21 Modern Country Houses The Study

New Homes Interior Photos 21 Modern Country Houses The Study

Bathroom Renovation - A Step by Step Guide

Bathrooms are one of the smallest rooms at home and they are also the most expensive for renovate. Bathroom renovation is a job that, if done well, may add value to your home as well as a great space full of design and lightweight.
21 Modern Country Houses  The Study

Bathroom design
Bathroom design will be the first part of your bathroom renovation you should get right. Just replacing the current bathroom sticking with the same design is probably not enough. The key to great bathroom design is usually to design it using the people that are likely to apply it at heart. However make sure that your bathroom design boasts a general use factor also.

For example: If you were designing your bathrooms for families you can still design the bathroom with quick access on the shower and bath. This would be sure that the style would recieve treatment for people with limited mobility. This means if you decide to sell your home or if you happen to be renovating for profit your design has a wider market appeal. Great bathroom design also uses the space well, considering the lighting or window space, height and width of fittings, and drainage options. Draw out a plan to scale and all the way down the sizes of the room. Mark the current drainage points and after that and water inlet points. Write down a wish listing of the lavatory fittings to wish and want with their sizes. Now marry both the together and find out what fits. Note: Most bathroom drainage and water inlet points might be moved but this certainly does come at extra expense.
Taos, New Mexico 87571 Listing 19213 — Green Homes For Sale

Bathroom remodel
If you've decided to perform the task yourself or part of the task it can be time to work with a skip bin and grab the previous bathroom. If your home is made pre 1980 maybe you have fibro bathroom wall linings with asbestos within it and great care will have to be taken. You will need some full body disposable overalls, eye protection, and quality dust mask. Check with your local building authority or council in connection with regulation on bathroom asbestos wall lining removal.
Remove everything except the plumbing. If you keep the restroom plumbing in position you'll not ought to turn water off for the whole house. Also you should jack hammer the floor tiles up and the sand and cement bed that they're laid on.
An Interior Designer’s Gut Renovation Transforms a Dated Chelsea Coop  Curbed NY

Bathroom Renovation and construction
Bathrooms should be construction properly through the ground-up to make certain that the finished job is correct and true. This also ensures the style and appear of the lavatory may have an excellent finish
The Bathroom Renovation Process

Install water and drainage pipe and electrical wires.

Install wall lining and ceiling after which install the bath hob and bath.

Waterproof the floor and shower and bath recess.

Correct late the bottom with sand and cement ready for tiling.

Lay floor and wall tiles and after that grout.

Install new bathroom vanity, fittings, and taps - install new electrical.
15 Unusual Features in Oprah Winfreys New House


Paint ceiling and final  one - Plumbing and electrical
At this point many new plumbing is installed for clean cold and hot water and drainage. Careful attention needs to be taken when positioning the brand new plumbing so that the plumbing fittings are correct once the tiling ends. For example: To centre a fitting in the shower recess you need to take into consideration the thickness in the wall board, tile glue and tile therefore the fitting will probably be centred following the tiles are in position. The same relates to installing drainage pipes for any toilet; the wall lining and tile thickness have to be taken into account therefore the pipe is in the correct position when the toilet is installed after tiling. Also rough in the any new electrical wires without connecting them to the mains power.
Quattro Homes  New Homes  Renovations  Extensions

Step two - Install wall and ceiling linings
Install your 6mm wall lining being careful to nail the fibro board every 150mm without nailing into the newest pipes and electrical wires. The best way is to measure and mark the pipe and wire layout on your new wall board with a pencil as you go. Screw up (or nail) the ceiling lining, plasterboard could be the most common. However if you might be laying your tiles from floor to ceiling don't install the cornice as this is best done after tiling. If you're not tiling towards the ceiling go ahead and install the cornice as soon as the wallboard and ceiling lining are already installed. Also if your bath isn't freestanding you can now form the frame and install the bath. Ensure the bathtub is installed correctly permitting the thickness with the tiles and  sure to test all linings and pipes prior to deciding to continue with your bathrooms renovation.

Taos, New Mexico 87571 Listing 19213 — Green Homes For Sale
21 Modern Country Houses  The Study

Step three - Waterproof your bathroom
Waterproof a bath room floor, shower recess, and around the bathtub. When waterproofing the ground be sure that the waterproofing comes 100mm up the walls. The shower recess will have to be waterproofed 100mm over the shower rose outlet. Also the bathtub ought to be waterproofed 100mm above the lip with the bath right around and towards the floor. At the doorway use a 25 x 25mm aluminum angle glued into place with quality silicone and waterproof into the lip. Your whole bathroom should now the tanked, hence the all water is only going to go down a drain. Bathroom waterproofing tip: waterproofing is a simple job but quality and accuracy is most important.
Step four - Lay within the cement screed for a floor.

Before the ground tiles can laid the ground has to be smooth and fairly flat which has a slight fall on the drainage outlet. To do this you must use sand and cement mix in fact it is far better to give a waterproofing agent into this at the same time. With a level, set the bottom level in the doorway. Use the top aluminum angle because finished floor level and measure along the thickness from the tile plus 10mm for your glue. Mark about the toilet which has a level then screed in your sand and cement mix using a 1 to 3 degree fall on the top with the drain outlet. Take your time and obtain it right while using finished level as smooth as is possible. When the sand cement mix has set but is not dry (you can walk onto it but you will still be a bit soft) rub it over with a house brick. This will remove all the small highs and lows and appearance having a level as you go. Let the toilet floor fully dry then you really should have an excellent surface to tile onto. Tip: the harder work you set into the bottom screed the more your tiling will likely be.
An Interior Designer’s Gut Renovation Transforms a Dated Chelsea Coop Curbed NY
Taos, New Mexico 87571 Listing 19213 — Green Homes For Sale

Step five: Tile floor and walls
Lay your tiles on the floor first then grout. Then lay your wall tiles ensuring that that they are level while you lay. Once the restroom tiles have been cut and laid, grout all your tiles then buff the tiles clean.
Step six: Install plumbing fitting and fixtures
Install all your plumbing fittings and taps. Also fit your towel rails and soap holders. Fit your brand-new bathroom vanity ensuring it can be level and sealed round the top with silicone plus seal around the tub. Tip: make sure they are in the right place when you drill to your tiles.
15 Unusual Features in Oprah Winfreys New House
An Interior Designer’s Gut Renovation Transforms a Dated Chelsea Coop  Curbed NY

Step seven: painting, and cleaning - enjoy
Paint your ceiling and perform final clean making certain it is all totally fitted correctly understanding that there aren't any leaks inside your plumbing. - Enjoy your new bathroom.

Comments