Bathroom Renovation - A Step by Step Guide

Bathrooms are probably the smallest rooms in the house and they are generally also one the most expensive for renovate. Bathroom renovation is really a job that, if done well, can also add value with a home as well as a great space brimming with design and light-weight.
120 Custom Luxury Modern Kitchen Designs  Page 13 of 24

Bathroom design
Bathroom design is the first section of a bath room renovation you need to get right. Just replacing the present bathroom with the same design might not be enough. The key to great bathroom design is to design it while using people who will put it to use planned. However make certain that a bath room design also has an overall use factor too.

For example: If you were designing a bath room for families you can still design the toilet with easy accessibility to the shower and bath. This would make certain that the style would recieve treatment for those who have limited mobility. This means if you decide to sell your property or if you are renovating for profit your design includes a wider market appeal. Great bathroom design also uses the space well, taking into consideration the lighting or window space, size fittings, and drainage options. Draw out a plan to scale and all the way down the sizes of your room. Mark the current drainage points and then and water inlet points. Write down a wish report on the lavatory fittings to need and want making use of their sizes. Now marry the 2 together and find out what fits. Note: Most bathroom drainage and water inlet points may be moved but this certainly does come at extra expense.
30 Custom Luxury Kitchen Designs Some $100K Plus

Bathroom remodel
If you decide to perform the work yourself or part of the project it really is time to hire a skip bin and grab that old bathroom. If your home appeared pre 1980 maybe you have fibro bathroom wall linings with asbestos in it and great care will have to be taken. You will need some full body disposable overalls, eye protection, and quality dust mask. Check with your local building authority or council in connection with regulation on bathroom asbestos wall lining removal.
Remove everything except the plumbing. If you keep the toilet plumbing set up you'll not ought to turn water off for the whole house. Also you will likely need to jack hammer the ground tiles up and the sand and cement bed that they're laid on.
Contemporary kitchen with hardwood floors open to dining room  Homedizz

Bathroom Renovation and construction
Bathrooms must be construction properly from your ground-up to ensure that the finished job is correct and true. This also ensures the style and look of the restroom could have an excellent finish
The Bathroom Renovation Process

Install water and drainage pipe and electrical wires.

Install wall lining and ceiling after which install the bathtub hob and bath.

Waterproof the bottom and shower and bath recess.

Correct late the ground with sand and cement ready for tiling.

Lay floor and wall tiles then grout.

Install new bathroom vanity, fittings, and taps - install new electrical.
4 Important Elements for Modern Kitchens Designs  TheyDesign.net  TheyDesign.net


Paint ceiling and final  one - Plumbing and electrical
At now all new plumbing is installed for clean hot and cold water and drainage. Careful attention should be taken when positioning the new plumbing so that the plumbing fittings are correct when the tiling is fully gone. For example: To centre a fitting in the shower recess you must consider the thickness in the wall board, tile glue and tile and so the fitting will be centred following your tiles are in position. The same refers to installing drainage pipes to get a toilet; the wall lining and tile thickness must be considered and so the pipe is incorporated in the correct position once the toilet is installed after tiling. Also rough inside the any new electrical wires without connecting them to the mains power.
25 Luxury Modern Kitchen Designs

Step two - Install wall and ceiling linings
Install your 6mm wall lining being careful to nail the fibro board every 150mm without nailing into the brand new pipes and electrical wires. The best way would be to measure and mark the pipe and wire layout onto your new wall board which has a pencil as you go. Screw up (or nail) the ceiling lining, plasterboard may be the most common. However if you happen to be laying your tiles from floor to ceiling usually do not install the cornice because done after tiling. If you might be not tiling for the ceiling go ahead and install the cornice following the wallboard and ceiling lining are already installed. Also if your bath is just not freestanding anyone can from the frame and install the bath. Ensure the bath is installed correctly allowing for the thickness in the tiles and  sure to evaluate all linings and pipes prior to deciding to continue with a bath room renovation.

30 Custom Luxury Kitchen Designs Some $100K Plus
120 Custom Luxury Modern Kitchen Designs  Page 13 of 24

Step three - Waterproof your bathroom
Waterproof your bathrooms floor, shower recess, and around the tub. When waterproofing the ground make sure that the waterproofing comes 100mm up the walls. The shower recess will have to be waterproofed 100mm across the shower rose outlet. Also the bath needs to be waterproofed 100mm higher than the lip with the bath right around and to the floor. At the doorway use a 25 x 25mm aluminum angle glued into place with quality silicone and waterproof in to the lip. Your whole bathroom should now the tanked, and so the all water will simply decrease a drain. Bathroom waterproofing tip: waterproofing is a simple job but quality and accuracy is most crucial.
Step four - Lay inside cement screed for the floor.

Before the bottom tiles can laid a floor has to be smooth and fairly flat using a slight fall to the drainage outlet. To do this you must use sand and cement mix in fact it is better to give a waterproofing agent into this also. With a level, set the bottom level in the doorway. Use the top aluminum angle because the finished floor level and measure along the thickness in the tile plus 10mm to the glue. Mark about the lavatory with a level after which screed within your sand and cement mix with a 1 to 3 degree fall on the top in the drain outlet. Take your time and get it right with the finished level as smooth as you possibly can. When the sand cement mix has set but is not dry (it is possible to walk onto it but you it's still a bit soft) rub it over having a house brick. This will remove all the small highs and lows and appearance which has a level when you go. Let the bathroom floor fully dry after which you must have an excellent surface to tile onto. Tip: the harder work you place into the floor screed the easier your tiling will likely be.
Contemporary kitchen with hardwood floors open to dining room Homedizz
30 Custom Luxury Kitchen Designs Some $100K Plus

Step five: Tile floor and walls
Lay your tiles on a floor first and after that grout. Then lay your wall tiles making sure that they are level because you lay. Once the bathroom tiles have been cut and laid, grout all your tiles after which buff the tiles clean.
Step six: Install plumbing fitting and fixtures
Install your entire plumbing fittings and taps. Also fit your towel rails and soap holders. Fit a new bathroom vanity ensuring it is level and sealed round the top with silicone plus seal around the tub. Tip: make sure they have been in the right place when you drill to your tiles.
4 Important Elements for Modern Kitchens Designs TheyDesign.net TheyDesign.net
Contemporary kitchen with hardwood floors open to dining room  Homedizz

Step seven: painting, and cleaning - enjoy
Paint your ceiling and do a final clean making certain it is all totally fitted correctly and that there won't be any leaks inside your plumbing. - Enjoy your brand-new bathroom.