Top 70 Best Modern Home Office Design Ideas Contemporary Working Spaces

Modern Home Office Design Modern Home Office Design For Good Ideas About Modern Home Offices Top 70 Best Modern Home Office Design Ideas Contemporary Working Spaces

Bathroom Renovation - A Step by Step Guide

Bathrooms are one of the smallest rooms inside your home and they're also the most expensive to renovate. Bathroom renovation is often a job that, if done well, will add value to your home plus a great space packed with design and light.
Top 70 Best Modern Home Office Design Ideas  Contemporary Working Spaces

Bathroom design
Bathroom design could be the first part of your bathroom renovation you ought to get right. Just replacing the prevailing bathroom with the same design is probably not enough. The key to great bathroom design would be to design it while using people who will certainly use it in your mind. However ensure that your bathroom design boasts a broad use factor as well.

For example: If you were designing your bathrooms for families you could still design the bathroom with comfortable access on the shower and bath. This would ensure that the design would work for people with limited mobility. This means if you choose to sell your house or if you happen to be renovating for profit your design has a wider market appeal. Great bathroom design also uses the room well, considering the sunshine or window space, size of fittings, and drainage options. Draw out a strategy to scale and all the way down the sizes of one's room. Mark the prevailing drainage points then and water inlet points. Write down a wish set of the restroom fittings to need and wish making use of their sizes. Now marry both together and see what fits. Note: Most bathroom drainage and water inlet points may be moved but this does come at extra cost.
Home Office Design Inspiration  California Closets DFW  Contemporary  Home Office  Dallas

Bathroom remodel
If you have chosen to perform the job yourself or part of the work it's time to work with a skip bin and grab the previous bathroom. If your property was developed pre 1980 you might have fibro bathroom wall linings with asbestos inside it and great care should be taken. You will need some full body disposable overalls, eye protection, and quality dust mask. Check with your local building authority or council concerning the regulation on bathroom asbestos wall lining removal.
Remove everything except the plumbing. If you keep the lavatory plumbing in place you do not need to turn the river off for the complete house. Also you will need to jack hammer the ground tiles up as well as the sand and cement bed that they're laid on.
4 Modern and Chic Ideas for Your Home Office  Freshome

Bathroom Renovation and construction
Bathrooms have to be construction properly from your ground-up to make sure that the finished job is correct and true. This also ensures the structure and appearance of the bathroom could have an excellent finish
The Bathroom Renovation Process

Install water and drainage pipe and electrical wires.

Install wall lining and ceiling after which install the tub hob and bath.

Waterproof the floor and shower and bath recess.

Correct late the bottom with sand and cement ready for tiling.

Lay floor and wall tiles then grout.

Install new bathroom vanity, fittings, and taps - install new electrical.
20+ Small Office Designs, Decorating Ideas  Design Trends  Premium PSD, Vector Downloads


Paint ceiling and final  one - Plumbing and electrical
At this point brand new plumbing is installed for clean cold and warm water and drainage. Careful attention has to be taken when positioning the modern plumbing so your plumbing fittings are correct in the event the tiling is finished. For example: To centre a fitting in a shower recess you need to take into account the thickness of the wall board, tile glue and tile therefore the fitting will likely be centred following the tiles are set up. The same pertains to installing drainage pipes for a toilet; the wall lining and tile thickness have to be considered so the pipe is incorporated in the correct position if the toilet is installed after tiling. Also rough in the any new electrical wires without connecting them on the mains power.
17 Best ideas about Corporate Office Decor on Pinterest  Corporate offices, Corporate office

Step two - Install wall and ceiling linings
Install your 6mm wall lining being careful to nail the fibro board every 150mm without nailing into the new pipes and electrical wires. The best way would be to measure and mark the pipe and wire layout on to your new wall board using a pencil as you go. Screw up (or nail) the ceiling lining, plasterboard may be the most common. However if you might be laying your tiles from floor to ceiling usually do not install the cornice because this is best done after tiling. If you might be not tiling on the ceiling go ahead and install the cornice after the wallboard and ceiling lining are actually installed. Also if your bath just isn't freestanding now you can make up the frame and install the bath. Ensure the bathtub is installed correctly making it possible for the thickness in the tiles and  sure to test all linings and pipes when you continue with a bath room renovation.

Home Office Design Inspiration California Closets DFW Contemporary Home Office Dallas
Top 70 Best Modern Home Office Design Ideas  Contemporary Working Spaces

Step three - Waterproof your bathrooms
Waterproof your bathroom floor, shower recess, and around the tub. When waterproofing the bottom ensure that the waterproofing comes 100mm in the walls. The shower recess must be waterproofed 100mm across the shower rose outlet. Also the bathtub ought to be waterproofed 100mm higher than the lip from the bath about and towards the floor. At the doorway install a 25 x 25mm aluminum angle glued into place with quality silicone and waterproof in to the lip. Your whole bathroom should now the tanked, therefore the all water will only drop a drain. Bathroom waterproofing tip: waterproofing is a simple job but quality and accuracy is most crucial.
Step four - Lay within the cement screed for the ground.

Before the ground tiles can laid the bottom must be smooth and fairly flat which has a slight fall for the drainage outlet. To do this you need to use sand and cement mix in fact it is best to include a waterproofing agent into this too. With a level, set the ground level in the doorway. Use the top aluminum angle because the finished floor level and measure along the thickness from the tile plus 10mm for your glue. Mark around the bathroom using a level and after that screed in your sand and cement mix with a 1 to 3 degree fall towards the top from the drain outlet. Take your time and get it right with the finished level as smooth as is possible. When the sand cement mix has set but is not dry (you are able to walk on it however you it is a bit soft) rub it over having a house brick. This will remove each of the small highs and lows and appearance using a level while you go. Let the restroom floor fully dry and after that you really should have an excellent surface to tile onto. Tip: greater work you put into the floor screed the more your tiling will likely be.
4 Modern and Chic Ideas for Your Home Office Freshome
Home Office Design Inspiration  California Closets DFW  Contemporary  Home Office  Dallas

Step five: Tile floor and walls
Lay your tiles on the floor first then grout. Then lay your wall tiles ensuring actually level because you lay. Once the bathroom tiles happen to be cut and laid, grout your tiles and after that buff the tiles clean.
Step six: Install plumbing fitting and fixtures
Install your plumbing fittings and taps. Also fit your entire towel rails and soap holders. Fit your brand-new bathroom vanity making certain it can be level and sealed throughout the top with silicone and also seal around the tub. Tip: make sure they are in the right place before you drill to your tiles.
20+ Small Office Designs, Decorating Ideas Design Trends Premium PSD, Vector Downloads
4 Modern and Chic Ideas for Your Home Office  Freshome

Step seven: painting, and cleaning - enjoy
Paint your ceiling and do a final clean ensuring that things are fitted correctly knowning that there won't be any leaks with your plumbing. - Enjoy your bathroom.

Comments