Bathroom Renovation - A Step by Step Guide

Bathrooms are one of the smallest rooms inside your home and they are generally also the most expensive to renovate. Bathroom renovation is often a job that, if done well, will add value to some home and a great space brimming with design and lightweight.
18 Awesome Basement Remodel Ideas That You Have To Try

Bathroom design
Bathroom design may be the first part of your bathroom renovation you need to get right. Just replacing the present bathroom with the same design may not be enough. The key to great bathroom design would be to design it while using people who are going to utilize it in your mind. However make sure that your bathroom design also has an overall use factor at the same time.

For example: If you were designing a bath room for families you may still design the toilet with quick access on the shower and bath. This would make certain that the structure would recieve treatment for those who have limited mobility. This means if you opt to sell your own home or if you are renovating for profit your design features a wider market appeal. Great bathroom design also uses the space well, looking at the sunlight or window space, sized fittings, and drainage options. Draw out a strategy to scale and down the sizes of one's room. Mark the prevailing drainage points after which and water inlet points. Write down a wish report on the bathroom fittings to need and wish making use of their sizes. Now marry the 2 together and find out what fits. Note: Most bathroom drainage and water inlet points might be moved but this will come at extra expense.
24 Stunning Ideas For Designing a Contemporary Basement

Bathroom remodel
If you decide to do the project yourself or part of the job it can be time to hire a skip bin and retrieve the old bathroom. If your house appeared pre 1980 maybe you have fibro bathroom wall linings with asbestos inside and great care must be taken. You will need some full body disposable overalls, eye protection, and quality dust mask. Check with your local building authority or council in connection with regulation on bathroom asbestos wall lining removal.
Remove everything except the plumbing. If you keep the toilet plumbing in place you won't must turn the water off for the complete house. Also you will likely need to jack hammer the ground tiles up and also the sand and cement bed they are laid on.
13 Amazing Basement Design Ideas  HGTV

Bathroom Renovation and construction
Bathrooms must be construction properly from your ground-up to ensure that the finished job is correct and true. This also ensures the style and look of the toilet will have an excellent finish
The Bathroom Renovation Process

Install water and drainage pipe and electrical wires.

Install wall lining and ceiling after which install the bathtub hob and bath.

Waterproof the floor and shower and bath recess.

Correct the fall of the ground with sand and cement ready for tiling.

Lay floor and wall tiles after which grout.

Install new bathroom vanity, fittings, and taps - install new electrical.
Minnesota Basement Design Gallery  Finished Basement Company


Paint ceiling and final  one - Plumbing and electrical
At this aspect brand new plumbing is installed for clean hot and cold water and drainage. Careful attention must be taken when positioning the new plumbing so that the plumbing fittings are correct if the tiling is completed. For example: To centre a fitting in the shower recess you should take into account the thickness from the wall board, tile glue and tile and so the fitting is going to be centred as soon as the tiles are in place. The same relates to installing drainage pipes to get a toilet; the wall lining and tile thickness must be taken into consideration and so the pipe influences correct position in the event the toilet is installed after tiling. Also rough inside any new electrical wires without connecting them on the mains power.
24 Stunning Ideas For Designing a Contemporary Basement

Step two - Install wall and ceiling linings
Install your 6mm wall lining the constant maintenance to nail the fibro board every 150mm without nailing into the newest pipes and electrical wires. The best way would be to measure and mark the pipe and wire layout onto your new wall board with a pencil because you go. Screw up (or nail) the ceiling lining, plasterboard may be the most common. However if you're laying your tiles from floor to ceiling don't install the cornice as this is best done after tiling. If you are not tiling for the ceiling just install the cornice following your wallboard and ceiling lining have been installed. Also if your bath just isn't freestanding now you can from the frame and install the bath. Ensure the tub is installed correctly enabling the thickness with the tiles and  sure to evaluate all linings and pipes before you decide to continue with your bathroom renovation.

24 Stunning Ideas For Designing a Contemporary Basement
18 Awesome Basement Remodel Ideas That You Have To Try

Step three - Waterproof a bath room
Waterproof a bath room floor, shower recess, and around the tub. When waterproofing the floor make sure that the waterproofing comes 100mm the walls. The shower recess will need to be waterproofed 100mm over the shower rose outlet. Also the bath must be waterproofed 100mm higher than the lip from the bath right around and on the floor. At the doorway purchase a 25 x 25mm aluminum angle glued into place with quality silicone and waterproof in the lip. Your whole bathroom should now the tanked, and so the all water will only go down a drain. Bathroom waterproofing tip: waterproofing is an easy job but quality and accuracy is most crucial.
Step four - Lay inside the cement screed for the bottom.

Before a floor tiles can laid the floor have to be smooth and fairly flat having a slight fall on the drainage outlet. To do this you need to use sand and cement mix and it is better to give a waterproofing agent into this as well. With a level, set a floor level at the doorway. Use the top aluminum angle because finished floor level and measure along the thickness from the tile plus 10mm for your glue. Mark right around the lavatory using a level and then screed inside your sand and cement mix with a 1 to 3 degree fall to the top in the drain outlet. Take your time and acquire it right while using finished level as smooth as possible. When the sand cement mix has set but just isn't dry (it is possible to walk on it but you it's still a bit soft) rub it over having a house brick. This will remove every one of the small highs and lows and look with a level because you go. Let the lavatory floor fully dry and then you should have a fantastic surface to tile onto. Tip: the more work you set into the bottom screed the simpler your tiling will probably be.
13 Amazing Basement Design Ideas HGTV
24 Stunning Ideas For Designing a Contemporary Basement

Step five: Tile floor and walls
Lay your tiles on the ground first and after that grout. Then lay your wall tiles making certain they are level because you lay. Once the bathroom tiles have been cut and laid, grout all of your tiles then buff the tiles clean.
Step six: Install plumbing fitting and fixtures
Install all your plumbing fittings and taps. Also fit your entire towel rails and soap holders. Fit a new bathroom vanity ensuring that it can be level and sealed round the top with silicone and in addition seal around the bathtub. Tip: make sure they come in the right place prior to deciding to drill into your tiles.
Minnesota Basement Design Gallery Finished Basement Company
13 Amazing Basement Design Ideas  HGTV

Step seven: painting, and cleaning - enjoy
Paint your ceiling and perform a final clean making sure everything is fitted correctly understanding that there won't be any leaks inside your plumbing. - Enjoy your bathroom.