Bathroom Renovation - A Step by Step Guide

Bathrooms are one of the smallest rooms in the home plus they are also the most expensive for renovate. Bathroom renovation is often a job that, if done well, can also add value to a home along with a great space full of design and light.
Basement Finishing Ideas  Your Dream Home

Bathroom design
Bathroom design may be the first part of your bathroom renovation you need to get right. Just replacing the existing bathroom with similar design will not be enough. The key to great bathroom design is to design it with all the people who are likely to put it to use in your mind. However make sure that a bath room design even offers a broad use factor also.

For example: If you were designing a bath room for families you may still design the bathroom with easy accessibility for the shower and bath. This would make certain that the style would work for those who have limited mobility. This means if you opt to sell your home or if you are renovating for profit your design includes a wider market appeal. Great bathroom design also uses the room well, taking into account the sunshine or window space, sized fittings, and drainage options. Draw out a plan to scale and right down the sizes of one's room. Mark the current drainage points after which and water inlet points. Write down a wish listing of the toilet fittings to need and need with their sizes. Now marry both together and see what fits. Note: Most bathroom drainage and water inlet points may be moved but this does come at extra cost.
Basement Finishing Ideas  Your Dream Home

Bathroom remodel
If you decide to complete the task yourself or part of the project it really is time to hire a skip bin and retrieve the previous bathroom. If your own home was developed pre 1980 you might have fibro bathroom wall linings with asbestos within it and great care will have to be taken. You will need some full body disposable overalls, eye protection, and quality dust mask. Check with the local building authority or council regarding the regulation on bathroom asbestos wall lining removal.
Remove everything except the plumbing. If you keep the bathroom plumbing set up you do not have to turn the lake off for the complete house. Also you should jack hammer the bottom tiles up along with the sand and cement bed that they are laid on.
Ideas For A Finished Basements — New Home Design

Bathroom Renovation and construction
Bathrooms must be construction properly through the start to make certain that the finished job is correct and true. This also ensures the design and appear of the restroom will have a great finish
The Bathroom Renovation Process

Install water and drainage pipe and electrical wires.

Install wall lining and ceiling and then install the bathtub hob and bath.

Waterproof the ground and shower and bath recess.

Correct december the floor with sand and cement ready for tiling.

Lay floor and wall tiles and after that grout.

Install new bathroom vanity, fittings, and taps - install new electrical.
Chris  Saras Basement Remodel Pictures  Home Remodeling Contractors  Sebring Design Build


Paint ceiling and final  one - Plumbing and electrical
At this point brand new plumbing is installed for clean cold and hot water and drainage. Careful attention needs to be taken when positioning the brand new plumbing in order that the plumbing fittings are correct once the tiling is finished. For example: To centre a fitting in a shower recess you need to think about the thickness in the wall board, tile glue and tile so the fitting will likely be centred as soon as the tiles are in position. The same refers to installing drainage pipes for any toilet; the wall lining and tile thickness have to be taken into account therefore the pipe is incorporated in the correct position if the toilet is installed after tiling. Also rough within the any new electrical wires without connecting them towards the mains power.
294 best images about Basements, Man Caves  Rec Rooms on Pinterest  Basement ideas, Rustic

Step two - Install wall and ceiling linings
Install your 6mm wall lining the constant maintenance to nail the fibro board every 150mm without nailing into the brand new pipes and electrical wires. The best way is usually to measure and mark the pipe and wire layout on to your new wall board which has a pencil as you go. Screw up (or nail) the ceiling lining, plasterboard may be the most common. However if you're laying your tiles from floor to ceiling usually do not install the cornice because most effectively achieved after tiling. If you might be not tiling on the ceiling go on and install the cornice after the wallboard and ceiling lining have been installed. Also if your bath isn't freestanding anyone can form the frame and install the bath. Ensure the tub is installed correctly enabling the thickness of the tiles and  sure to check on all linings and pipes before you continue with a bath room renovation.

Basement Finishing Ideas Your Dream Home
Basement Finishing Ideas  Your Dream Home

Step three - Waterproof a bath room
Waterproof your bathrooms floor, shower recess, and around the bath. When waterproofing the bottom make sure that the waterproofing comes 100mm inside the walls. The shower recess will need to be waterproofed 100mm over the shower rose outlet. Also the bathtub ought to be waterproofed 100mm higher than the lip with the bath right around and on the floor. At the doorway purchase a 25 x 25mm aluminum angle glued into place with quality silicone and waterproof into the lip. Your whole bathroom should now the tanked, and so the all water will only go down a drain. Bathroom waterproofing tip: waterproofing is a simple job but quality and accuracy is most critical.
Step four - Lay inside the cement screed for the ground.

Before the floor tiles can laid the floor have to be smooth and fairly flat using a slight fall to the drainage outlet. To do this you should use sand and cement mix and it's also advisable to include a waterproofing agent into this at the same time. With a level, set the ground level with the doorway. Use the top aluminum angle as the finished floor level and measure down the thickness in the tile plus 10mm for the glue. Mark about the restroom having a level after which screed with your sand and cement mix with a 1 to 3 degree fall to the top from the drain outlet. Take your time and get it right while using finished level as smooth as possible. When the sand cement mix has set but is not dry (you can walk into it but you it is still a lttle bit soft) rub it over using a house brick. This will remove all the small highs and lows and check having a level as you go. Let the bathroom floor fully dry and then you needs to have a fantastic surface to tile onto. Tip: the greater work you place into a floor screed the easier your tiling will be.
Ideas For A Finished Basements — New Home Design
Basement Finishing Ideas  Your Dream Home

Step five: Tile floor and walls
Lay your tiles on the bottom first and then grout. Then lay your wall tiles making certain actually level while you lay. Once the restroom tiles happen to be cut and laid, grout your tiles and after that buff the tiles clean.
Step six: Install plumbing fitting and fixtures
Install your entire plumbing fittings and taps. Also fit your entire towel rails and soap holders. Fit your new bathroom vanity making certain it's level and sealed across the top with silicone as well as seal around the tub. Tip: make sure they are in the right place before you decide to drill into your tiles.
Chris Saras Basement Remodel Pictures Home Remodeling Contractors Sebring Design Build
Ideas For A Finished Basements — New Home Design

Step seven: painting, and cleaning - enjoy
Paint your ceiling and execute a final clean ensuring things are fitted correctly which there are no leaks within your plumbing. - Enjoy your new bathroom.