2 Storey Commercial Building Design In Philippines YouTube

Small Apartment Building Designs Apartment Building Design 2 Storey Commercial Building Design In Philippines YouTube

Bathroom Renovation - A Step by Step Guide

Bathrooms are probably the smallest rooms at home and they're also one the most costly to renovate. Bathroom renovation is really a job that, if done well, can also add value to a home plus a great space brimming with design and light-weight.
2 Storey Commercial Building Design In Philippines  YouTube

Bathroom design
Bathroom design will be the first section of your bathroom renovation you need right. Just replacing the current bathroom with similar design might not be enough. The key to great bathroom design is always to design it with the people that will certainly apply it in mind. However be sure that a bath room design also has a general use factor at the same time.

For example: If you were designing a bathroom for families you could still design the toilet with easy accessibility on the shower and bath. This would be sure that the style would also work for people with limited mobility. This means if you opt to sell your home or if you're renovating for profit your design includes a wider market appeal. Great bathroom design also uses the area well, looking at the sunlight or window space, height and width of fittings, and drainage options. Draw out a plan to scale and right down the sizes of your respective room. Mark the prevailing drainage points then and water inlet points. Write down a wish list of the restroom fittings to want and want using their sizes. Now marry both together and discover what fits. Note: Most bathroom drainage and water inlet points may be moved but this may come at extra cost.
Nanogrid Building in San Francisco Grapples with Utility Incentives  Microgrid Knowledge

Bathroom remodel
If you have decided to accomplish the work yourself or part of the job it can be time to hire a skip bin and take out the previous bathroom. If your own home was made pre 1980 you might have fibro bathroom wall linings with asbestos in it and great care should be taken. You will need some full body disposable overalls, eye protection, and quality dust mask. Check with any local building authority or council about the regulation on bathroom asbestos wall lining removal.
Remove everything except the plumbing. If you keep the lavatory plumbing available you won't have to turn the water off for your house. Also you should jack hammer the ground tiles up and the sand and cement bed they are laid on.
Building Design

Bathroom Renovation and construction
Bathrooms must be construction properly in the start to be sure that the finished job is correct and true. This also ensures the style and look of the restroom will have an incredible finish
The Bathroom Renovation Process

Install water and drainage pipe and electrical wires.

Install wall lining and ceiling and then install the bath hob and bath.

Waterproof the bottom and shower and bath recess.

Correct december the bottom with sand and cement ready for tiling.

Lay floor and wall tiles and after that grout.

Install new bathroom vanity, fittings, and taps - install new electrical.
Foster Dale Architects / design bookmark 22251


Paint ceiling and final  one - Plumbing and electrical
At now all new plumbing is installed for clean hot and cold water and drainage. Careful attention must be taken when positioning the new plumbing so the plumbing fittings are correct when the tiling is completed. For example: To centre a fitting in the shower recess you must consider the thickness in the wall board, tile glue and tile and so the fitting will probably be centred as soon as the tiles are in position. The same applies to installing drainage pipes for any toilet; the wall lining and tile thickness has to be looked at so the pipe is incorporated in the correct position in the event the toilet is installed after tiling. Also rough inside any new electrical wires without connecting them to the mains power.
THOUGHTSKOTO

Step two - Install wall and ceiling linings
Install your 6mm wall lining the constant maintenance to nail the fibro board every 150mm without nailing into the brand new pipes and electrical wires. The best way is usually to measure and mark the pipe and wire layout onto your new wall board using a pencil while you go. Screw up (or nail) the ceiling lining, plasterboard is the most common. However if you're laying your tiles from floor to ceiling do not install the cornice because best done after tiling. If you happen to be not tiling to the ceiling go ahead and install the cornice after the wallboard and ceiling lining are already installed. Also if your bath is not freestanding now you can make up the frame and install the bathtub. Ensure the bath is installed correctly enabling the thickness with the tiles and  sure to check all linings and pipes before you decide to continue with your bathroom renovation.

Nanogrid Building in San Francisco Grapples with Utility Incentives Microgrid Knowledge
2 Storey Commercial Building Design In Philippines  YouTube

Step three - Waterproof a bath room
Waterproof your bathroom floor, shower recess, and around the tub. When waterproofing the ground be sure that the waterproofing comes 100mm in the walls. The shower recess must be waterproofed 100mm higher than the shower rose outlet. Also the bath should be waterproofed 100mm over the lip of the bath right around and towards the floor. At the doorway put in a 25 x 25mm aluminum angle glued into place with quality silicone and waterproof into the lip. Your whole bathroom should now the tanked, so the all water will simply drop a drain. Bathroom waterproofing tip: waterproofing is a simple job but quality and accuracy is most crucial.
Step four - Lay inside cement screed for the bottom.

Before a floor tiles can laid the bottom have to be smooth and fairly flat which has a slight fall towards the drainage outlet. To do this you need to use sand and cement mix and it's also far better to give a waterproofing agent into this also. With a level, set the ground level in the doorway. Use the top aluminum angle since the finished floor level and measure around the thickness in the tile plus 10mm for the glue. Mark right around the restroom with a level and after that screed within your sand and cement mix with a 1 to 3 degree fall to the top of the drain outlet. Take your time and get it right using the finished level as smooth as possible. When the sand cement mix has set but is not dry (it is possible to walk about it however you will still be somewhat soft) rub it over with a house brick. This will remove all of the small highs and lows and appearance with a level while you go. Let the toilet floor fully dry after which you really should have a great surface to tile onto. Tip: greater work you set into the floor screed the easier your tiling will likely be.
Building Design
Nanogrid Building in San Francisco Grapples with Utility Incentives  Microgrid Knowledge

Step five: Tile floor and walls
Lay your tiles on the ground first and after that grout. Then lay your wall tiles making certain that they're level because you lay. Once the lavatory tiles have been cut and laid, grout your tiles and then buff the tiles clean.
Step six: Install plumbing fitting and fixtures
Install your entire plumbing fittings and taps. Also fit your entire towel rails and soap holders. Fit your bathroom vanity making certain it really is level and sealed round the top with silicone as well as seal around the bath. Tip: make sure they will be in the right place when you drill into the tiles.
Foster Dale Architects / design bookmark 22251
Building Design

Step seven: painting, and cleaning - enjoy
Paint your ceiling and execute a final clean ensuring things are fitted correctly which there are no leaks with your plumbing. - Enjoy a new bathroom.

Comments