20+ Best Kitchen Countertops Design Ideas Types of Kitchen Counters

Kitchen Countertops Design 40 Best Kitchen Countertops Design Ideas Types Of Kitchen Counters 20+ Best Kitchen Countertops Design Ideas Types of Kitchen Counters

Bathroom Renovation - A Step by Step Guide

Bathrooms are one of the smallest rooms in the house plus they are also certainly the most expensive for renovate. Bathroom renovation is a job that, if done well, may add value to your home and a great space packed with design and lightweight.
20+ Best Kitchen Countertops Design Ideas  Types of Kitchen Counters

Bathroom design
Bathroom design is the first area of your bathrooms renovation you ought to get right. Just replacing the prevailing bathroom with the same design is probably not enough. The key to great bathroom design is to design it while using folks that will use it planned. However make sure that a bath room design also has a broad use factor also.

For example: If you were designing a bathroom for families you can still design the lavatory with easy access to the shower and bath. This would ensure that the structure would also work if you have limited mobility. This means if you choose to sell your property or if you're renovating for profit your design has a wider market appeal. Great bathroom design also uses the area well, looking at the sunshine or window space, size fittings, and drainage options. Draw out an agenda to scale and right down the sizes of the room. Mark the prevailing drainage points then and water inlet points. Write down a wish listing of the toilet fittings to want and need making use of their sizes. Now marry both together and find out what fits. Note: Most bathroom drainage and water inlet points can be moved but this will come at extra expense.
Quartz Kitchen Countertops: Pictures  Ideas From HGTV  HGTV

Bathroom remodel
If you've decided to perform the project yourself or part of the task it really is time to hire a skip bin and pull out the old bathroom. If your house appeared pre 1980 you might have fibro bathroom wall linings with asbestos inside and great care must be taken. You will need some full body disposable overalls, eye protection, and quality dust mask. Check with any local building authority or council in connection with regulation on bathroom asbestos wall lining removal.
Remove everything except the plumbing. If you keep the lavatory plumbing in place you'll not ought to turn the lake off for the entire house. Also you will need to jack hammer the ground tiles up along with the sand and cement bed they are laid on.
Our 13 Favorite Kitchen Countertop Materials  HGTV

Bathroom Renovation and construction
Bathrooms must be construction properly from your ground-up to ensure that the finished job is correct and true. This also ensures the design and look of the restroom could have an excellent finish
The Bathroom Renovation Process

Install water and drainage pipe and electrical wires.

Install wall lining and ceiling after which install the bath hob and bath.

Waterproof the bottom and shower and bath recess.

Correct nov a floor with sand and cement ready for tiling.

Lay floor and wall tiles after which grout.

Install new bathroom vanity, fittings, and taps - install new electrical.
2 cm counter w/out built up edge!  kitchen remodel ideas  Pinterest


Paint ceiling and final  one - Plumbing and electrical
At this point brand new plumbing is installed for clean cold and hot water and drainage. Careful attention must be taken when positioning the brand new plumbing so the plumbing fittings are correct if the tiling is fully gone. For example: To centre a fitting in a shower recess you need to take into consideration the thickness with the wall board, tile glue and tile therefore the fitting will be centred following the tiles are available. The same relates to installing drainage pipes for a toilet; the wall lining and tile thickness has to be taken into consideration therefore the pipe influences correct position if the toilet is installed after tiling. Also rough in the any new electrical wires without connecting them to the mains power.
Very Effective and Durable Kitchen Countertops IdeasCapricornradio Homes

Step two - Install wall and ceiling linings
Install your 6mm wall lining fostering to nail the fibro board every 150mm without nailing into the modern pipes and electrical wires. The best way is to measure and mark the pipe and wire layout on your new wall board using a pencil as you go. Screw up (or nail) the ceiling lining, plasterboard is the most common. However if you are laying your tiles from floor to ceiling tend not to install the cornice because best done after tiling. If you happen to be not tiling for the ceiling just install the cornice as soon as the wallboard and ceiling lining are actually installed. Also if your bath is just not freestanding you can now from the frame and install the tub. Ensure the tub is installed correctly enabling the thickness of the tiles and  sure to check all linings and pipes prior to deciding to continue with your bathrooms renovation.

Quartz Kitchen Countertops: Pictures Ideas From HGTV HGTV
20+ Best Kitchen Countertops Design Ideas  Types of Kitchen Counters

Step three - Waterproof your bathrooms
Waterproof a bath room floor, shower recess, and around the bath. When waterproofing the bottom make sure that the waterproofing comes 100mm inside the walls. The shower recess should be waterproofed 100mm above the shower rose outlet. Also the bathtub should be waterproofed 100mm higher than the lip of the bath right around and on the floor. At the doorway install a 25 x 25mm aluminum angle glued into place with quality silicone and waterproof in to the lip. Your whole bathroom should now the tanked, therefore the all water is only going to go lower a drain. Bathroom waterproofing tip: waterproofing is a simple job but quality and accuracy is most significant.
Step four - Lay in the cement screed for the ground.

Before the ground tiles can laid a floor has to be smooth and fairly flat with a slight fall on the drainage outlet. To do this you must use sand and cement mix and it is advisable to add a waterproofing agent into this at the same time. With a level, set the ground level with the doorway. Use the top aluminum angle as the finished floor level and measure on the thickness from the tile plus 10mm for the glue. Mark around the restroom which has a level then screed inside your sand and cement mix using a 1 to 3 degree fall towards the top of the drain outlet. Take your time and get it right with the finished level as smooth as you possibly can. When the sand cement mix has set but is just not dry (you'll be able to walk on it nevertheless, you it is still a bit soft) rub it over which has a house brick. This will remove all of the small highs and lows and look using a level while you go. Let the bathroom floor fully dry then you needs to have an excellent surface to tile onto. Tip: the more work you add into a floor screed the simpler your tiling will probably be.
Our 13 Favorite Kitchen Countertop Materials HGTV
Quartz Kitchen Countertops: Pictures  Ideas From HGTV  HGTV

Step five: Tile floor and walls
Lay your tiles on the floor first then grout. Then lay your wall tiles ensuring that that they're level as you lay. Once the toilet tiles are already cut and laid, grout your tiles and then buff the tiles clean.
Step six: Install plumbing fitting and fixtures
Install your plumbing fittings and taps. Also fit your towel rails and soap holders. Fit your new bathroom vanity ensuring it can be level and sealed throughout the top with silicone and in addition seal around the bath. Tip: make sure they have been in the right place before you decide to drill to your tiles.
2 cm counter w/out built up edge! kitchen remodel ideas Pinterest
Our 13 Favorite Kitchen Countertop Materials  HGTV

Step seven: painting, and cleaning - enjoy
Paint your ceiling and execute a final clean making sure it is all totally fitted correctly knowning that there are no leaks inside your plumbing. - Enjoy your new bathroom.

Comments