2016 Architecture Design Trends HMH Architecture + Interiors Boulder

Home Office Design 21 Condo Home Office Designs, Decorating Ideas | Design Trends 2016 Architecture Design Trends HMH Architecture + Interiors Boulder

Bathroom Renovation - A Step by Step Guide

Bathrooms are one of the smallest rooms inside your home and they are also certainly the most costly to renovate. Bathroom renovation can be a job that, if done well, can add value with a home as well as a great space packed with design and light-weight.
2016 Architecture  Design Trends  HMH Architecture + Interiors Boulder

Bathroom design
Bathroom design could be the first part of your bathroom renovation you ought to get right. Just replacing the existing bathroom sticking with the same design will not be enough. The key to great bathroom design is to design it while using people who will put it to use in your mind. However be sure that your bathroom design also offers a general use factor as well.

For example: If you were designing a bathroom for families you might still design the restroom with easy access for the shower and bath. This would ensure that the style would recieve treatment for those who have limited mobility. This means if you sell your property or if you happen to be renovating for profit your design includes a wider market appeal. Great bathroom design also uses space well, considering the sunshine or window space, sized fittings, and drainage options. Draw out a plan to scale and down the sizes of your respective room. Mark the prevailing drainage points and then and water inlet points. Write down a wish report on the toilet fittings to wish and desire using their sizes. Now marry both the together and find out what fits. Note: Most bathroom drainage and water inlet points could be moved but this will come at expense.
10 Interior Design Trends 2017 by KOKET

Bathroom remodel
If you've decided to do the task yourself or part of the work it is time to work with a skip bin and pull out the previous bathroom. If your house was developed pre 1980 you may have fibro bathroom wall linings with asbestos in it and great care must be taken. You will need some full body disposable overalls, eye protection, and quality dust mask. Check with the local building authority or council concerning the regulation on bathroom asbestos wall lining removal.
Remove everything except the plumbing. If you keep the bathroom plumbing available you won't need to turn the water off for the complete house. Also you should jack hammer the ground tiles up and also the sand and cement bed that they're laid on.
2018 Design Trends: Kitchen  Emily Henderson

Bathroom Renovation and construction
Bathrooms have to be construction properly in the ground-up to ensure that the finished job is correct and true. This also ensures the design and look of the bathroom can have a great finish
The Bathroom Renovation Process

Install water and drainage pipe and electrical wires.

Install wall lining and ceiling and then install the tub hob and bath.

Waterproof the bottom and shower and bath recess.

Correct the fall of a floor with sand and cement ready for tiling.

Lay floor and wall tiles after which grout.

Install new bathroom vanity, fittings, and taps - install new electrical.
2017 Interior Design Trends  OnStage


Paint ceiling and final  one - Plumbing and electrical
At this point all new plumbing is installed for clean cold and warm water and drainage. Careful attention has to be taken when positioning the brand new plumbing so your plumbing fittings are correct in the event the tiling ends. For example: To centre a fitting inside a shower recess you have to think about the thickness with the wall board, tile glue and tile hence the fitting will probably be centred following your tiles are available. The same refers to installing drainage pipes for the toilet; the wall lining and tile thickness has to be looked at and so the pipe is incorporated in the correct position when the toilet is installed after tiling. Also rough within the any new electrical wires without connecting them towards the mains power.
21+ Modern Office Chair Designs, Decorating Ideas  Design Trends  Premium PSD, Vector Downloads

Step two - Install wall and ceiling linings
Install your 6mm wall lining fostering to nail the fibro board every 150mm without nailing into the modern pipes and electrical wires. The best way would be to measure and mark the pipe and wire layout on to your new wall board with a pencil when you go. Screw up (or nail) the ceiling lining, plasterboard is the most common. However if you happen to be laying your tiles from floor to ceiling do not install the cornice because done after tiling. If you might be not tiling towards the ceiling proceed to install the cornice after the wallboard and ceiling lining have been installed. Also if your bath just isn't freestanding you can now from the frame and install the bath. Ensure the bathtub is installed correctly enabling the thickness from the tiles and  sure to check all linings and pipes before you continue with your bathroom renovation.

10 Interior Design Trends 2017 by KOKET
2016 Architecture  Design Trends  HMH Architecture + Interiors Boulder

Step three - Waterproof your bathroom
Waterproof your bathrooms floor, shower recess, and around the tub. When waterproofing the bottom make certain that the waterproofing comes 100mm in the walls. The shower recess should be waterproofed 100mm above the shower rose outlet. Also the bathtub should be waterproofed 100mm over the lip with the bath about and for the floor. At the doorway use a 25 x 25mm aluminum angle glued into place with quality silicone and waterproof into the lip. Your whole bathroom should now the tanked, therefore the all water will still only go down a drain. Bathroom waterproofing tip: waterproofing is a simple job but quality and accuracy is most critical.
Step four - Lay inside cement screed for the bottom.

Before the bottom tiles can laid the bottom must be smooth and fairly flat using a slight fall for the drainage outlet. To do this you must use sand and cement mix which is advisable to include a waterproofing agent into this too. With a level, set the bottom level at the doorway. Use the top aluminum angle because the finished floor level and measure along the thickness in the tile plus 10mm for that glue. Mark about the bathroom using a level after which screed within your sand and cement mix which has a 1 to 3 degree fall for the top with the drain outlet. Take your time and have it right while using finished level as smooth as possible. When the sand cement mix has set but isn't dry (you are able to walk onto it nevertheless, you it's still a lttle bit soft) rub it over having a house brick. This will remove all of the small highs and lows and appearance which has a level when you go. Let the lavatory floor fully dry and after that you should have a fantastic surface to tile onto. Tip: the more work you add into the bottom screed the more your tiling is going to be.
2018 Design Trends: Kitchen Emily Henderson
10 Interior Design Trends 2017 by KOKET

Step five: Tile floor and walls
Lay your tiles on the bottom first and after that grout. Then lay your wall tiles ensuring actually level because you lay. Once the lavatory tiles have been cut and laid, grout your entire tiles after which buff the tiles clean.
Step six: Install plumbing fitting and fixtures
Install your plumbing fittings and taps. Also fit all your towel rails and soap holders. Fit your new bathroom vanity ensuring it can be level and sealed around the top with silicone plus seal around the tub. Tip: make sure they will be in the right place prior to deciding to drill into the tiles.
2017 Interior Design Trends OnStage
2018 Design Trends: Kitchen  Emily Henderson

Step seven: painting, and cleaning - enjoy
Paint your ceiling and perform a final clean ensuring everything is fitted correctly which there are no leaks inside your plumbing. - Enjoy your bathroom.

Comments