3 Bedroom Floor Plan: C9911 Hawks Homes Manufactured Modular Conway Little Rock Arkansas

3 Bedroom Home Design Plans Floor Plan 3 Bedroom Floor Plan: C9911 Hawks Homes Manufactured Modular Conway Little Rock Arkansas

Bathroom Renovation - A Step by Step Guide

Bathrooms are probably the smallest rooms at home and they are also one the most costly to renovate. Bathroom renovation is a job that, if done well, can also add value with a home plus a great space packed with design and lightweight.
3 Bedroom Floor Plan: C9911  Hawks Homes  Manufactured  Modular  Conway  Little Rock Arkansas

Bathroom design
Bathroom design will be the first division of your bathroom renovation you need to get right. Just replacing the prevailing bathroom with similar design may not be enough. The key to great bathroom design would be to design it while using folks that will utilize it at heart. However make sure that your bathroom design also has a general use factor as well.

For example: If you were designing a bath room for families you may still design the bathroom with comfortable access to the shower and bath. This would ensure that the look would also work if you have limited mobility. This means if you opt to sell your own home or if you might be renovating for profit your design carries a wider market appeal. Great bathroom design also uses space well, taking into consideration the sunshine or window space, sized fittings, and drainage options. Draw out a strategy to scale and all the way down the sizes of your respective room. Mark the existing drainage points after which and water inlet points. Write down a wish report on the restroom fittings to require and wish using their sizes. Now marry the 2 together to see what fits. Note: Most bathroom drainage and water inlet points may be moved but this may come at extra expense.
Mobile Home Floor Plans 1200 Sq FT 3Bedroom Mobile Home Floor Plan, 1200 sq ft floor plans

Bathroom remodel
If you decide to complete the task yourself or part of the work it can be time to employ a skip bin and grab the previous bathroom. If your home appeared pre 1980 you might have fibro bathroom wall linings with asbestos inside and great care must be taken. You will need some full body disposable overalls, eye protection, and quality dust mask. Check with your local building authority or council regarding the regulation on bathroom asbestos wall lining removal.
Remove everything except the plumbing. If you keep the toilet plumbing available you won't ought to turn the water off for the complete house. Also you should jack hammer the ground tiles up and also the sand and cement bed actually laid on.
2 Bedroom House with Garage Small 3 Bedroom House Floor Plans, very simple small house plans

Bathroom Renovation and construction
Bathrooms has to be construction properly from your ground-up to ensure that the finished job is correct and true. This also ensures the design and look of the toilet will have an excellent finish
The Bathroom Renovation Process

Install water and drainage pipe and electrical wires.

Install wall lining and ceiling and then install the bathtub hob and bath.

Waterproof the bottom and shower and bath recess.

Correct the fall of the bottom with sand and cement ready for tiling.

Lay floor and wall tiles then grout.

Install new bathroom vanity, fittings, and taps - install new electrical.
South Florida Designs Contemporary 1 Floor 4 Bedroom Home DesignSouth Florida Design


Paint ceiling and final  one - Plumbing and electrical
At now brand new plumbing is installed for clean cold and warm water and drainage. Careful attention has to be taken when positioning the newest plumbing so your plumbing fittings are correct if the tiling is completed. For example: To centre a fitting in a shower recess you must think about the thickness of the wall board, tile glue and tile therefore the fitting will be centred after the tiles are in position. The same relates to installing drainage pipes for any toilet; the wall lining and tile thickness should be looked at hence the pipe is in the correct position in the event the toilet is installed after tiling. Also rough in the any new electrical wires without connecting them for the mains power.
Floor Plans Ranch Homes Bedrooms Quotes  House Plans  85847

Step two - Install wall and ceiling linings
Install your 6mm wall lining being careful to nail the fibro board every 150mm without nailing into the brand new pipes and electrical wires. The best way would be to measure and mark the pipe and wire layout on your new wall board using a pencil because you go. Screw up (or nail) the ceiling lining, plasterboard may be the most common. However if you're laying your tiles from floor to ceiling do not install the cornice because this is most effectively achieved after tiling. If you're not tiling to the ceiling go ahead and install the cornice following your wallboard and ceiling lining are actually installed. Also if your bath just isn't freestanding you can now form the frame and install the bathtub. Ensure the bathtub is installed correctly permitting the thickness in the tiles and  sure to check on all linings and pipes when you continue with your bathrooms renovation.

Mobile Home Floor Plans 1200 Sq FT 3Bedroom Mobile Home Floor Plan, 1200 sq ft floor plans
3 Bedroom Floor Plan: C9911  Hawks Homes  Manufactured  Modular  Conway  Little Rock Arkansas

Step three - Waterproof your bathroom
Waterproof a bath room floor, shower recess, and around the bath. When waterproofing a floor ensure that the waterproofing comes 100mm in the walls. The shower recess will need to be waterproofed 100mm above the shower rose outlet. Also the bath ought to be waterproofed 100mm across the lip from the bath about and on the floor. At the doorway install a 25 x 25mm aluminum angle glued into place with quality silicone and waterproof in to the lip. Your whole bathroom should now the tanked, therefore the all water is only going to go down a drain. Bathroom waterproofing tip: waterproofing is a simple job but quality and accuracy is most important.
Step four - Lay inside cement screed for the bottom.

Before the ground tiles can laid the floor should be smooth and fairly flat having a slight fall to the drainage outlet. To do this you must use sand and cement mix which is far better to put in a waterproofing agent into this too. With a level, set the bottom level with the doorway. Use the top aluminum angle since the finished floor level and measure around the thickness with the tile plus 10mm to the glue. Mark about the bathroom which has a level and then screed in your sand and cement mix using a 1 to 3 degree fall to the top in the drain outlet. Take your time and get it right while using finished level as smooth as possible. When the sand cement mix has set but isn't dry (you are able to walk into it however, you will still be a bit soft) rub it over which has a house brick. This will remove every one of the small highs and lows and check which has a level while you go. Let the restroom floor fully dry and after that you really should have a fantastic surface to tile onto. Tip: greater work you set into the ground screed the simpler your tiling will likely be.
2 Bedroom House with Garage Small 3 Bedroom House Floor Plans, very simple small house plans
Mobile Home Floor Plans 1200 Sq FT 3Bedroom Mobile Home Floor Plan, 1200 sq ft floor plans

Step five: Tile floor and walls
Lay your tiles on the ground first then grout. Then lay your wall tiles ensuring that they're level because you lay. Once the bathroom tiles happen to be cut and laid, grout all your tiles and then buff the tiles clean.
Step six: Install plumbing fitting and fixtures
Install all of your plumbing fittings and taps. Also fit your towel rails and soap holders. Fit your brand-new bathroom vanity ensuring that it's level and sealed across the top with silicone and also seal around the bath. Tip: make sure they come in the right place prior to deciding to drill in your tiles.
South Florida Designs Contemporary 1 Floor 4 Bedroom Home DesignSouth Florida Design
2 Bedroom House with Garage Small 3 Bedroom House Floor Plans, very simple small house plans

Step seven: painting, and cleaning - enjoy
Paint your ceiling and execute a final clean ensuring that things are all fitted correctly understanding that there isn't any leaks inside your plumbing. - Enjoy a new bathroom.

Comments