Bathroom Renovation - A Step by Step Guide

Bathrooms are some of the smallest rooms inside your home plus they are also one the most costly to renovate. Bathroom renovation is a job that, if done well, can also add value to a home as well as a great space filled with design and light.
Basement Remodeling Ideas: Bar For Basement

Bathroom design
Bathroom design could be the first division of your bathrooms renovation you need to get right. Just replacing the prevailing bathroom sticking with the same design will not be enough. The key to great bathroom design is always to design it with all the individuals who will certainly use it at heart. However make certain that your bathrooms design even offers a broad use factor too.

For example: If you were designing your bathroom for families you can still design the toilet with comfortable access to the shower and bath. This would make certain that the style would also work for those who have limited mobility. This means if you choose to sell your home or if you might be renovating for profit your design features a wider market appeal. Great bathroom design also uses space well, looking at the sunlight or window space, size of fittings, and drainage options. Draw out a plan to scale and right down the sizes of your respective room. Mark the present drainage points and after that and water inlet points. Write down a wish report on the toilet fittings to wish and need with their sizes. Now marry the two together to see what fits. Note: Most bathroom drainage and water inlet points could be moved but this does come at expense.
Beautiful Wet Bar Ideas For Basement 9 Basement Wet Bar Designs  Smalltowndjs.com

Bathroom remodel
If you've decided to accomplish the work yourself or part of the work it can be time to employ a skip bin and retrieve the previous bathroom. If your own home appeared pre 1980 you may have fibro bathroom wall linings with asbestos in it and great care must be taken. You will need some full body disposable overalls, eye protection, and quality dust mask. Check with your local building authority or council regarding the regulation on bathroom asbestos wall lining removal.
Remove everything except the plumbing. If you keep the bathroom plumbing available you will not have to turn the water off for the entire house. Also you will likely need to jack hammer the bottom tiles up and the sand and cement bed that they are laid on.
Wet Bar

Bathroom Renovation and construction
Bathrooms should be construction properly through the ground up to ensure that the finished job is correct and true. This also ensures the look and appear of the lavatory can have an excellent finish
The Bathroom Renovation Process

Install water and drainage pipe and electrical wires.

Install wall lining and ceiling after which install the tub hob and bath.

Waterproof the bottom and shower and bath recess.

Correct late the bottom with sand and cement ready for tiling.

Lay floor and wall tiles after which grout.

Install new bathroom vanity, fittings, and taps - install new electrical.
Best 25+ Small basement bars ideas on Pinterest  Man cave ideas small basement, Small bar areas


Paint ceiling and final  one - Plumbing and electrical
At this time new plumbing is installed for clean cold and hot water and drainage. Careful attention must be taken when positioning the brand new plumbing so your plumbing fittings are correct in the event the tiling is fully gone. For example: To centre a fitting in a very shower recess you must think about the thickness of the wall board, tile glue and tile so the fitting will likely be centred following the tiles are set up. The same pertains to installing drainage pipes for the toilet; the wall lining and tile thickness must be looked at hence the pipe is in the correct position in the event the toilet is installed after tiling. Also rough in the any new electrical wires without connecting them for the mains power.
Basement Wet Bar Ideas, Basement Wet Bar Ideas  Vendermicasa

Step two - Install wall and ceiling linings
Install your 6mm wall lining being careful to nail the fibro board every 150mm without nailing into the new pipes and electrical wires. The best way is to measure and mark the pipe and wire layout onto your new wall board with a pencil as you go. Screw up (or nail) the ceiling lining, plasterboard may be the most common. However if you might be laying your tiles from floor to ceiling tend not to install the cornice as this is done after tiling. If you are not tiling on the ceiling go on and install the cornice following the wallboard and ceiling lining are actually installed. Also if your bath is not freestanding anyone can from the frame and install the bath. Ensure the bath is installed correctly permitting the thickness of the tiles and  sure to evaluate all linings and pipes when you continue with your bathrooms renovation.

Beautiful Wet Bar Ideas For Basement 9 Basement Wet Bar Designs Smalltowndjs.com
Basement Remodeling Ideas: Bar For Basement

Step three - Waterproof your bathrooms
Waterproof your bathrooms floor, shower recess, and around the tub. When waterproofing the ground ensure that the waterproofing comes 100mm inside the walls. The shower recess will need to be waterproofed 100mm across the shower rose outlet. Also the tub must be waterproofed 100mm over the lip of the bath about and for the floor. At the doorway put in a 25 x 25mm aluminum angle glued into place with quality silicone and waterproof in the lip. Your whole bathroom should now the tanked, so the all water will only decrease a drain. Bathroom waterproofing tip: waterproofing is an easy job but quality and accuracy is most crucial.
Step four - Lay in the cement screed for the floor.

Before a floor tiles can laid the floor must be smooth and fairly flat having a slight fall on the drainage outlet. To do this you should use sand and cement mix and it is far better to put in a waterproofing agent into this also. With a level, set the bottom level in the doorway. Use the top aluminum angle as the finished floor level and measure on the thickness of the tile plus 10mm for that glue. Mark around the restroom which has a level and after that screed with your sand and cement mix using a 1 to 3 degree fall to the top from the drain outlet. Take your time and obtain it right while using finished level as smooth as possible. When the sand cement mix has set but isn't dry (it is possible to walk on it nevertheless, you it is still a bit soft) rub it over having a house brick. This will remove each of the small highs and lows and appearance using a level while you go. Let the lavatory floor fully dry and then you must have an excellent surface to tile onto. Tip: the harder work you place into the ground screed the easier your tiling will probably be.
Wet Bar
Beautiful Wet Bar Ideas For Basement 9 Basement Wet Bar Designs  Smalltowndjs.com

Step five: Tile floor and walls
Lay your tiles on the ground first after which grout. Then lay your wall tiles making sure actually level when you lay. Once the toilet tiles happen to be cut and laid, grout all your tiles and then buff the tiles clean.
Step six: Install plumbing fitting and fixtures
Install your entire plumbing fittings and taps. Also fit all your towel rails and soap holders. Fit a new bathroom vanity making certain it is level and sealed round the top with silicone plus seal around the bath. Tip: make sure they will be in the right place when you drill into your tiles.
Best 25+ Small basement bars ideas on Pinterest Man cave ideas small basement, Small bar areas
Wet Bar

Step seven: painting, and cleaning - enjoy
Paint your ceiling and execute a final clean ensuring that everything is fitted correctly knowning that there aren't any leaks in your plumbing. - Enjoy your bathroom.