3 Bedroom House Plans Home Designs Celebration Homes

3 Bedroom Home Design Plans Plan For A House Of 3 Bedroom Homes Floor Plans 3 Bedroom House Plans Home Designs Celebration Homes

Bathroom Renovation - A Step by Step Guide

Bathrooms are one of the smallest rooms in the house and they are generally also one the most expensive for renovate. Bathroom renovation is a job that, if done well, may add value with a home along with a great space brimming with design and light-weight.
3 Bedroom House Plans  Home Designs  Celebration Homes

Bathroom design
Bathroom design is the first part of your bathrooms renovation you need to get right. Just replacing the existing bathroom with the same design is probably not enough. The key to great bathroom design would be to design it with all the individuals who will certainly use it at heart. However be sure that your bathroom design also offers an over-all use factor at the same time.

For example: If you were designing a bath room for families you may still design the toilet with easy access to the shower and bath. This would be sure that the structure would work for those who have limited mobility. This means if you choose to sell your house or if you're renovating for profit your design features a wider market appeal. Great bathroom design also uses the space well, taking into consideration the lighting or window space, sized fittings, and drainage options. Draw out a plan to scale and right down the sizes of your respective room. Mark the prevailing drainage points after which and water inlet points. Write down a wish list of the toilet fittings to require and desire making use of their sizes. Now marry the two together and discover what fits. Note: Most bathroom drainage and water inlet points might be moved but this may come at expense.
Two Story House Plans Series: PHP2014004

Bathroom remodel
If you've decided to complete the task yourself or part of the project it is time to hire a skip bin and pull out the existing bathroom. If your house was made pre 1980 maybe you have fibro bathroom wall linings with asbestos inside and great care must be taken. You will need some full body disposable overalls, eye protection, and quality dust mask. Check with your local building authority or council concerning the regulation on bathroom asbestos wall lining removal.
Remove everything except the plumbing. If you keep the toilet plumbing available you do not have to turn water off for the entire house. Also you will need to jack hammer a floor tiles up and the sand and cement bed that they are laid on.
50 Three “3” Bedroom Apartment/House Plans  Architecture  Design

Bathroom Renovation and construction
Bathrooms should be construction properly in the start to be sure that the finished job is correct and true. This also ensures the design and look of the toilet may have a fantastic finish
The Bathroom Renovation Process

Install water and drainage pipe and electrical wires.

Install wall lining and ceiling then install the bathtub hob and bath.

Waterproof the bottom and shower and bath recess.

Correct the fall of the floor with sand and cement ready for tiling.

Lay floor and wall tiles after which grout.

Install new bathroom vanity, fittings, and taps - install new electrical.
รวม 25 แบบแปลน 3 มิติ สำหรับบ้านขนาด 3 ห้องนอน – NaiBann – ข้อมูลซื้อขายบ้าน บ้านเดี่ยว คอนโด


Paint ceiling and final  one - Plumbing and electrical
At this time new plumbing is installed for clean cold and warm water and drainage. Careful attention should be taken when positioning the modern plumbing so that the plumbing fittings are correct if the tiling is fully gone. For example: To centre a fitting inside a shower recess you should take into account the thickness in the wall board, tile glue and tile hence the fitting will be centred after the tiles are available. The same refers to installing drainage pipes for a toilet; the wall lining and tile thickness should be looked at so the pipe is within the correct position in the event the toilet is installed after tiling. Also rough inside any new electrical wires without connecting them towards the mains power.
3 Bedroom 2 Bathroom  Affordable Housing  New Homes  DCM Housing

Step two - Install wall and ceiling linings
Install your 6mm wall lining being careful to nail the fibro board every 150mm without nailing into the newest pipes and electrical wires. The best way is always to measure and mark the pipe and wire layout on to your new wall board using a pencil while you go. Screw up (or nail) the ceiling lining, plasterboard is the most common. However if you are laying your tiles from floor to ceiling usually do not install the cornice as this is done after tiling. If you're not tiling for the ceiling proceed to install the cornice as soon as the wallboard and ceiling lining have been installed. Also if your bath just isn't freestanding now you can from the frame and install the bath. Ensure the bath is installed correctly making it possible for the thickness from the tiles and  sure to evaluate all linings and pipes when you continue with a bath room renovation.

Two Story House Plans Series: PHP2014004
3 Bedroom House Plans  Home Designs  Celebration Homes

Step three - Waterproof your bathroom
Waterproof your bathrooms floor, shower recess, and around the bathtub. When waterproofing a floor be sure that the waterproofing comes 100mm in the walls. The shower recess will have to be waterproofed 100mm above the shower rose outlet. Also the tub must be waterproofed 100mm over the lip from the bath about and for the floor. At the doorway install a 25 x 25mm aluminum angle glued into place with quality silicone and waterproof in the lip. Your whole bathroom should now the tanked, so the all water will still only go lower a drain. Bathroom waterproofing tip: waterproofing is a simple job but quality and accuracy is most important.
Step four - Lay inside cement screed for the bottom.

Before the floor tiles can laid the ground must be smooth and fairly flat using a slight fall on the drainage outlet. To do this you must use sand and cement mix and it is best to include a waterproofing agent into this too. With a level, set the ground level with the doorway. Use the top aluminum angle since the finished floor level and measure on the thickness with the tile plus 10mm to the glue. Mark right around the restroom which has a level then screed inside your sand and cement mix which has a 1 to 3 degree fall for the top in the drain outlet. Take your time and acquire it right with the finished level as smooth as is possible. When the sand cement mix has set but is not dry (it is possible to walk into it nevertheless, you it's still somewhat soft) rub it over using a house brick. This will remove all the small highs and lows and check having a level because you go. Let the lavatory floor fully dry then you needs to have an incredible surface to tile onto. Tip: the more work you add into a floor screed the simpler your tiling is going to be.
50 Three “3” Bedroom Apartment/House Plans Architecture Design
Two Story House Plans Series: PHP2014004

Step five: Tile floor and walls
Lay your tiles on a floor first and then grout. Then lay your wall tiles making sure they are level while you lay. Once the toilet tiles are already cut and laid, grout your tiles and then buff the tiles clean.
Step six: Install plumbing fitting and fixtures
Install all your plumbing fittings and taps. Also fit your entire towel rails and soap holders. Fit a new bathroom vanity ensuring that it's level and sealed across the top with silicone plus seal around the bathtub. Tip: make sure they have been in the right place when you drill into the tiles.
รวม 25 แบบแปลน 3 มิติ สำหรับบ้านขนาด 3 ห้องนอน – NaiBann – ข้อมูลซื้อขายบ้าน บ้านเดี่ยว คอนโด
50 Three “3” Bedroom Apartment/House Plans  Architecture  Design

Step seven: painting, and cleaning - enjoy
Paint your ceiling and execute a final clean ensuring that things are fitted correctly knowning that there aren't any leaks with your plumbing. - Enjoy your bathroom.

Comments