Bathroom Renovation - A Step by Step Guide

Bathrooms are probably the smallest rooms inside your home and they're also certainly the most expensive to renovate. Bathroom renovation is really a job that, if done well, can add value with a home plus a great space brimming with design and light.
Beautiful contemporary home designs  Kerala home design and floor plans

Bathroom design
Bathroom design may be the first part of your bathrooms renovation you need right. Just replacing the present bathroom with the exact same design will not be enough. The key to great bathroom design is usually to design it while using people who will certainly apply it at heart. However ensure that your bathrooms design also has a broad use factor as well.

For example: If you were designing a bath room for families you might still design the lavatory with easy accessibility to the shower and bath. This would ensure that the style would also work for people with limited mobility. This means if you sell your own home or if you happen to be renovating for profit your design has a wider market appeal. Great bathroom design also uses the space well, looking at the light or window space, height and width of fittings, and drainage options. Draw out an agenda to scale and down the sizes of the room. Mark the existing drainage points then and water inlet points. Write down a wish listing of the lavatory fittings to want and wish using sizes. Now marry both together and find out what fits. Note: Most bathroom drainage and water inlet points could be moved but this does come at expense.
Interior Exterior Plan  Grand Design Plan for Modern Exteriors

Bathroom remodel
If you have chosen to do the job yourself or part of the job it is time to hire a skip bin and grab that old bathroom. If your house appeared pre 1980 you may have fibro bathroom wall linings with asbestos within it and great care should be taken. You will need some full body disposable overalls, eye protection, and quality dust mask. Check with your local building authority or council about the regulation on bathroom asbestos wall lining removal.
Remove everything except the plumbing. If you keep the bathroom plumbing in position you won't need to turn the lake off for your house. Also you will need to jack hammer a floor tiles up and the sand and cement bed that they are laid on.
چیدمان پذیرایی خانه های امروزی با ایده های بکر و زیبا

Bathroom Renovation and construction
Bathrooms has to be construction properly in the start to make certain that the finished job is correct and true. This also ensures the structure and look of the restroom can have a great finish
The Bathroom Renovation Process

Install water and drainage pipe and electrical wires.

Install wall lining and ceiling after which install the tub hob and bath.

Waterproof a floor and shower and bath recess.

Correct the fall of a floor with sand and cement ready for tiling.

Lay floor and wall tiles and after that grout.

Install new bathroom vanity, fittings, and taps - install new electrical.
Top 50 Modern House Designs  Modern House Designs 2016  YouTube


Paint ceiling and final  one - Plumbing and electrical
At now brand new plumbing is installed for clean cold and warm water and drainage. Careful attention has to be taken when positioning the newest plumbing in order that the plumbing fittings are correct in the event the tiling is fully gone. For example: To centre a fitting in a very shower recess you need to think about the thickness from the wall board, tile glue and tile and so the fitting is going to be centred following your tiles are available. The same relates to installing drainage pipes for any toilet; the wall lining and tile thickness should be taken into consideration so the pipe is in the correct position if the toilet is installed after tiling. Also rough inside any new electrical wires without connecting them to the mains power.
Fabulous Duplex Interior Design in Bangalore  HOME DESIGN ADVISOR  HOME DESIGN ADVISOR  Home

Step two - Install wall and ceiling linings
Install your 6mm wall lining being careful to nail the fibro board every 150mm without nailing into the brand new pipes and electrical wires. The best way is usually to measure and mark the pipe and wire layout onto your new wall board with a pencil because you go. Screw up (or nail) the ceiling lining, plasterboard will be the most common. However if you happen to be laying your tiles from floor to ceiling do not install the cornice as this is most effectively achieved after tiling. If you happen to be not tiling for the ceiling proceed to install the cornice following the wallboard and ceiling lining are already installed. Also if your bath just isn't freestanding you can now form the frame and install the tub. Ensure the bath is installed correctly allowing for the thickness in the tiles and  sure to check all linings and pipes when you continue with your bathroom renovation.

Interior Exterior Plan Grand Design Plan for Modern Exteriors
Beautiful contemporary home designs  Kerala home design and floor plans

Step three - Waterproof a bath room
Waterproof a bath room floor, shower recess, and around the bath. When waterproofing the floor be sure that the waterproofing comes 100mm the walls. The shower recess must be waterproofed 100mm higher than the shower rose outlet. Also the tub must be waterproofed 100mm over the lip from the bath right around and on the floor. At the doorway purchase a 25 x 25mm aluminum angle glued into place with quality silicone and waterproof in to the lip. Your whole bathroom should now the tanked, hence the all water is only going to go lower a drain. Bathroom waterproofing tip: waterproofing is an easy job but quality and accuracy is most important.
Step four - Lay within the cement screed for the floor.

Before a floor tiles can laid the ground has to be smooth and fairly flat using a slight fall to the drainage outlet. To do this you have to use sand and cement mix which is advisable to put in a waterproofing agent into this also. With a level, set the ground level with the doorway. Use the top aluminum angle since the finished floor level and measure down the thickness from the tile plus 10mm to the glue. Mark right around the toilet having a level and then screed within your sand and cement mix with a 1 to 3 degree fall to the top with the drain outlet. Take your time and obtain it right with the finished level as smooth as possible. When the sand cement mix has set but just isn't dry (you'll be able to walk into it nevertheless, you will still be a little soft) rub it over with a house brick. This will remove all the small highs and lows and look which has a level when you go. Let the bathroom floor fully dry then you needs to have a fantastic surface to tile onto. Tip: the greater work you place into a floor screed the more your tiling will likely be.
چیدمان پذیرایی خانه های امروزی با ایده های بکر و زیبا
Interior Exterior Plan  Grand Design Plan for Modern Exteriors

Step five: Tile floor and walls
Lay your tiles on the bottom first after which grout. Then lay your wall tiles making certain that they're level as you lay. Once the lavatory tiles are actually cut and laid, grout all of your tiles after which buff the tiles clean.
Step six: Install plumbing fitting and fixtures
Install all your plumbing fittings and taps. Also fit all of your towel rails and soap holders. Fit your bathroom vanity making certain it can be level and sealed throughout the top with silicone as well as seal around the bath. Tip: make sure they are in the right place prior to deciding to drill to your tiles.
Top 50 Modern House Designs Modern House Designs 2016 YouTube
چیدمان پذیرایی خانه های امروزی با ایده های بکر و زیبا

Step seven: painting, and cleaning - enjoy
Paint your ceiling and do a final clean ensuring that everything is fitted correctly understanding that there are no leaks within your plumbing. - Enjoy your new bathroom.

Comments