Backyard Patio Design Ideas

Small Backyard Design Backyard Barbecue Design Ideas Backyard Pool Backyard Patio Design Ideas

Bathroom Renovation - A Step by Step Guide

Bathrooms are probably the smallest rooms in the home plus they are also the most costly to renovate. Bathroom renovation is often a job that, if done well, can also add value to your home as well as a great space brimming with design and lightweight.
Backyard Patio Design Ideas

Bathroom design
Bathroom design could be the first area of a bath room renovation you ought to get right. Just replacing the present bathroom with the same design is probably not enough. The key to great bathroom design is usually to design it with the individuals who will certainly apply it at heart. However ensure that a bath room design boasts a general use factor too.

For example: If you were designing a bath room for families you can still design the toilet with comfortable access on the shower and bath. This would be sure that the structure would recieve treatment for those who have limited mobility. This means if you choose to sell your home or if you're renovating for profit your design features a wider market appeal. Great bathroom design also uses space well, taking into account the sunshine or window space, size fittings, and drainage options. Draw out an agenda to scale and right down the sizes of your respective room. Mark the current drainage points after which and water inlet points. Write down a wish report on the bathroom fittings to wish and want making use of their sizes. Now marry both the together and find out what fits. Note: Most bathroom drainage and water inlet points might be moved but this may come at expense.
20 Outdoor Kitchens and Grilling Stations  HGTV

Bathroom remodel
If you have decided to do the work yourself or part of the project it really is time to engage a skip bin and pull out the existing bathroom. If your property was made pre 1980 you may have fibro bathroom wall linings with asbestos within it and great care will have to be taken. You will need some full body disposable overalls, eye protection, and quality dust mask. Check with your neighborhood building authority or council about the regulation on bathroom asbestos wall lining removal.
Remove everything except the plumbing. If you keep the restroom plumbing set up you'll not must turn the water off for the entire house. Also you will have to jack hammer the ground tiles up and the sand and cement bed actually laid on.
Backyard Landscaping  Parker, CO  Photo Gallery  Landscaping Network

Bathroom Renovation and construction
Bathrooms has to be construction properly from the ground-up to be sure that the finished job is correct and true. This also ensures the design and appearance of the bathroom may have a fantastic finish
The Bathroom Renovation Process

Install water and drainage pipe and electrical wires.

Install wall lining and ceiling then install the bath hob and bath.

Waterproof the floor and shower and bath recess.

Correct nov the floor with sand and cement ready for tiling.

Lay floor and wall tiles then grout.

Install new bathroom vanity, fittings, and taps - install new electrical.
Small Yards  Sunset Magazine


Paint ceiling and final  one - Plumbing and electrical
At this point all new plumbing is installed for clean cold and warm water and drainage. Careful attention should be taken when positioning the modern plumbing so the plumbing fittings are correct in the event the tiling is finished. For example: To centre a fitting in a very shower recess you must think about the thickness from the wall board, tile glue and tile hence the fitting will be centred as soon as the tiles are set up. The same pertains to installing drainage pipes for any toilet; the wall lining and tile thickness should be considered hence the pipe is in the correct position if the toilet is installed after tiling. Also rough inside the any new electrical wires without connecting them towards the mains power.
Fire Pit Design Ideas  Outdoor Spaces  Patio Ideas, Decks  Gardens  HGTV

Step two - Install wall and ceiling linings
Install your 6mm wall lining being careful to nail the fibro board every 150mm without nailing into the modern pipes and electrical wires. The best way would be to measure and mark the pipe and wire layout onto your new wall board having a pencil while you go. Screw up (or nail) the ceiling lining, plasterboard is the most common. However if you happen to be laying your tiles from floor to ceiling don't install the cornice because most effectively achieved after tiling. If you are not tiling to the ceiling just install the cornice as soon as the wallboard and ceiling lining are already installed. Also if your bath is just not freestanding now you can form the frame and install the tub. Ensure the bath is installed correctly allowing for the thickness with the tiles and  sure to check all linings and pipes when you continue with your bathroom renovation.

20 Outdoor Kitchens and Grilling Stations HGTV
Backyard Patio Design Ideas

Step three - Waterproof your bathrooms
Waterproof a bath room floor, shower recess, and around the tub. When waterproofing the floor be sure that the waterproofing comes 100mm the walls. The shower recess will have to be waterproofed 100mm over the shower rose outlet. Also the tub ought to be waterproofed 100mm higher than the lip in the bath right around and on the floor. At the doorway install a 25 x 25mm aluminum angle glued into place with quality silicone and waterproof in the lip. Your whole bathroom should now the tanked, therefore the all water will simply decrease a drain. Bathroom waterproofing tip: waterproofing is a simple job but quality and accuracy is most crucial.
Step four - Lay within the cement screed for the bottom.

Before the bottom tiles can laid the floor has to be smooth and fairly flat which has a slight fall for the drainage outlet. To do this you must use sand and cement mix and it is advisable to include a waterproofing agent into this at the same time. With a level, set the floor level at the doorway. Use the top aluminum angle as the finished floor level and measure around the thickness of the tile plus 10mm for that glue. Mark about the bathroom which has a level after which screed within your sand and cement mix having a 1 to 3 degree fall for the top from the drain outlet. Take your time and acquire it right using the finished level as smooth as is possible. When the sand cement mix has set but is not dry (you can walk about it but you will still be somewhat soft) rub it over which has a house brick. This will remove each of the small highs and lows and appearance using a level when you go. Let the lavatory floor fully dry and after that you must have a great surface to tile onto. Tip: the greater work you add into the floor screed the simpler your tiling will probably be.
Backyard Landscaping Parker, CO Photo Gallery Landscaping Network
20 Outdoor Kitchens and Grilling Stations  HGTV

Step five: Tile floor and walls
Lay your tiles on a floor first and then grout. Then lay your wall tiles making certain that they are level because you lay. Once the restroom tiles are actually cut and laid, grout your tiles and after that buff the tiles clean.
Step six: Install plumbing fitting and fixtures
Install your entire plumbing fittings and taps. Also fit your towel rails and soap holders. Fit your new bathroom vanity ensuring it's level and sealed across the top with silicone plus seal around the tub. Tip: make sure they will be in the right place before you drill into the tiles.
Small Yards Sunset Magazine
Backyard Landscaping  Parker, CO  Photo Gallery  Landscaping Network

Step seven: painting, and cleaning - enjoy
Paint your ceiling and execute a final clean ensuring things are fitted correctly which there are no leaks in your plumbing. - Enjoy your brand-new bathroom.

Comments