Bathroom Renovation - A Step by Step Guide

Bathrooms are among the smallest rooms at home and they are also the most expensive for renovate. Bathroom renovation is often a job that, if done well, will add value to some home along with a great space brimming with design and lightweight.
Best 25+ Container house design ideas on Pinterest  Container houses, Container architecture

Bathroom design
Bathroom design is the first part of your bathrooms renovation you need right. Just replacing the present bathroom sticking with the same design might not be enough. The key to great bathroom design is always to design it while using individuals who will certainly apply it in your mind. However ensure that a bath room design even offers an over-all use factor at the same time.

For example: If you were designing your bathrooms for families you may still design the bathroom with comfortable access on the shower and bath. This would make certain that the design would work if you have limited mobility. This means if you sell your home or if you happen to be renovating for profit your design carries a wider market appeal. Great bathroom design also uses space well, looking at the lighting or window space, height and width of fittings, and drainage options. Draw out an idea to scale and right down the sizes of your room. Mark the prevailing drainage points then and water inlet points. Write down a wish report on the toilet fittings to require and wish using their sizes. Now marry the two together to see what fits. Note: Most bathroom drainage and water inlet points could be moved but this will come at extra cost.
Container House Blueprint Pictures  ISO Container Architecture  Shipping container home

Bathroom remodel
If you have chosen to do the task yourself or part of the job it really is time to engage a skip bin and grab the old bathroom. If your own home appeared pre 1980 maybe you have fibro bathroom wall linings with asbestos in it and great care will have to be taken. You will need some full body disposable overalls, eye protection, and quality dust mask. Check with your neighborhood building authority or council about the regulation on bathroom asbestos wall lining removal.
Remove everything except the plumbing. If you keep the toilet plumbing available you will not ought to turn the water off for the whole house. Also you should jack hammer the ground tiles up along with the sand and cement bed actually laid on.
Shipping Container HOMES PLANS and MODULAR REFAB Design Ideas  SPLAYBOX 1280  YouTube

Bathroom Renovation and construction
Bathrooms have to be construction properly in the ground-up to ensure that the finished job is correct and true. This also ensures the structure and appearance of the lavatory will have a great finish
The Bathroom Renovation Process

Install water and drainage pipe and electrical wires.

Install wall lining and ceiling after which install the bathtub hob and bath.

Waterproof the ground and shower and bath recess.

Correct the fall of the ground with sand and cement ready for tiling.

Lay floor and wall tiles then grout.

Install new bathroom vanity, fittings, and taps - install new electrical.
Shipping Container Home Floorplans


Paint ceiling and final  one - Plumbing and electrical
At this point many new plumbing is installed for clean cold and hot water and drainage. Careful attention must be taken when positioning the newest plumbing so that the plumbing fittings are correct when the tiling is completed. For example: To centre a fitting in a very shower recess you should think about the thickness with the wall board, tile glue and tile and so the fitting will likely be centred after the tiles are in place. The same relates to installing drainage pipes for any toilet; the wall lining and tile thickness must be considered hence the pipe is in the correct position in the event the toilet is installed after tiling. Also rough inside any new electrical wires without connecting them to the mains power.
Introduction to Container Homes  Buildings  Tiny House Design

Step two - Install wall and ceiling linings
Install your 6mm wall lining being careful to nail the fibro board every 150mm without nailing into the newest pipes and electrical wires. The best way is usually to measure and mark the pipe and wire layout on to your new wall board using a pencil because you go. Screw up (or nail) the ceiling lining, plasterboard may be the most common. However if you are laying your tiles from floor to ceiling don't install the cornice because done after tiling. If you are not tiling on the ceiling go on and install the cornice as soon as the wallboard and ceiling lining have been installed. Also if your bath is just not freestanding now you can from the frame and install the bathtub. Ensure the tub is installed correctly enabling the thickness in the tiles and  sure to test all linings and pipes before you decide to continue with a bath room renovation.

Container House Blueprint Pictures ISO Container Architecture Shipping container home
Best 25+ Container house design ideas on Pinterest  Container houses, Container architecture

Step three - Waterproof a bath room
Waterproof your bathroom floor, shower recess, and around the bathtub. When waterproofing the ground ensure that the waterproofing comes 100mm the walls. The shower recess must be waterproofed 100mm higher than the shower rose outlet. Also the bathtub must be waterproofed 100mm higher than the lip of the bath right around and towards the floor. At the doorway use a 25 x 25mm aluminum angle glued into place with quality silicone and waterproof in the lip. Your whole bathroom should now the tanked, therefore the all water will only go lower a drain. Bathroom waterproofing tip: waterproofing is a straightforward job but quality and accuracy is most critical.
Step four - Lay within the cement screed for the ground.

Before the ground tiles can laid a floor has to be smooth and fairly flat having a slight fall towards the drainage outlet. To do this you need to use sand and cement mix which is advisable to give a waterproofing agent into this as well. With a level, set a floor level at the doorway. Use the top aluminum angle because the finished floor level and measure on the thickness in the tile plus 10mm for that glue. Mark about the lavatory with a level then screed within your sand and cement mix having a 1 to 3 degree fall to the top from the drain outlet. Take your time and have it right with all the finished level as smooth as you possibly can. When the sand cement mix has set but is just not dry (it is possible to walk into it nevertheless, you it is still somewhat soft) rub it over with a house brick. This will remove every one of the small highs and lows and appearance having a level as you go. Let the lavatory floor fully dry and after that you should have a fantastic surface to tile onto. Tip: the more work you place into the floor screed the easier your tiling will probably be.
Shipping Container HOMES PLANS and MODULAR REFAB Design Ideas SPLAYBOX 1280 YouTube
Container House Blueprint Pictures  ISO Container Architecture  Shipping container home

Step five: Tile floor and walls
Lay your tiles on the floor first and then grout. Then lay your wall tiles ensuring that they are level when you lay. Once the lavatory tiles have been cut and laid, grout all your tiles and after that buff the tiles clean.
Step six: Install plumbing fitting and fixtures
Install all of your plumbing fittings and taps. Also fit all your towel rails and soap holders. Fit a new bathroom vanity making certain it can be level and sealed throughout the top with silicone as well as seal around the tub. Tip: make sure they will be in the right place before you drill in your tiles.
Shipping Container Home Floorplans
Shipping Container HOMES PLANS and MODULAR REFAB Design Ideas  SPLAYBOX 1280  YouTube

Step seven: painting, and cleaning - enjoy
Paint your ceiling and perform final clean ensuring things are all fitted correctly knowning that there are no leaks within your plumbing. - Enjoy a new bathroom.