25 More 3 Bedroom 3D Floor Plans Architecture Design

3 Bedroom Home Design Plans 25 More 3 Bedroom 3D Floor Plans 25 More 3 Bedroom 3D Floor Plans Architecture Design

Bathroom Renovation - A Step by Step Guide

Bathrooms are probably the smallest rooms in the house and they're also certainly the most expensive to renovate. Bathroom renovation is often a job that, if done well, can also add value to your home plus a great space filled with design and light.
25 More 3 Bedroom 3D Floor Plans  Architecture  Design

Bathroom design
Bathroom design may be the first division of your bathrooms renovation you ought to get right. Just replacing the current bathroom sticking with the same design will not be enough. The key to great bathroom design is to design it with the people that will apply it in mind. However make certain that your bathroom design even offers a broad use factor also.

For example: If you were designing your bathrooms for families you might still design the restroom with comfortable access for the shower and bath. This would be sure that the design would also work if you have limited mobility. This means if you opt to sell your home or if you might be renovating for profit your design carries a wider market appeal. Great bathroom design also uses the area well, considering the lighting or window space, size fittings, and drainage options. Draw out an idea to scale and right down the sizes of one's room. Mark the existing drainage points after which and water inlet points. Write down a wish listing of the toilet fittings to wish and want making use of their sizes. Now marry the two together and find out what fits. Note: Most bathroom drainage and water inlet points could be moved but this will come at extra cost.
25 More 3 Bedroom 3D Floor Plans

Bathroom remodel
If you have decided to do the project yourself or part of the work it can be time to work with a skip bin and take out the old bathroom. If your house was made pre 1980 maybe you have fibro bathroom wall linings with asbestos inside and great care will have to be taken. You will need some full body disposable overalls, eye protection, and quality dust mask. Check with any local building authority or council about the regulation on bathroom asbestos wall lining removal.
Remove everything except the plumbing. If you keep the restroom plumbing in place you will not ought to turn the lake off for your house. Also you should jack hammer the bottom tiles up and also the sand and cement bed that they're laid on.
25 More 3 Bedroom 3D Floor Plans

Bathroom Renovation and construction
Bathrooms should be construction properly through the ground up to be sure that the finished job is correct and true. This also ensures the style and search of the restroom will have an incredible finish
The Bathroom Renovation Process

Install water and drainage pipe and electrical wires.

Install wall lining and ceiling and after that install the bathtub hob and bath.

Waterproof a floor and shower and bath recess.

Correct nov a floor with sand and cement ready for tiling.

Lay floor and wall tiles then grout.

Install new bathroom vanity, fittings, and taps - install new electrical.
25 More 3 Bedroom 3D Floor Plans


Paint ceiling and final  one - Plumbing and electrical
At this time many new plumbing is installed for clean cold and warm water and drainage. Careful attention should be taken when positioning the modern plumbing so your plumbing fittings are correct once the tiling is fully gone. For example: To centre a fitting in a very shower recess you must take into account the thickness in the wall board, tile glue and tile therefore the fitting will be centred following the tiles are in place. The same applies to installing drainage pipes for a toilet; the wall lining and tile thickness must be taken into consideration so the pipe influences correct position in the event the toilet is installed after tiling. Also rough in the any new electrical wires without connecting them for the mains power.
Middleton Stoney, Nr Bicester  OX25  Ref: 30242  Bicester

Step two - Install wall and ceiling linings
Install your 6mm wall lining being careful to nail the fibro board every 150mm without nailing into the new pipes and electrical wires. The best way would be to measure and mark the pipe and wire layout onto your new wall board which has a pencil while you go. Screw up (or nail) the ceiling lining, plasterboard may be the most common. However if you happen to be laying your tiles from floor to ceiling usually do not install the cornice because this is best done after tiling. If you're not tiling for the ceiling go on and install the cornice following your wallboard and ceiling lining have been installed. Also if your bath is not freestanding it's simple to from the frame and install the bathtub. Ensure the bath is installed correctly allowing for the thickness from the tiles and  sure to check on all linings and pipes before you decide to continue with your bathrooms renovation.

25 More 3 Bedroom 3D Floor Plans
25 More 3 Bedroom 3D Floor Plans  Architecture  Design

Step three - Waterproof your bathroom
Waterproof your bathrooms floor, shower recess, and around the bathtub. When waterproofing the bottom ensure that the waterproofing comes 100mm up the walls. The shower recess must be waterproofed 100mm across the shower rose outlet. Also the bath should be waterproofed 100mm across the lip from the bath around and to the floor. At the doorway put in a 25 x 25mm aluminum angle glued into place with quality silicone and waterproof in to the lip. Your whole bathroom should now the tanked, therefore the all water is only going to decrease a drain. Bathroom waterproofing tip: waterproofing is an easy job but quality and accuracy is most crucial.
Step four - Lay in the cement screed for the bottom.

Before a floor tiles can laid a floor have to be smooth and fairly flat with a slight fall on the drainage outlet. To do this you should use sand and cement mix in fact it is best to include a waterproofing agent into this at the same time. With a level, set a floor level at the doorway. Use the top aluminum angle as the finished floor level and measure along the thickness with the tile plus 10mm for the glue. Mark right around the lavatory having a level and then screed in your sand and cement mix which has a 1 to 3 degree fall for the top from the drain outlet. Take your time and have it right using the finished level as smooth as you possibly can. When the sand cement mix has set but isn't dry (you'll be able to walk into it but you it is somewhat soft) rub it over with a house brick. This will remove all the small highs and lows and appearance which has a level while you go. Let the toilet floor fully dry after which you must have an incredible surface to tile onto. Tip: the harder work you set into a floor screed the simpler your tiling will probably be.
25 More 3 Bedroom 3D Floor Plans
25 More 3 Bedroom 3D Floor Plans

Step five: Tile floor and walls
Lay your tiles on the bottom first then grout. Then lay your wall tiles ensuring that actually level because you lay. Once the bathroom tiles have been cut and laid, grout all of your tiles then buff the tiles clean.
Step six: Install plumbing fitting and fixtures
Install all your plumbing fittings and taps. Also fit all of your towel rails and soap holders. Fit your new bathroom vanity ensuring it can be level and sealed round the top with silicone plus seal around the bath. Tip: make sure they will be in the right place prior to deciding to drill into the tiles.
25 More 3 Bedroom 3D Floor Plans
25 More 3 Bedroom 3D Floor Plans

Step seven: painting, and cleaning - enjoy
Paint your ceiling and execute a final clean ensuring things are all fitted correctly knowning that there aren't any leaks with your plumbing. - Enjoy your brand-new bathroom.

Comments