Architectural Home Design by Joon Cunanan Category: Private Houses, Type: Exterior

Home Exterior Design Ideas 2 Modern Home Exteriors Terrific 2 New Home Designs Latest : Modern Architectural Home Design by Joon Cunanan Category: Private Houses, Type: Exterior

Bathroom Renovation - A Step by Step Guide

Bathrooms are one of the smallest rooms in the home and they are also one the most expensive for renovate. Bathroom renovation is often a job that, if done well, can also add value with a home and a great space packed with design and light.
Architectural Home Design by Joon Cunanan  Category: Private Houses, Type: Exterior

Bathroom design
Bathroom design is the first area of a bath room renovation you ought to get right. Just replacing the current bathroom with similar design might not be enough. The key to great bathroom design would be to design it with the people that are going to apply it planned. However make certain that your bathroom design also has a general use factor also.

For example: If you were designing your bathroom for families you may still design the toilet with easy access on the shower and bath. This would make certain that the structure would also work for people with limited mobility. This means if you sell your house or if you are renovating for profit your design has a wider market appeal. Great bathroom design also uses the space well, taking into consideration the light or window space, height and width of fittings, and drainage options. Draw out a plan to scale and all the way down the sizes of your room. Mark the present drainage points and after that and water inlet points. Write down a wish list of the toilet fittings to wish and desire with their sizes. Now marry the 2 together and find out what fits. Note: Most bathroom drainage and water inlet points could be moved but this does come at extra cost.
Exterior Designs For Small Houses  Joy Studio Design Gallery  Best Design

Bathroom remodel
If you've decided to complete the job yourself or part of the work it can be time to employ a skip bin and take out the old bathroom. If your property appeared pre 1980 you might have fibro bathroom wall linings with asbestos within it and great care must be taken. You will need some full body disposable overalls, eye protection, and quality dust mask. Check with your local building authority or council in connection with regulation on bathroom asbestos wall lining removal.
Remove everything except the plumbing. If you keep the lavatory plumbing in place you won't have to turn the water off for the entire house. Also you will need to jack hammer the ground tiles up and also the sand and cement bed that they are laid on.
17 Best images about Modern Front Elevations on Pinterest  House plans, Minimalist home design

Bathroom Renovation and construction
Bathrooms have to be construction properly from your ground-up to be sure that the finished job is correct and true. This also ensures the look and appear of the restroom can have a fantastic finish
The Bathroom Renovation Process

Install water and drainage pipe and electrical wires.

Install wall lining and ceiling and then install the tub hob and bath.

Waterproof the floor and shower and bath recess.

Correct late the bottom with sand and cement ready for tiling.

Lay floor and wall tiles and after that grout.

Install new bathroom vanity, fittings, and taps - install new electrical.
modern house exterior painting home design ideas  YouTube


Paint ceiling and final  one - Plumbing and electrical
At now new plumbing is installed for clean cold and warm water and drainage. Careful attention needs to be taken when positioning the newest plumbing in order that the plumbing fittings are correct when the tiling is fully gone. For example: To centre a fitting inside a shower recess you have to take into consideration the thickness in the wall board, tile glue and tile so the fitting will likely be centred after the tiles are set up. The same pertains to installing drainage pipes for any toilet; the wall lining and tile thickness must be taken into consideration so the pipe is incorporated in the correct position once the toilet is installed after tiling. Also rough inside the any new electrical wires without connecting them for the mains power.
Sophisticated Modern Houses Exterior Design Ideas – Amazing Architecture Magazine

Step two - Install wall and ceiling linings
Install your 6mm wall lining fostering to nail the fibro board every 150mm without nailing into the new pipes and electrical wires. The best way is to measure and mark the pipe and wire layout onto your new wall board having a pencil while you go. Screw up (or nail) the ceiling lining, plasterboard could be the most common. However if you might be laying your tiles from floor to ceiling don't install the cornice because this is most effectively achieved after tiling. If you're not tiling towards the ceiling go on and install the cornice following the wallboard and ceiling lining are actually installed. Also if your bath is not freestanding you can now from the frame and install the tub. Ensure the bathtub is installed correctly making it possible for the thickness with the tiles and  sure to check all linings and pipes when you continue with a bath room renovation.

Exterior Designs For Small Houses Joy Studio Design Gallery Best Design
Architectural Home Design by Joon Cunanan  Category: Private Houses, Type: Exterior

Step three - Waterproof your bathroom
Waterproof your bathroom floor, shower recess, and around the tub. When waterproofing the bottom be sure that the waterproofing comes 100mm up the walls. The shower recess will have to be waterproofed 100mm above the shower rose outlet. Also the bath needs to be waterproofed 100mm above the lip from the bath about and to the floor. At the doorway put in a 25 x 25mm aluminum angle glued into place with quality silicone and waterproof into the lip. Your whole bathroom should now the tanked, therefore the all water is only going to drop a drain. Bathroom waterproofing tip: waterproofing is a straightforward job but quality and accuracy is most crucial.
Step four - Lay inside cement screed for the ground.

Before the ground tiles can laid the bottom have to be smooth and fairly flat with a slight fall to the drainage outlet. To do this you need to use sand and cement mix which is best to put in a waterproofing agent into this at the same time. With a level, set the bottom level at the doorway. Use the top aluminum angle because the finished floor level and measure around the thickness of the tile plus 10mm for your glue. Mark about the lavatory having a level then screed with your sand and cement mix using a 1 to 3 degree fall on the top of the drain outlet. Take your time and get it right while using finished level as smooth as you possibly can. When the sand cement mix has set but just isn't dry (you'll be able to walk about it however, you it is still somewhat soft) rub it over having a house brick. This will remove all the small highs and lows and appearance using a level as you go. Let the lavatory floor fully dry then you must have an incredible surface to tile onto. Tip: the greater work you place into the floor screed the more your tiling will probably be.
17 Best images about Modern Front Elevations on Pinterest House plans, Minimalist home design
Exterior Designs For Small Houses  Joy Studio Design Gallery  Best Design

Step five: Tile floor and walls
Lay your tiles on the floor first after which grout. Then lay your wall tiles making sure that they are level while you lay. Once the bathroom tiles are actually cut and laid, grout all your tiles after which buff the tiles clean.
Step six: Install plumbing fitting and fixtures
Install your plumbing fittings and taps. Also fit all of your towel rails and soap holders. Fit your new bathroom vanity ensuring that it's level and sealed round the top with silicone and also seal around the bathtub. Tip: make sure they come in the right place when you drill into the tiles.
modern house exterior painting home design ideas YouTube
17 Best images about Modern Front Elevations on Pinterest  House plans, Minimalist home design

Step seven: painting, and cleaning - enjoy
Paint your ceiling and perform a final clean making sure it is all totally fitted correctly understanding that there are no leaks inside your plumbing. - Enjoy your new bathroom.

Comments