Basement Designed by Jooca Studio Home theatre Andover, US Arcbazar

Home Theater Design Plans Basement Designed by Jooca Studio Home theatre Andover, US Arcbazar

Bathroom Renovation - A Step by Step Guide

Bathrooms are some of the smallest rooms at home and they're also one the most expensive to renovate. Bathroom renovation can be a job that, if done well, will add value to some home plus a great space full of design and lightweight.
Basement Designed by Jooca Studio  Home theatre  Andover, US  Arcbazar

Bathroom design
Bathroom design may be the first area of a bath room renovation you should get right. Just replacing the present bathroom with the same design is probably not enough. The key to great bathroom design is always to design it using the people that are going to use it planned. However make sure that your bathroom design boasts a general use factor also.

For example: If you were designing a bath room for families you could still design the lavatory with easy access towards the shower and bath. This would make sure that the style would recieve treatment for people with limited mobility. This means if you sell your house or if you are renovating for profit your design carries a wider market appeal. Great bathroom design also uses space well, looking at the lighting or window space, size fittings, and drainage options. Draw out an idea to scale and down the sizes of your room. Mark the present drainage points after which and water inlet points. Write down a wish set of the toilet fittings to require and wish using sizes. Now marry the two together and discover what fits. Note: Most bathroom drainage and water inlet points may be moved but this certainly does come at expense.
Home Theater Ideas  Interior Design  YouTube

Bathroom remodel
If you decide to complete the work yourself or part of the job it can be time to hire a skip bin and pull out the old bathroom. If your property is made pre 1980 you may have fibro bathroom wall linings with asbestos inside and great care should be taken. You will need some full body disposable overalls, eye protection, and quality dust mask. Check with your local building authority or council in connection with regulation on bathroom asbestos wall lining removal.
Remove everything except the plumbing. If you keep the bathroom plumbing set up you'll not must turn the water off for the entire house. Also you will need to jack hammer the ground tiles up along with the sand and cement bed actually laid on.
Three Common Home Theater Layout Mistakes Even the Pros Make  Acoustic Frontiers

Bathroom Renovation and construction
Bathrooms must be construction properly from your start to ensure that the finished job is correct and true. This also ensures the look and search of the toilet could have a fantastic finish
The Bathroom Renovation Process

Install water and drainage pipe and electrical wires.

Install wall lining and ceiling after which install the bathtub hob and bath.

Waterproof a floor and shower and bath recess.

Correct december the ground with sand and cement ready for tiling.

Lay floor and wall tiles and after that grout.

Install new bathroom vanity, fittings, and taps - install new electrical.
Home Theater Room Design on House Plans Home Plans House Floor Plan Designs Nelson  Home


Paint ceiling and final  one - Plumbing and electrical
At now new plumbing is installed for clean hot and cold water and drainage. Careful attention must be taken when positioning the newest plumbing so your plumbing fittings are correct in the event the tiling is fully gone. For example: To centre a fitting in a shower recess you should take into consideration the thickness from the wall board, tile glue and tile and so the fitting will likely be centred following your tiles are available. The same refers to installing drainage pipes for any toilet; the wall lining and tile thickness have to be considered and so the pipe is incorporated in the correct position in the event the toilet is installed after tiling. Also rough inside the any new electrical wires without connecting them on the mains power.
Home Theater Design Ideas: Pictures, Tips  Options  HGTV

Step two - Install wall and ceiling linings
Install your 6mm wall lining the constant maintenance to nail the fibro board every 150mm without nailing into the brand new pipes and electrical wires. The best way is usually to measure and mark the pipe and wire layout onto your new wall board with a pencil while you go. Screw up (or nail) the ceiling lining, plasterboard could be the most common. However if you are laying your tiles from floor to ceiling tend not to install the cornice because most effectively achieved after tiling. If you're not tiling towards the ceiling go ahead and install the cornice after the wallboard and ceiling lining are already installed. Also if your bath is not freestanding now you can make up the frame and install the tub. Ensure the bath is installed correctly allowing for the thickness with the tiles and  sure to check on all linings and pipes prior to deciding to continue with your bathroom renovation.

Home Theater Ideas Interior Design YouTube
Basement Designed by Jooca Studio  Home theatre  Andover, US  Arcbazar

Step three - Waterproof a bath room
Waterproof your bathrooms floor, shower recess, and around the tub. When waterproofing the ground make sure that the waterproofing comes 100mm the walls. The shower recess must be waterproofed 100mm above the shower rose outlet. Also the bath must be waterproofed 100mm above the lip of the bath around and to the floor. At the doorway put in a 25 x 25mm aluminum angle glued into place with quality silicone and waterproof in the lip. Your whole bathroom should now the tanked, hence the all water will still only decrease a drain. Bathroom waterproofing tip: waterproofing is a simple job but quality and accuracy is most significant.
Step four - Lay inside cement screed for the bottom.

Before the bottom tiles can laid the ground should be smooth and fairly flat which has a slight fall to the drainage outlet. To do this you should use sand and cement mix in fact it is advisable to add a waterproofing agent into this at the same time. With a level, set the floor level in the doorway. Use the top aluminum angle because the finished floor level and measure along the thickness from the tile plus 10mm for the glue. Mark around the toilet having a level after which screed within your sand and cement mix using a 1 to 3 degree fall for the top from the drain outlet. Take your time and get it right using the finished level as smooth as possible. When the sand cement mix has set but just isn't dry (you can walk onto it however, you it is still a bit soft) rub it over which has a house brick. This will remove all of the small highs and lows and look having a level as you go. Let the lavatory floor fully dry then you really should have a great surface to tile onto. Tip: the more work you place into the bottom screed the more your tiling will likely be.
Three Common Home Theater Layout Mistakes Even the Pros Make Acoustic Frontiers
Home Theater Ideas  Interior Design  YouTube

Step five: Tile floor and walls
Lay your tiles on the ground first then grout. Then lay your wall tiles ensuring they are level as you lay. Once the bathroom tiles are already cut and laid, grout your entire tiles and then buff the tiles clean.
Step six: Install plumbing fitting and fixtures
Install all your plumbing fittings and taps. Also fit your entire towel rails and soap holders. Fit your brand-new bathroom vanity ensuring it is level and sealed round the top with silicone and in addition seal around the tub. Tip: make sure they will be in the right place when you drill in your tiles.
Home Theater Room Design on House Plans Home Plans House Floor Plan Designs Nelson Home
Three Common Home Theater Layout Mistakes Even the Pros Make  Acoustic Frontiers

Step seven: painting, and cleaning - enjoy
Paint your ceiling and perform a final clean ensuring that things are fitted correctly understanding that there won't be any leaks within your plumbing. - Enjoy your new bathroom.

Comments