1952 Ventoura Mobile Home Remodel

Exterior Mobile Home Makeover Mobile Home Makeover Exterior Mobile Home Makeover The Catalog Of 1952 Ventoura Mobile Home Remodel

Bathroom Renovation - A Step by Step Guide

Bathrooms are probably the smallest rooms at home and they're also one the most expensive for renovate. Bathroom renovation is often a job that, if done well, may add value with a home as well as a great space full of design and light-weight.
1952 Ventoura Mobile Home Remodel

Bathroom design
Bathroom design is the first area of a bath room renovation you need right. Just replacing the present bathroom with the same design will not be enough. The key to great bathroom design is to design it while using people who are going to use it planned. However ensure that your bathrooms design also offers an over-all use factor as well.

For example: If you were designing a bathroom for families you can still design the lavatory with easy access for the shower and bath. This would ensure that the structure would work for people with limited mobility. This means if you opt to sell your own home or if you are renovating for profit your design includes a wider market appeal. Great bathroom design also uses the area well, taking into consideration the light or window space, size of fittings, and drainage options. Draw out a strategy to scale and all the way down the sizes of one's room. Mark the existing drainage points then and water inlet points. Write down a wish listing of the restroom fittings to need and want using sizes. Now marry the two together to see what fits. Note: Most bathroom drainage and water inlet points could be moved but this will come at extra expense.
Harrellson Job, Mobile home makeover  YouTube

Bathroom remodel
If you've decided to perform the task yourself or part of the task it is time to work with a skip bin and grab the existing bathroom. If your own home was developed pre 1980 you might have fibro bathroom wall linings with asbestos in it and great care will have to be taken. You will need some full body disposable overalls, eye protection, and quality dust mask. Check with the local building authority or council in connection with regulation on bathroom asbestos wall lining removal.
Remove everything except the plumbing. If you keep the bathroom plumbing available you'll not have to turn water off for your house. Also you will need to jack hammer the bottom tiles up as well as the sand and cement bed that they are laid on.
14 Great Mobile Home Exterior Makeover Ideas for Every Budget

Bathroom Renovation and construction
Bathrooms has to be construction properly through the start to ensure that the finished job is correct and true. This also ensures the structure and appearance of the restroom may have an excellent finish
The Bathroom Renovation Process

Install water and drainage pipe and electrical wires.

Install wall lining and ceiling and after that install the tub hob and bath.

Waterproof the ground and shower and bath recess.

Correct december the floor with sand and cement ready for tiling.

Lay floor and wall tiles and then grout.

Install new bathroom vanity, fittings, and taps - install new electrical.
Double Wide Remodel on Pinterest  Double Wide Home, Remodeling Mobile Homes and Manufactured


Paint ceiling and final  one - Plumbing and electrical
At this point all new plumbing is installed for clean cold and hot water and drainage. Careful attention has to be taken when positioning the brand new plumbing so the plumbing fittings are correct once the tiling is completed. For example: To centre a fitting inside a shower recess you need to think about the thickness from the wall board, tile glue and tile hence the fitting will likely be centred as soon as the tiles are set up. The same refers to installing drainage pipes for a toilet; the wall lining and tile thickness should be taken into consideration and so the pipe is incorporated in the correct position when the toilet is installed after tiling. Also rough in the any new electrical wires without connecting them for the mains power.
Double Wide Remodel on Pinterest  Double Wide Home, Remodeling Mobile Homes and Manufactured

Step two - Install wall and ceiling linings
Install your 6mm wall lining the constant maintenance to nail the fibro board every 150mm without nailing into the newest pipes and electrical wires. The best way is always to measure and mark the pipe and wire layout on to your new wall board having a pencil while you go. Screw up (or nail) the ceiling lining, plasterboard could be the most common. However if you happen to be laying your tiles from floor to ceiling don't install the cornice because most effectively achieved after tiling. If you're not tiling on the ceiling go ahead and install the cornice as soon as the wallboard and ceiling lining have been installed. Also if your bath just isn't freestanding it's simple to from the frame and install the bathtub. Ensure the tub is installed correctly allowing for the thickness with the tiles and  sure to check all linings and pipes before you continue with your bathrooms renovation.

Harrellson Job, Mobile home makeover YouTube
1952 Ventoura Mobile Home Remodel

Step three - Waterproof your bathroom
Waterproof your bathrooms floor, shower recess, and around the bathtub. When waterproofing the floor make sure that the waterproofing comes 100mm up the walls. The shower recess must be waterproofed 100mm across the shower rose outlet. Also the tub ought to be waterproofed 100mm above the lip with the bath around and to the floor. At the doorway purchase a 25 x 25mm aluminum angle glued into place with quality silicone and waterproof into the lip. Your whole bathroom should now the tanked, so the all water is only going to go lower a drain. Bathroom waterproofing tip: waterproofing is a straightforward job but quality and accuracy is most critical.
Step four - Lay in the cement screed for the floor.

Before a floor tiles can laid the floor have to be smooth and fairly flat having a slight fall towards the drainage outlet. To do this you should use sand and cement mix which is advisable to include a waterproofing agent into this at the same time. With a level, set the ground level on the doorway. Use the top aluminum angle since the finished floor level and measure around the thickness in the tile plus 10mm for your glue. Mark about the bathroom using a level after which screed inside your sand and cement mix with a 1 to 3 degree fall on the top from the drain outlet. Take your time and have it right with all the finished level as smooth as is possible. When the sand cement mix has set but is just not dry (it is possible to walk on it nevertheless, you will still be a little soft) rub it over with a house brick. This will remove every one of the small highs and lows and look which has a level while you go. Let the toilet floor fully dry and after that you really should have a fantastic surface to tile onto. Tip: the more work you place into a floor screed the simpler your tiling will likely be.
14 Great Mobile Home Exterior Makeover Ideas for Every Budget
Harrellson Job, Mobile home makeover  YouTube

Step five: Tile floor and walls
Lay your tiles on a floor first and after that grout. Then lay your wall tiles making certain that they are level when you lay. Once the restroom tiles have been cut and laid, grout your entire tiles then buff the tiles clean.
Step six: Install plumbing fitting and fixtures
Install your plumbing fittings and taps. Also fit your entire towel rails and soap holders. Fit your bathroom vanity making sure it can be level and sealed across the top with silicone and also seal around the bathtub. Tip: make sure they are in the right place when you drill into the tiles.
Double Wide Remodel on Pinterest Double Wide Home, Remodeling Mobile Homes and Manufactured
14 Great Mobile Home Exterior Makeover Ideas for Every Budget

Step seven: painting, and cleaning - enjoy
Paint your ceiling and do a final clean ensuring everything is fitted correctly and that there won't be any leaks inside your plumbing. - Enjoy a new bathroom.

Comments