30 Best Modern Kitchen Design Ideas YouTube

Kitchens Styles And Designs 50 Best Kitchen Styles Dream Kitchen Ideas 30 Best Modern Kitchen Design Ideas YouTube

Bathroom Renovation - A Step by Step Guide

Bathrooms are one of the smallest rooms at home plus they are also certainly the most expensive for renovate. Bathroom renovation is often a job that, if done well, can add value to a home along with a great space brimming with design and light-weight.
30 Best Modern Kitchen Design Ideas  YouTube

Bathroom design
Bathroom design will be the first area of a bath room renovation you ought to get right. Just replacing the present bathroom with the same design may not be enough. The key to great bathroom design is always to design it with all the individuals who are likely to apply it in mind. However make certain that your bathroom design also has a general use factor also.

For example: If you were designing your bathroom for families you could still design the lavatory with easy accessibility on the shower and bath. This would be sure that the style would also work if you have limited mobility. This means if you sell your own home or if you might be renovating for profit your design has a wider market appeal. Great bathroom design also uses space well, taking into consideration the light or window space, size fittings, and drainage options. Draw out a strategy to scale and down the sizes of one's room. Mark the present drainage points after which and water inlet points. Write down a wish listing of the restroom fittings to require and desire making use of their sizes. Now marry both the together and see what fits. Note: Most bathroom drainage and water inlet points could be moved but this does come at extra expense.
50 Best Kitchen Styles  Dream Kitchen Ideas

Bathroom remodel
If you decide to do the work yourself or part of the task it really is time to employ a skip bin and grab the existing bathroom. If your house was made pre 1980 maybe you have fibro bathroom wall linings with asbestos in it and great care will need to be taken. You will need some full body disposable overalls, eye protection, and quality dust mask. Check with your neighborhood building authority or council regarding the regulation on bathroom asbestos wall lining removal.
Remove everything except the plumbing. If you keep the restroom plumbing in place you won't need to turn water off for the whole house. Also you will likely need to jack hammer a floor tiles up as well as the sand and cement bed that they're laid on.
50 Best Kitchen Styles  Dream Kitchen Ideas

Bathroom Renovation and construction
Bathrooms has to be construction properly in the start to make sure that the finished job is correct and true. This also ensures the style and look of the restroom may have an excellent finish
The Bathroom Renovation Process

Install water and drainage pipe and electrical wires.

Install wall lining and ceiling and after that install the bath hob and bath.

Waterproof a floor and shower and bath recess.

Correct nov the ground with sand and cement ready for tiling.

Lay floor and wall tiles then grout.

Install new bathroom vanity, fittings, and taps - install new electrical.
Best 25+ Hamptons Kitchen ideas on Pinterest  Hampton style, American kitchen and White kitchen


Paint ceiling and final  one - Plumbing and electrical
At this point many new plumbing is installed for clean cold and hot water and drainage. Careful attention has to be taken when positioning the newest plumbing so your plumbing fittings are correct when the tiling ends. For example: To centre a fitting in the shower recess you need to take into consideration the thickness with the wall board, tile glue and tile therefore the fitting is going to be centred following your tiles are available. The same pertains to installing drainage pipes for the toilet; the wall lining and tile thickness has to be considered and so the pipe influences correct position once the toilet is installed after tiling. Also rough in the any new electrical wires without connecting them to the mains power.
5 Most Popular Cabinet Styles for Your Dream Kitchen  Design Swan

Step two - Install wall and ceiling linings
Install your 6mm wall lining the constant maintenance to nail the fibro board every 150mm without nailing into the newest pipes and electrical wires. The best way is to measure and mark the pipe and wire layout onto your new wall board with a pencil when you go. Screw up (or nail) the ceiling lining, plasterboard could be the most common. However if you happen to be laying your tiles from floor to ceiling don't install the cornice as this is best done after tiling. If you are not tiling towards the ceiling just install the cornice following your wallboard and ceiling lining happen to be installed. Also if your bath is just not freestanding you can now form the frame and install the tub. Ensure the bath is installed correctly allowing for the thickness in the tiles and  sure to check all linings and pipes before you continue with your bathroom renovation.

50 Best Kitchen Styles Dream Kitchen Ideas
30 Best Modern Kitchen Design Ideas  YouTube

Step three - Waterproof your bathroom
Waterproof your bathrooms floor, shower recess, and around the tub. When waterproofing the bottom ensure that the waterproofing comes 100mm the walls. The shower recess should be waterproofed 100mm above the shower rose outlet. Also the bath should be waterproofed 100mm over the lip with the bath around and to the floor. At the doorway put in a 25 x 25mm aluminum angle glued into place with quality silicone and waterproof in the lip. Your whole bathroom should now the tanked, and so the all water is only going to decrease a drain. Bathroom waterproofing tip: waterproofing is a straightforward job but quality and accuracy is most important.
Step four - Lay inside cement screed for the bottom.

Before the ground tiles can laid the bottom must be smooth and fairly flat having a slight fall to the drainage outlet. To do this you should use sand and cement mix and it's also best to give a waterproofing agent into this also. With a level, set the ground level on the doorway. Use the top aluminum angle since the finished floor level and measure on the thickness with the tile plus 10mm to the glue. Mark around the bathroom using a level and after that screed inside your sand and cement mix with a 1 to 3 degree fall on the top in the drain outlet. Take your time and obtain it right with all the finished level as smooth as you possibly can. When the sand cement mix has set but is just not dry (you can walk about it however, you it's still a bit soft) rub it over with a house brick. This will remove each of the small highs and lows and check with a level as you go. Let the lavatory floor fully dry after which you needs to have a great surface to tile onto. Tip: the more work you set into a floor screed the more your tiling will likely be.
50 Best Kitchen Styles Dream Kitchen Ideas
50 Best Kitchen Styles  Dream Kitchen Ideas

Step five: Tile floor and walls
Lay your tiles on the floor first after which grout. Then lay your wall tiles making sure that they are level because you lay. Once the restroom tiles happen to be cut and laid, grout your entire tiles and after that buff the tiles clean.
Step six: Install plumbing fitting and fixtures
Install your entire plumbing fittings and taps. Also fit your entire towel rails and soap holders. Fit a new bathroom vanity making certain it really is level and sealed throughout the top with silicone and also seal around the bathtub. Tip: make sure they come in the right place prior to deciding to drill into your tiles.
Best 25+ Hamptons Kitchen ideas on Pinterest Hampton style, American kitchen and White kitchen
50 Best Kitchen Styles  Dream Kitchen Ideas

Step seven: painting, and cleaning - enjoy
Paint your ceiling and perform final clean making sure things are all fitted correctly knowning that there aren't any leaks in your plumbing. - Enjoy your brand-new bathroom.

Comments