4 Bedroom House Plans Home Designs Celebration Homes

Single Family Home Designs ARCHITECTURAL DESIGN STUDIO 4 Bedroom House Plans Home Designs Celebration Homes

Bathroom Renovation - A Step by Step Guide

Bathrooms are some of the smallest rooms at home and they're also one the most expensive to renovate. Bathroom renovation is really a job that, if done well, can also add value to your home along with a great space full of design and light.
4 Bedroom House Plans  Home Designs  Celebration Homes

Bathroom design
Bathroom design may be the first area of a bath room renovation you need to get right. Just replacing the existing bathroom with similar design is probably not enough. The key to great bathroom design would be to design it with the people who are likely to use it at heart. However ensure that your bathrooms design also offers an overall use factor at the same time.

For example: If you were designing your bathroom for families you might still design the lavatory with easy access for the shower and bath. This would ensure that the style would also work for those who have limited mobility. This means if you decide to sell your property or if you're renovating for profit your design features a wider market appeal. Great bathroom design also uses the area well, looking at the lighting or window space, sized fittings, and drainage options. Draw out a plan to scale and all the way down the sizes of one's room. Mark the prevailing drainage points and after that and water inlet points. Write down a wish listing of the bathroom fittings to want and wish using sizes. Now marry both together to see what fits. Note: Most bathroom drainage and water inlet points may be moved but this certainly does come at extra expense.
Single Family House Plans Single Family House in USA Outsource Architectural Services, 3D

Bathroom remodel
If you have decided to accomplish the work yourself or part of the task it's time to hire a skip bin and retrieve the existing bathroom. If your home was made pre 1980 maybe you have fibro bathroom wall linings with asbestos in it and great care will need to be taken. You will need some full body disposable overalls, eye protection, and quality dust mask. Check with your neighborhood building authority or council concerning the regulation on bathroom asbestos wall lining removal.
Remove everything except the plumbing. If you keep the lavatory plumbing in position you won't have to turn the river off for the whole house. Also you should jack hammer a floor tiles up along with the sand and cement bed that they are laid on.
Back Country House

Bathroom Renovation and construction
Bathrooms must be construction properly through the start to be sure that the finished job is correct and true. This also ensures the structure and appear of the restroom may have an incredible finish
The Bathroom Renovation Process

Install water and drainage pipe and electrical wires.

Install wall lining and ceiling after which install the tub hob and bath.

Waterproof a floor and shower and bath recess.

Correct nov the bottom with sand and cement ready for tiling.

Lay floor and wall tiles and after that grout.

Install new bathroom vanity, fittings, and taps - install new electrical.
 ARCHITECTURAL DESIGN STUDIO


Paint ceiling and final  one - Plumbing and electrical
At this time all new plumbing is installed for clean cold and warm water and drainage. Careful attention needs to be taken when positioning the newest plumbing in order that the plumbing fittings are correct if the tiling is finished. For example: To centre a fitting in the shower recess you need to consider the thickness from the wall board, tile glue and tile and so the fitting is going to be centred as soon as the tiles are set up. The same relates to installing drainage pipes for a toilet; the wall lining and tile thickness has to be looked at hence the pipe influences correct position when the toilet is installed after tiling. Also rough inside any new electrical wires without connecting them towards the mains power.
58th Street  Residential Architect  Baran Studio Architecture, Oakland, CA, USA, Single Family

Step two - Install wall and ceiling linings
Install your 6mm wall lining fostering to nail the fibro board every 150mm without nailing into the modern pipes and electrical wires. The best way would be to measure and mark the pipe and wire layout on your new wall board having a pencil when you go. Screw up (or nail) the ceiling lining, plasterboard is the most common. However if you might be laying your tiles from floor to ceiling tend not to install the cornice because this is done after tiling. If you're not tiling to the ceiling go ahead and install the cornice as soon as the wallboard and ceiling lining have been installed. Also if your bath isn't freestanding it's simple to form the frame and install the bathtub. Ensure the bathtub is installed correctly enabling the thickness in the tiles and  sure to check on all linings and pipes before you decide to continue with your bathrooms renovation.

Single Family House Plans Single Family House in USA Outsource Architectural Services, 3D
4 Bedroom House Plans  Home Designs  Celebration Homes

Step three - Waterproof a bath room
Waterproof your bathrooms floor, shower recess, and around the tub. When waterproofing the ground make certain that the waterproofing comes 100mm the walls. The shower recess will need to be waterproofed 100mm higher than the shower rose outlet. Also the bath ought to be waterproofed 100mm above the lip from the bath around and on the floor. At the doorway purchase a 25 x 25mm aluminum angle glued into place with quality silicone and waterproof in the lip. Your whole bathroom should now the tanked, therefore the all water will only go lower a drain. Bathroom waterproofing tip: waterproofing is an easy job but quality and accuracy is most significant.
Step four - Lay within the cement screed for the bottom.

Before the bottom tiles can laid the bottom should be smooth and fairly flat which has a slight fall on the drainage outlet. To do this you should use sand and cement mix and it is better to give a waterproofing agent into this too. With a level, set a floor level with the doorway. Use the top aluminum angle because finished floor level and measure on the thickness in the tile plus 10mm to the glue. Mark right around the restroom using a level after which screed within your sand and cement mix using a 1 to 3 degree fall on the top with the drain outlet. Take your time and obtain it right with all the finished level as smooth as you can. When the sand cement mix has set but is not dry (you'll be able to walk on it however, you it is still somewhat soft) rub it over with a house brick. This will remove every one of the small highs and lows and check with a level as you go. Let the bathroom floor fully dry then you really should have an incredible surface to tile onto. Tip: the harder work you set into the floor screed the more your tiling will likely be.
Back Country House
Single Family House Plans Single Family House in USA Outsource Architectural Services, 3D

Step five: Tile floor and walls
Lay your tiles on the bottom first after which grout. Then lay your wall tiles ensuring actually level while you lay. Once the lavatory tiles happen to be cut and laid, grout all your tiles and after that buff the tiles clean.
Step six: Install plumbing fitting and fixtures
Install all of your plumbing fittings and taps. Also fit your towel rails and soap holders. Fit your bathroom vanity making certain it is level and sealed around the top with silicone as well as seal around the bathtub. Tip: make sure they will be in the right place when you drill into your tiles.
ARCHITECTURAL DESIGN STUDIO
Back Country House

Step seven: painting, and cleaning - enjoy
Paint your ceiling and perform a final clean making sure things are all fitted correctly knowning that there isn't any leaks within your plumbing. - Enjoy your brand-new bathroom.

Comments