Bathroom Renovation - A Step by Step Guide

Bathrooms are one of the smallest rooms at home and they are also the most costly to renovate. Bathroom renovation is a job that, if done well, may add value to a home along with a great space filled with design and light.
24+ Bathroom Pedestal Sinks Ideas, Designs  Design Trends  Premium PSD, Vector Downloads

Bathroom design
Bathroom design will be the first part of your bathroom renovation you should get right. Just replacing the current bathroom with the exact same design will not be enough. The key to great bathroom design is to design it with all the folks that are likely to put it to use in mind. However make certain that your bathrooms design boasts an over-all use factor at the same time.

For example: If you were designing your bathrooms for families you could still design the bathroom with easy accessibility on the shower and bath. This would make certain that the design would also work for people with limited mobility. This means if you decide to sell your own home or if you are renovating for profit your design features a wider market appeal. Great bathroom design also uses the room well, taking into consideration the light or window space, size fittings, and drainage options. Draw out an idea to scale and down the sizes of the room. Mark the existing drainage points after which and water inlet points. Write down a wish listing of the toilet fittings to require and wish with their sizes. Now marry both the together and see what fits. Note: Most bathroom drainage and water inlet points can be moved but this certainly does come at extra expense.
18+ Bathroom Curtain Designs, Decorating Ideas  Design Trends  Premium PSD, Vector Downloads

Bathroom remodel
If you have chosen to complete the job yourself or part of the work it can be time to hire a skip bin and grab the old bathroom. If your house is made pre 1980 maybe you have fibro bathroom wall linings with asbestos inside and great care will have to be taken. You will need some full body disposable overalls, eye protection, and quality dust mask. Check with the local building authority or council in connection with regulation on bathroom asbestos wall lining removal.
Remove everything except the plumbing. If you keep the lavatory plumbing in place you will not have to turn the water off for the complete house. Also you will need to jack hammer the bottom tiles up and also the sand and cement bed they are laid on.
Small Bathroom Design Trends and Ideas for Modern Bathroom Remodeling Projects

Bathroom Renovation and construction
Bathrooms should be construction properly from your start to make certain that the finished job is correct and true. This also ensures the structure and appear of the bathroom could have a fantastic finish
The Bathroom Renovation Process

Install water and drainage pipe and electrical wires.

Install wall lining and ceiling then install the bathtub hob and bath.

Waterproof the bottom and shower and bath recess.

Correct nov the floor with sand and cement ready for tiling.

Lay floor and wall tiles after which grout.

Install new bathroom vanity, fittings, and taps - install new electrical.
Bathroom Remodeling DIY Information Pictures Photos Ceramic Niches Shower Shelves Kitchen


Paint ceiling and final  one - Plumbing and electrical
At this time brand new plumbing is installed for clean cold and warm water and drainage. Careful attention must be taken when positioning the new plumbing so the plumbing fittings are correct if the tiling ends. For example: To centre a fitting in a very shower recess you need to think about the thickness in the wall board, tile glue and tile hence the fitting will be centred following your tiles are set up. The same refers to installing drainage pipes for the toilet; the wall lining and tile thickness should be considered so the pipe influences correct position if the toilet is installed after tiling. Also rough in the any new electrical wires without connecting them on the mains power.
100 Small Bathroom Designs  Ideas

Step two - Install wall and ceiling linings
Install your 6mm wall lining being careful to nail the fibro board every 150mm without nailing into the new pipes and electrical wires. The best way is to measure and mark the pipe and wire layout on to your new wall board with a pencil while you go. Screw up (or nail) the ceiling lining, plasterboard may be the most common. However if you happen to be laying your tiles from floor to ceiling tend not to install the cornice as this is most effectively achieved after tiling. If you're not tiling towards the ceiling go ahead and install the cornice following your wallboard and ceiling lining have been installed. Also if your bath is not freestanding you can now from the frame and install the bathtub. Ensure the tub is installed correctly enabling the thickness of the tiles and  sure to check all linings and pipes before you decide to continue with your bathrooms renovation.

18+ Bathroom Curtain Designs, Decorating Ideas Design Trends Premium PSD, Vector Downloads
24+ Bathroom Pedestal Sinks Ideas, Designs  Design Trends  Premium PSD, Vector Downloads

Step three - Waterproof your bathrooms
Waterproof your bathroom floor, shower recess, and around the bath. When waterproofing the bottom make sure that the waterproofing comes 100mm up the walls. The shower recess will need to be waterproofed 100mm over the shower rose outlet. Also the bathtub must be waterproofed 100mm above the lip with the bath about and on the floor. At the doorway install a 25 x 25mm aluminum angle glued into place with quality silicone and waterproof in the lip. Your whole bathroom should now the tanked, hence the all water is only going to drop a drain. Bathroom waterproofing tip: waterproofing is an easy job but quality and accuracy is most crucial.
Step four - Lay in the cement screed for the ground.

Before the bottom tiles can laid the floor has to be smooth and fairly flat using a slight fall for the drainage outlet. To do this you need to use sand and cement mix which is better to put in a waterproofing agent into this also. With a level, set the floor level on the doorway. Use the top aluminum angle because the finished floor level and measure down the thickness from the tile plus 10mm for your glue. Mark right around the bathroom which has a level then screed within your sand and cement mix with a 1 to 3 degree fall towards the top from the drain outlet. Take your time and have it right with all the finished level as smooth as is possible. When the sand cement mix has set but isn't dry (you'll be able to walk onto it however, you it's still somewhat soft) rub it over having a house brick. This will remove each of the small highs and lows and appearance having a level while you go. Let the lavatory floor fully dry and after that you should have an incredible surface to tile onto. Tip: greater work you put into a floor screed the easier your tiling will be.
Small Bathroom Design Trends and Ideas for Modern Bathroom Remodeling Projects
18+ Bathroom Curtain Designs, Decorating Ideas  Design Trends  Premium PSD, Vector Downloads

Step five: Tile floor and walls
Lay your tiles on the floor first after which grout. Then lay your wall tiles ensuring that that they're level when you lay. Once the toilet tiles have been cut and laid, grout your entire tiles and after that buff the tiles clean.
Step six: Install plumbing fitting and fixtures
Install your entire plumbing fittings and taps. Also fit your entire towel rails and soap holders. Fit a new bathroom vanity making certain it's level and sealed across the top with silicone as well as seal around the bath. Tip: make sure they come in the right place before you decide to drill in your tiles.
Bathroom Remodeling DIY Information Pictures Photos Ceramic Niches Shower Shelves Kitchen
Small Bathroom Design Trends and Ideas for Modern Bathroom Remodeling Projects

Step seven: painting, and cleaning - enjoy
Paint your ceiling and execute a final clean ensuring that things are all fitted correctly knowning that there won't be any leaks within your plumbing. - Enjoy a new bathroom.