Bathroom Renovation - A Step by Step Guide

Bathrooms are some of the smallest rooms at home and they are generally also certainly the most expensive for renovate. Bathroom renovation is really a job that, if done well, can also add value to some home as well as a great space full of design and light-weight.
33 Open Bathroom Design For Your Home

Bathroom design
Bathroom design could be the first division of your bathroom renovation you should get right. Just replacing the prevailing bathroom with the exact same design will not be enough. The key to great bathroom design is always to design it using the people that are likely to use it planned. However make sure that your bathroom design boasts an over-all use factor also.

For example: If you were designing a bathroom for families you can still design the restroom with quick access on the shower and bath. This would make certain that the look would also work for those who have limited mobility. This means if you opt to sell your home or if you might be renovating for profit your design carries a wider market appeal. Great bathroom design also uses the area well, considering the sunlight or window space, size of fittings, and drainage options. Draw out an idea to scale and down the sizes of your room. Mark the present drainage points after which and water inlet points. Write down a wish set of the lavatory fittings to wish and want making use of their sizes. Now marry the two together and see what fits. Note: Most bathroom drainage and water inlet points might be moved but this does come at extra expense.
25 Beach Style Open Bathroom Design Ideas

Bathroom remodel
If you have chosen to complete the work yourself or part of the work it is time to hire a skip bin and pull out the previous bathroom. If your property appeared pre 1980 you could have fibro bathroom wall linings with asbestos within it and great care will have to be taken. You will need some full body disposable overalls, eye protection, and quality dust mask. Check with the local building authority or council concerning the regulation on bathroom asbestos wall lining removal.
Remove everything except the plumbing. If you keep the lavatory plumbing in place you will not need to turn the river off for the entire house. Also you will need to jack hammer a floor tiles up along with the sand and cement bed actually laid on.
Bedroom and bathroom 2 in 1 suites – clever combos or risky designs?

Bathroom Renovation and construction
Bathrooms must be construction properly from the start to make sure that the finished job is correct and true. This also ensures the structure and appearance of the lavatory will have an excellent finish
The Bathroom Renovation Process

Install water and drainage pipe and electrical wires.

Install wall lining and ceiling then install the bathtub hob and bath.

Waterproof a floor and shower and bath recess.

Correct december the ground with sand and cement ready for tiling.

Lay floor and wall tiles and then grout.

Install new bathroom vanity, fittings, and taps - install new electrical.
10 best images about open plan bedroom/bathroom ideas on Pinterest  Mauritius, Of late and Bathroom


Paint ceiling and final  one - Plumbing and electrical
At this time brand new plumbing is installed for clean cold and warm water and drainage. Careful attention should be taken when positioning the new plumbing so your plumbing fittings are correct in the event the tiling is completed. For example: To centre a fitting in the shower recess you have to take into account the thickness with the wall board, tile glue and tile and so the fitting will likely be centred following your tiles are in position. The same pertains to installing drainage pipes for any toilet; the wall lining and tile thickness have to be looked at hence the pipe is within the correct position in the event the toilet is installed after tiling. Also rough within the any new electrical wires without connecting them towards the mains power.
Modern apartment interiors bedroom bathroom open plan  Interior Designs  Apartment interior

Step two - Install wall and ceiling linings
Install your 6mm wall lining being careful to nail the fibro board every 150mm without nailing into the newest pipes and electrical wires. The best way is to measure and mark the pipe and wire layout on to your new wall board which has a pencil because you go. Screw up (or nail) the ceiling lining, plasterboard may be the most common. However if you're laying your tiles from floor to ceiling don't install the cornice because this is best done after tiling. If you're not tiling towards the ceiling go ahead and install the cornice as soon as the wallboard and ceiling lining happen to be installed. Also if your bath is just not freestanding now you can form the frame and install the tub. Ensure the bath is installed correctly permitting the thickness in the tiles and  sure to test all linings and pipes when you continue with your bathrooms renovation.

25 Beach Style Open Bathroom Design Ideas
33 Open Bathroom Design For Your Home

Step three - Waterproof your bathrooms
Waterproof your bathrooms floor, shower recess, and around the tub. When waterproofing the ground make sure that the waterproofing comes 100mm inside the walls. The shower recess should be waterproofed 100mm over the shower rose outlet. Also the bath needs to be waterproofed 100mm above the lip with the bath right around and towards the floor. At the doorway put in a 25 x 25mm aluminum angle glued into place with quality silicone and waterproof into the lip. Your whole bathroom should now the tanked, hence the all water will simply drop a drain. Bathroom waterproofing tip: waterproofing is a straightforward job but quality and accuracy is most significant.
Step four - Lay inside the cement screed for a floor.

Before a floor tiles can laid the floor should be smooth and fairly flat having a slight fall towards the drainage outlet. To do this you should use sand and cement mix which is best to give a waterproofing agent into this at the same time. With a level, set the bottom level at the doorway. Use the top aluminum angle since the finished floor level and measure down the thickness of the tile plus 10mm to the glue. Mark about the restroom using a level and after that screed inside your sand and cement mix using a 1 to 3 degree fall to the top from the drain outlet. Take your time and acquire it right with the finished level as smooth as possible. When the sand cement mix has set but is just not dry (you are able to walk into it nevertheless, you it is still a lttle bit soft) rub it over using a house brick. This will remove every one of the small highs and lows and look having a level while you go. Let the bathroom floor fully dry and then you really should have an incredible surface to tile onto. Tip: greater work you add into the floor screed the easier your tiling will likely be.
Bedroom and bathroom 2 in 1 suites – clever combos or risky designs?
25 Beach Style Open Bathroom Design Ideas

Step five: Tile floor and walls
Lay your tiles on a floor first and then grout. Then lay your wall tiles ensuring actually level as you lay. Once the toilet tiles are already cut and laid, grout your entire tiles then buff the tiles clean.
Step six: Install plumbing fitting and fixtures
Install all your plumbing fittings and taps. Also fit your towel rails and soap holders. Fit your brand-new bathroom vanity ensuring it's level and sealed round the top with silicone and also seal around the bath. Tip: make sure they will be in the right place when you drill in your tiles.
10 best images about open plan bedroom/bathroom ideas on Pinterest Mauritius, Of late and Bathroom
Bedroom and bathroom 2 in 1 suites – clever combos or risky designs?

Step seven: painting, and cleaning - enjoy
Paint your ceiling and execute a final clean ensuring things are fitted correctly knowning that there won't be any leaks with your plumbing. - Enjoy your bathroom.