Bathroom Renovation - A Step by Step Guide

Bathrooms are one of the smallest rooms at home and they are also the most expensive for renovate. Bathroom renovation is often a job that, if done well, can add value to your home and a great space filled with design and light-weight.
25+ Master Bedroom Decorating Ideas , Designs  Design Trends  Premium PSD, Vector Downloads

Bathroom design
Bathroom design will be the first section of a bath room renovation you need right. Just replacing the current bathroom with the exact same design might not be enough. The key to great bathroom design would be to design it using the people that will certainly apply it at heart. However ensure that your bathroom design also offers an overall use factor as well.

For example: If you were designing your bathroom for families you can still design the restroom with easy accessibility on the shower and bath. This would ensure that the style would work for people with limited mobility. This means if you choose to sell your home or if you happen to be renovating for profit your design carries a wider market appeal. Great bathroom design also uses the area well, considering the sunlight or window space, size fittings, and drainage options. Draw out a plan to scale and all the way down the sizes of your room. Mark the prevailing drainage points and after that and water inlet points. Write down a wish listing of the lavatory fittings to want and wish making use of their sizes. Now marry the two together and discover what fits. Note: Most bathroom drainage and water inlet points can be moved but this certainly does come at extra expense.
Synergistic Modern Spaces by Steve Leung

Bathroom remodel
If you decide to perform the work yourself or part of the job it really is time to work with a skip bin and grab the existing bathroom. If your home was developed pre 1980 you could have fibro bathroom wall linings with asbestos inside and great care will have to be taken. You will need some full body disposable overalls, eye protection, and quality dust mask. Check with your local building authority or council about the regulation on bathroom asbestos wall lining removal.
Remove everything except the plumbing. If you keep the lavatory plumbing in position you do not have to turn the water off for the whole house. Also you will have to jack hammer a floor tiles up along with the sand and cement bed actually laid on.
Best 20+ Bed against window ideas on Pinterest  Window behind bed, Traditional bed rails and

Bathroom Renovation and construction
Bathrooms have to be construction properly from the start to ensure that the finished job is correct and true. This also ensures the structure and search of the restroom can have a great finish
The Bathroom Renovation Process

Install water and drainage pipe and electrical wires.

Install wall lining and ceiling and after that install the tub hob and bath.

Waterproof the ground and shower and bath recess.

Correct december the floor with sand and cement ready for tiling.

Lay floor and wall tiles then grout.

Install new bathroom vanity, fittings, and taps - install new electrical.
Ultra Modern Master Suite


Paint ceiling and final  one - Plumbing and electrical
At this point all new plumbing is installed for clean cold and warm water and drainage. Careful attention needs to be taken when positioning the modern plumbing so the plumbing fittings are correct in the event the tiling ends. For example: To centre a fitting in a very shower recess you have to think about the thickness from the wall board, tile glue and tile and so the fitting is going to be centred following your tiles are in position. The same relates to installing drainage pipes for the toilet; the wall lining and tile thickness have to be looked at hence the pipe is in the correct position when the toilet is installed after tiling. Also rough inside the any new electrical wires without connecting them towards the mains power.
Synergistic Modern Spaces by Steve Leung

Step two - Install wall and ceiling linings
Install your 6mm wall lining the constant maintenance to nail the fibro board every 150mm without nailing into the new pipes and electrical wires. The best way is usually to measure and mark the pipe and wire layout onto your new wall board with a pencil as you go. Screw up (or nail) the ceiling lining, plasterboard may be the most common. However if you happen to be laying your tiles from floor to ceiling do not install the cornice as this is best done after tiling. If you are not tiling towards the ceiling go ahead and install the cornice after the wallboard and ceiling lining have been installed. Also if your bath isn't freestanding now you can make up the frame and install the bath. Ensure the bathtub is installed correctly permitting the thickness in the tiles and  sure to check all linings and pipes when you continue with your bathroom renovation.

Synergistic Modern Spaces by Steve Leung
25+ Master Bedroom Decorating Ideas , Designs  Design Trends  Premium PSD, Vector Downloads

Step three - Waterproof a bath room
Waterproof a bath room floor, shower recess, and around the bath. When waterproofing the floor ensure that the waterproofing comes 100mm inside the walls. The shower recess will need to be waterproofed 100mm over the shower rose outlet. Also the tub must be waterproofed 100mm above the lip with the bath around and on the floor. At the doorway install a 25 x 25mm aluminum angle glued into place with quality silicone and waterproof in to the lip. Your whole bathroom should now the tanked, therefore the all water will simply decrease a drain. Bathroom waterproofing tip: waterproofing is an easy job but quality and accuracy is most crucial.
Step four - Lay within the cement screed for the floor.

Before the bottom tiles can laid the bottom have to be smooth and fairly flat having a slight fall towards the drainage outlet. To do this you must use sand and cement mix in fact it is advisable to include a waterproofing agent into this as well. With a level, set the bottom level on the doorway. Use the top aluminum angle since the finished floor level and measure on the thickness of the tile plus 10mm for your glue. Mark right around the restroom having a level then screed with your sand and cement mix having a 1 to 3 degree fall towards the top with the drain outlet. Take your time and acquire it right using the finished level as smooth as you possibly can. When the sand cement mix has set but just isn't dry (you can walk onto it nevertheless, you it is a lttle bit soft) rub it over using a house brick. This will remove all the small highs and lows and check having a level because you go. Let the bathroom floor fully dry then you really should have an excellent surface to tile onto. Tip: the greater work you add into the ground screed the easier your tiling will be.
Best 20+ Bed against window ideas on Pinterest Window behind bed, Traditional bed rails and
Synergistic Modern Spaces by Steve Leung

Step five: Tile floor and walls
Lay your tiles on the floor first and then grout. Then lay your wall tiles ensuring that that they are level when you lay. Once the toilet tiles happen to be cut and laid, grout your entire tiles and then buff the tiles clean.
Step six: Install plumbing fitting and fixtures
Install all of your plumbing fittings and taps. Also fit your entire towel rails and soap holders. Fit your bathroom vanity ensuring that it's level and sealed across the top with silicone and in addition seal around the tub. Tip: make sure they are in the right place before you drill to your tiles.
Ultra Modern Master Suite
Best 20+ Bed against window ideas on Pinterest  Window behind bed, Traditional bed rails and

Step seven: painting, and cleaning - enjoy
Paint your ceiling and perform final clean ensuring things are fitted correctly and that there isn't any leaks with your plumbing. - Enjoy your bathroom.