25+ Contemporary Home Bar Design Ideas EverCoolHomes

Design Basement Kitchen Design Designing A Basement Bar Basement Home Wet Bar Ideas For Basement 25+ Contemporary Home Bar Design Ideas EverCoolHomes

Bathroom Renovation - A Step by Step Guide

Bathrooms are probably the smallest rooms in the home and they are generally also certainly the most expensive to renovate. Bathroom renovation is a job that, if done well, can also add value with a home plus a great space packed with design and light.
25+ Contemporary Home Bar Design Ideas  EverCoolHomes

Bathroom design
Bathroom design could be the first division of a bath room renovation you ought to get right. Just replacing the present bathroom with similar design might not be enough. The key to great bathroom design is to design it using the folks that are going to utilize it in your mind. However ensure that a bath room design even offers a general use factor too.

For example: If you were designing your bathroom for families you can still design the restroom with comfortable access on the shower and bath. This would ensure that the structure would also work if you have limited mobility. This means if you opt to sell your property or if you are renovating for profit your design carries a wider market appeal. Great bathroom design also uses the space well, taking into consideration the sunshine or window space, sized fittings, and drainage options. Draw out an idea to scale and right down the sizes of the room. Mark the present drainage points and then and water inlet points. Write down a wish report on the toilet fittings to require and wish making use of their sizes. Now marry the 2 together to see what fits. Note: Most bathroom drainage and water inlet points could be moved but this does come at extra expense.
Best 20+ Basement bars ideas on Pinterest

Bathroom remodel
If you have decided to perform the project yourself or part of the task it's time to work with a skip bin and retrieve the existing bathroom. If your property was made pre 1980 you might have fibro bathroom wall linings with asbestos inside and great care should be taken. You will need some full body disposable overalls, eye protection, and quality dust mask. Check with your local building authority or council in connection with regulation on bathroom asbestos wall lining removal.
Remove everything except the plumbing. If you keep the bathroom plumbing available you will not have to turn the water off for the entire house. Also you should jack hammer a floor tiles up along with the sand and cement bed they are laid on.
Best 20+ Basement bars ideas on Pinterest

Bathroom Renovation and construction
Bathrooms must be construction properly through the start to be sure that the finished job is correct and true. This also ensures the look and look of the bathroom could have an incredible finish
The Bathroom Renovation Process

Install water and drainage pipe and electrical wires.

Install wall lining and ceiling and after that install the bath hob and bath.

Waterproof the ground and shower and bath recess.

Correct late the ground with sand and cement ready for tiling.

Lay floor and wall tiles and after that grout.

Install new bathroom vanity, fittings, and taps - install new electrical.
14+ Bar Cabinet Designs, Ideas  Design Trends  Premium PSD, Vector Downloads


Paint ceiling and final  one - Plumbing and electrical
At now all new plumbing is installed for clean cold and warm water and drainage. Careful attention has to be taken when positioning the new plumbing so the plumbing fittings are correct if the tiling ends. For example: To centre a fitting in a shower recess you need to consider the thickness from the wall board, tile glue and tile hence the fitting will likely be centred as soon as the tiles are in place. The same relates to installing drainage pipes to get a toilet; the wall lining and tile thickness should be looked at hence the pipe influences correct position once the toilet is installed after tiling. Also rough inside any new electrical wires without connecting them for the mains power.
25+ best ideas about Small Basement Bars on Pinterest  Small man caves, Small bar areas and

Step two - Install wall and ceiling linings
Install your 6mm wall lining fostering to nail the fibro board every 150mm without nailing into the brand new pipes and electrical wires. The best way would be to measure and mark the pipe and wire layout on to your new wall board which has a pencil as you go. Screw up (or nail) the ceiling lining, plasterboard is the most common. However if you are laying your tiles from floor to ceiling tend not to install the cornice as this is done after tiling. If you're not tiling towards the ceiling go ahead and install the cornice after the wallboard and ceiling lining happen to be installed. Also if your bath just isn't freestanding anyone can from the frame and install the bath. Ensure the tub is installed correctly enabling the thickness with the tiles and  sure to check on all linings and pipes before you continue with your bathroom renovation.

Best 20+ Basement bars ideas on Pinterest
25+ Contemporary Home Bar Design Ideas  EverCoolHomes

Step three - Waterproof your bathroom
Waterproof your bathroom floor, shower recess, and around the bathtub. When waterproofing a floor make sure that the waterproofing comes 100mm in the walls. The shower recess will have to be waterproofed 100mm over the shower rose outlet. Also the bath must be waterproofed 100mm higher than the lip with the bath about and for the floor. At the doorway use a 25 x 25mm aluminum angle glued into place with quality silicone and waterproof in to the lip. Your whole bathroom should now the tanked, therefore the all water will simply go down a drain. Bathroom waterproofing tip: waterproofing is a simple job but quality and accuracy is most critical.
Step four - Lay in the cement screed for the floor.

Before the ground tiles can laid the floor must be smooth and fairly flat having a slight fall for the drainage outlet. To do this you have to use sand and cement mix and it's also best to put in a waterproofing agent into this too. With a level, set the bottom level in the doorway. Use the top aluminum angle as the finished floor level and measure around the thickness in the tile plus 10mm for the glue. Mark around the lavatory having a level and after that screed inside your sand and cement mix using a 1 to 3 degree fall to the top in the drain outlet. Take your time and acquire it right with all the finished level as smooth as you possibly can. When the sand cement mix has set but just isn't dry (it is possible to walk onto it however, you it's still a little soft) rub it over using a house brick. This will remove every one of the small highs and lows and appearance with a level when you go. Let the bathroom floor fully dry and then you should have a great surface to tile onto. Tip: greater work you place into the bottom screed the easier your tiling will probably be.
Best 20+ Basement bars ideas on Pinterest
Best 20+ Basement bars ideas on Pinterest

Step five: Tile floor and walls
Lay your tiles on the bottom first then grout. Then lay your wall tiles making certain that they're level because you lay. Once the lavatory tiles are already cut and laid, grout your entire tiles and then buff the tiles clean.
Step six: Install plumbing fitting and fixtures
Install your plumbing fittings and taps. Also fit all of your towel rails and soap holders. Fit your bathroom vanity making certain it can be level and sealed round the top with silicone and also seal around the bath. Tip: make sure they have been in the right place prior to deciding to drill into your tiles.
14+ Bar Cabinet Designs, Ideas Design Trends Premium PSD, Vector Downloads
Best 20+ Basement bars ideas on Pinterest

Step seven: painting, and cleaning - enjoy
Paint your ceiling and do a final clean ensuring it is all totally fitted correctly and that there are no leaks with your plumbing. - Enjoy your brand-new bathroom.

Comments