Bathroom Renovation - A Step by Step Guide

Bathrooms are probably the smallest rooms in the house and they are generally also one the most costly to renovate. Bathroom renovation is often a job that, if done well, can add value to some home plus a great space full of design and lightweight.
84 Best Tiny Houses 2019  Small House Pictures  Plans relaxmeong.info

Bathroom design
Bathroom design is the first area of your bathroom renovation you need to get right. Just replacing the present bathroom sticking with the same design is probably not enough. The key to great bathroom design is to design it while using folks that are likely to apply it at heart. However make sure that your bathroom design also offers a general use factor at the same time.

For example: If you were designing your bathrooms for families you could still design the lavatory with easy access on the shower and bath. This would ensure that the look would recieve treatment for people with limited mobility. This means if you decide to sell your own home or if you are renovating for profit your design includes a wider market appeal. Great bathroom design also uses the area well, looking at the sunlight or window space, size fittings, and drainage options. Draw out a strategy to scale and right down the sizes of the room. Mark the prevailing drainage points and after that and water inlet points. Write down a wish list of the toilet fittings to require and wish using sizes. Now marry the two together and discover what fits. Note: Most bathroom drainage and water inlet points might be moved but this may come at extra cost.
Charming Log Residence in Colorado Unveiling Spectacular ContemporaryStyle Rooms  Freshome.com

Bathroom remodel
If you have chosen to do the task yourself or part of the task it really is time to hire a skip bin and grab the previous bathroom. If your own home was made pre 1980 you may have fibro bathroom wall linings with asbestos within it and great care should be taken. You will need some full body disposable overalls, eye protection, and quality dust mask. Check with the local building authority or council in connection with regulation on bathroom asbestos wall lining removal.
Remove everything except the plumbing. If you keep the toilet plumbing in place you do not ought to turn the water off for the whole house. Also you will have to jack hammer the bottom tiles up as well as the sand and cement bed that they are laid on.
Modern Log Cabin Interior Design Modern Log Cabin Design Log Cabin Kitchen Interiors, modern log

Bathroom Renovation and construction
Bathrooms have to be construction properly from your ground-up to ensure that the finished job is correct and true. This also ensures the look and look of the bathroom can have an excellent finish
The Bathroom Renovation Process

Install water and drainage pipe and electrical wires.

Install wall lining and ceiling and then install the tub hob and bath.

Waterproof a floor and shower and bath recess.

Correct the fall of the floor with sand and cement ready for tiling.

Lay floor and wall tiles then grout.

Install new bathroom vanity, fittings, and taps - install new electrical.
Custom Log Home Plans Wholesale House Plans Custom Log Home Interior Design, custom log home


Paint ceiling and final  one - Plumbing and electrical
At now all new plumbing is installed for clean hot and cold water and drainage. Careful attention should be taken when positioning the new plumbing so that the plumbing fittings are correct once the tiling is fully gone. For example: To centre a fitting in a shower recess you should take into account the thickness of the wall board, tile glue and tile therefore the fitting will probably be centred following your tiles are in place. The same relates to installing drainage pipes for the toilet; the wall lining and tile thickness have to be taken into account so the pipe is in the correct position if the toilet is installed after tiling. Also rough in the any new electrical wires without connecting them to the mains power.
Custom Log Home Plans Wholesale House Plans Custom Log Home Interior Design, custom log home

Step two - Install wall and ceiling linings
Install your 6mm wall lining fostering to nail the fibro board every 150mm without nailing into the new pipes and electrical wires. The best way is to measure and mark the pipe and wire layout on to your new wall board using a pencil when you go. Screw up (or nail) the ceiling lining, plasterboard will be the most common. However if you might be laying your tiles from floor to ceiling don't install the cornice because best done after tiling. If you're not tiling on the ceiling go ahead and install the cornice as soon as the wallboard and ceiling lining happen to be installed. Also if your bath isn't freestanding anyone can from the frame and install the tub. Ensure the bathtub is installed correctly permitting the thickness with the tiles and  sure to check all linings and pipes before you continue with a bath room renovation.

Charming Log Residence in Colorado Unveiling Spectacular ContemporaryStyle Rooms Freshome.com
84 Best Tiny Houses 2019  Small House Pictures  Plans relaxmeong.info

Step three - Waterproof your bathroom
Waterproof your bathroom floor, shower recess, and around the bathtub. When waterproofing a floor be sure that the waterproofing comes 100mm in the walls. The shower recess must be waterproofed 100mm above the shower rose outlet. Also the bath needs to be waterproofed 100mm over the lip with the bath right around and for the floor. At the doorway purchase a 25 x 25mm aluminum angle glued into place with quality silicone and waterproof in to the lip. Your whole bathroom should now the tanked, and so the all water will only decrease a drain. Bathroom waterproofing tip: waterproofing is an easy job but quality and accuracy is most critical.
Step four - Lay inside cement screed for a floor.

Before the bottom tiles can laid the ground should be smooth and fairly flat using a slight fall on the drainage outlet. To do this you must use sand and cement mix which is advisable to give a waterproofing agent into this at the same time. With a level, set a floor level on the doorway. Use the top aluminum angle because the finished floor level and measure on the thickness with the tile plus 10mm for your glue. Mark about the lavatory having a level after which screed within your sand and cement mix using a 1 to 3 degree fall towards the top with the drain outlet. Take your time and get it right with all the finished level as smooth as is possible. When the sand cement mix has set but just isn't dry (you are able to walk into it however you it is somewhat soft) rub it over having a house brick. This will remove all the small highs and lows and check with a level as you go. Let the lavatory floor fully dry and after that you really should have a great surface to tile onto. Tip: the more work you add into the floor screed the simpler your tiling will be.
Modern Log Cabin Interior Design Modern Log Cabin Design Log Cabin Kitchen Interiors, modern log
Charming Log Residence in Colorado Unveiling Spectacular ContemporaryStyle Rooms  Freshome.com

Step five: Tile floor and walls
Lay your tiles on the floor first after which grout. Then lay your wall tiles ensuring they are level because you lay. Once the bathroom tiles have been cut and laid, grout your tiles and then buff the tiles clean.
Step six: Install plumbing fitting and fixtures
Install all of your plumbing fittings and taps. Also fit all of your towel rails and soap holders. Fit your bathroom vanity making sure it is level and sealed throughout the top with silicone as well as seal around the bathtub. Tip: make sure they have been in the right place when you drill to your tiles.
Custom Log Home Plans Wholesale House Plans Custom Log Home Interior Design, custom log home
Modern Log Cabin Interior Design Modern Log Cabin Design Log Cabin Kitchen Interiors, modern log

Step seven: painting, and cleaning - enjoy
Paint your ceiling and perform final clean making sure everything is fitted correctly understanding that there aren't any leaks within your plumbing. - Enjoy your brand-new bathroom.