom design also uses the room well, taking into consideration the sunshine or window space, size of fittings, and drainage options. Draw out a plan to scale and right down the sizes of one's room. Mark the current drainage points then and water inlet points. Write down a wish listing of the restroom fittings to require and want making use of their sizes. Now marry both the together to see what fits. Note: Most bathroom drainage and water inlet points can be moved but this certainly does come at expense.
50 Best Modern Kitchen Design Ideas for 2019

Bathroom remodel
If you've decided to complete the task yourself or part of the project it really is time to hire a skip bin and pull out the existing bathroom. If your home was made pre 1980 maybe you have fibro bathroom wall linings with asbestos within it and great care should be taken. You will need some full body disposable overalls, eye protection, and quality dust mask. Check with your neighborhood building authority or council in connection with regulation on bathroom asbestos wall lining removal.
Remove everything except the plumbing. If you keep the restroom plumbing in place you will not ought to turn the river off for the whole house. Also you should jack hammer a floor tiles up along with the sand and cement bed they are laid on.
39 Dream Barn Kitchen Designs  DigsDigs

Bathroom Renovation and construction
Bathrooms have to be construction properly through the ground up to be sure that the finished job is correct and true. This also ensures the style and appearance of the toilet may have an excellent finish
The Bathroom Renovation Process

Install water and drainage pipe and electrical wires.

Install wall lining and ceiling then install the bathtub hob and bath.

Waterproof a floor and shower and bath recess.

Correct late a floor with sand and cement ready for tiling.

Lay floor and wall tiles after which grout.

Install new bathroom vanity, fittings, and taps - install new electrical.
39 Dream Barn Kitchen Designs  DigsDigs


Paint ceiling and final  one - Plumbing and electrical
At this aspect brand new plumbing is installed for clean cold and hot water and drainage. Careful attention has to be taken when positioning the new plumbing so that the plumbing fittings are correct once the tiling is fully gone. For example: To centre a fitting in a very shower recess you have to think about the thickness with the wall board, tile glue and tile so the fitting will be centred following the tiles are in position. The same relates to installing drainage pipes for the toilet; the wall lining and tile thickness must be considered therefore the pipe is within the correct position if the toilet is installed after tiling. Also rough inside the any new electrical wires without connecting them towards the mains power.
50 Best Kitchen Styles  Dream Kitchen Ideas

Step two - Install wall and ceiling linings
Install your 6mm wall lining being careful to nail the fibro board every 150mm without nailing into the modern pipes and electrical wires. The best way is always to measure and mark the pipe and wire layout on your new wall board having a pencil because you go. Screw up (or nail) the ceiling lining, plasterboard is the most common. However if you are laying your tiles from floor to ceiling tend not to install the cornice because this is best done after tiling. If you might be not tiling to the ceiling just install the cornice following your wallboard and ceiling lining are actually installed. Also if your bath is not freestanding now you can make up the frame and install the bathtub. Ensure the bathtub is installed correctly permitting the thickness in the tiles and  sure to check all linings and pipes before you decide to continue with your bathroom renovation.

50 Best Modern Kitchen Design Ideas for 2019
Best 25+ Hamptons Kitchen ideas on Pinterest  Hampton style, American kitchen and White kitchen

Step three - Waterproof a bath room
Waterproof your bathroom floor, shower recess, and around the bathtub. When waterproofing the ground be sure that the waterproofing comes 100mm the walls. The shower recess should be waterproofed 100mm above the shower rose outlet. Also the bath ought to be waterproofed 100mm above the lip of the bath around and for the floor. At the doorway install a 25 x 25mm aluminum angle glued into place with quality silicone and waterproof in the lip. Your whole bathroom should now the tanked, therefore the all water will simply go down a drain. Bathroom waterproofing tip: waterproofing is a straightforward job but quality and accuracy is most significant.
Step four - Lay inside the cement screed for the ground.

Before a floor tiles can laid the bottom must be smooth and fairly flat using a slight fall on the drainage outlet. To do this you must use sand and cement mix in fact it is advisable to include a waterproofing agent into this also. With a level, set a floor level at the doorway. Use the top aluminum angle because finished floor level and measure around the thickness from the tile plus 10mm for your glue. Mark right around the lavatory having a level and then screed in your sand and cement mix with a 1 to 3 degree fall on the top of the drain outlet. Take your time and have it right while using finished level as smooth as possible. When the sand cement mix has set but is not dry (you are able to walk on it nevertheless, you it is still a bit soft) rub it over with a house brick. This will remove all the small highs and lows and appearance having a level when you go. Let the bathroom floor fully dry and then you really should have a great surface to tile onto. Tip: the harder work you place into the floor screed the simpler your tiling is going to be.
39 Dream Barn Kitchen Designs DigsDigs
50 Best Modern Kitchen Design Ideas for 2019

Step five: Tile floor and walls
Lay your tiles on the ground first after which grout. Then lay your wall tiles making certain that they're level while you lay. Once the restroom tiles have been cut and laid, grout your entire tiles and then buff the tiles clean.
Step six: Install plumbing fitting and fixtures
Install all of your plumbing fittings and taps. Also fit your towel rails and soap holders. Fit your new bathroom vanity making sure it can be level and sealed across the top with silicone plus seal around the bath. Tip: make sure they come in the right place before you decide to drill into your tiles.
39 Dream Barn Kitchen Designs DigsDigs
39 Dream Barn Kitchen Designs  DigsDigs

Step seven: painting, and cleaning - enjoy
Paint your ceiling and perform final clean making sure things are fitted correctly understanding that there are no leaks with your plumbing. - Enjoy your bathroom.

Comments