Bathroom Renovation - A Step by Step Guide

Bathrooms are one of the smallest rooms in the house plus they are also the most expensive for renovate. Bathroom renovation can be a job that, if done well, may add value with a home and a great space brimming with design and light.
Top 60 Best Log Cabin Interior Design Ideas  Mountain Retreat Homes

Bathroom design
Bathroom design will be the first section of your bathrooms renovation you ought to get right. Just replacing the existing bathroom sticking with the same design might not be enough. The key to great bathroom design is usually to design it using the folks that are likely to use it at heart. However make sure that your bathrooms design boasts an overall use factor too.

For example: If you were designing a bathroom for families you may still design the lavatory with easy access towards the shower and bath. This would make sure that the design would recieve treatment if you have limited mobility. This means if you sell your home or if you might be renovating for profit your design includes a wider market appeal. Great bathroom design also uses the room well, taking into consideration the light or window space, height and width of fittings, and drainage options. Draw out an idea to scale and all the way down the sizes of your room. Mark the prevailing drainage points and then and water inlet points. Write down a wish list of the toilet fittings to need and want with their sizes. Now marry the two together and see what fits. Note: Most bathroom drainage and water inlet points could be moved but this may come at extra expense.
Log Cabin Interiors  Houzz

Bathroom remodel
If you have decided to perform the task yourself or part of the project it's time to hire a skip bin and retrieve the existing bathroom. If your house was developed pre 1980 maybe you have fibro bathroom wall linings with asbestos inside it and great care should be taken. You will need some full body disposable overalls, eye protection, and quality dust mask. Check with the local building authority or council concerning the regulation on bathroom asbestos wall lining removal.
Remove everything except the plumbing. If you keep the bathroom plumbing set up you do not ought to turn the water off for the complete house. Also you should jack hammer the ground tiles up along with the sand and cement bed that they're laid on.
Top 60 Best Log Cabin Interior Design Ideas  Mountain Retreat Homes

Bathroom Renovation and construction
Bathrooms should be construction properly from your ground up to make certain that the finished job is correct and true. This also ensures the look and appearance of the toilet could have an excellent finish
The Bathroom Renovation Process

Install water and drainage pipe and electrical wires.

Install wall lining and ceiling after which install the bathtub hob and bath.

Waterproof the bottom and shower and bath recess.

Correct late the ground with sand and cement ready for tiling.

Lay floor and wall tiles and then grout.

Install new bathroom vanity, fittings, and taps - install new electrical.
21 Rustic Log Cabin Interior Design Ideas  Style Motivation


Paint ceiling and final  one - Plumbing and electrical
At now brand new plumbing is installed for clean cold and warm water and drainage. Careful attention needs to be taken when positioning the new plumbing so your plumbing fittings are correct when the tiling ends. For example: To centre a fitting inside a shower recess you need to think about the thickness in the wall board, tile glue and tile therefore the fitting will probably be centred following the tiles are set up. The same applies to installing drainage pipes for the toilet; the wall lining and tile thickness should be taken into account and so the pipe is incorporated in the correct position when the toilet is installed after tiling. Also rough within the any new electrical wires without connecting them for the mains power.
Log Cabin Interior Design.An Extraordinary Rustic Retreat!

Step two - Install wall and ceiling linings
Install your 6mm wall lining fostering to nail the fibro board every 150mm without nailing into the new pipes and electrical wires. The best way is usually to measure and mark the pipe and wire layout on your new wall board using a pencil because you go. Screw up (or nail) the ceiling lining, plasterboard could be the most common. However if you happen to be laying your tiles from floor to ceiling tend not to install the cornice as this is best done after tiling. If you're not tiling to the ceiling just install the cornice after the wallboard and ceiling lining are already installed. Also if your bath is not freestanding you can now make up the frame and install the bathtub. Ensure the bath is installed correctly permitting the thickness from the tiles and  sure to test all linings and pipes when you continue with your bathrooms renovation.

Log Cabin Interiors Houzz
Top 60 Best Log Cabin Interior Design Ideas  Mountain Retreat Homes

Step three - Waterproof a bath room
Waterproof your bathroom floor, shower recess, and around the bath. When waterproofing the floor make certain that the waterproofing comes 100mm the walls. The shower recess should be waterproofed 100mm higher than the shower rose outlet. Also the tub needs to be waterproofed 100mm across the lip from the bath around and towards the floor. At the doorway use a 25 x 25mm aluminum angle glued into place with quality silicone and waterproof in to the lip. Your whole bathroom should now the tanked, so the all water will only go down a drain. Bathroom waterproofing tip: waterproofing is a simple job but quality and accuracy is most critical.
Step four - Lay inside the cement screed for a floor.

Before a floor tiles can laid the ground have to be smooth and fairly flat which has a slight fall towards the drainage outlet. To do this you must use sand and cement mix which is better to give a waterproofing agent into this also. With a level, set a floor level at the doorway. Use the top aluminum angle because the finished floor level and measure down the thickness with the tile plus 10mm for the glue. Mark right around the restroom with a level then screed within your sand and cement mix using a 1 to 3 degree fall on the top of the drain outlet. Take your time and obtain it right while using finished level as smooth as possible. When the sand cement mix has set but is not dry (you can walk about it nevertheless, you it's still a bit soft) rub it over with a house brick. This will remove every one of the small highs and lows and check having a level as you go. Let the toilet floor fully dry and after that you needs to have a great surface to tile onto. Tip: greater work you put into the bottom screed the simpler your tiling is going to be.
Top 60 Best Log Cabin Interior Design Ideas Mountain Retreat Homes
Log Cabin Interiors  Houzz

Step five: Tile floor and walls
Lay your tiles on a floor first then grout. Then lay your wall tiles making certain actually level when you lay. Once the restroom tiles happen to be cut and laid, grout your entire tiles then buff the tiles clean.
Step six: Install plumbing fitting and fixtures
Install all your plumbing fittings and taps. Also fit all your towel rails and soap holders. Fit your bathroom vanity ensuring that it is level and sealed around the top with silicone plus seal around the tub. Tip: make sure they will be in the right place prior to deciding to drill into your tiles.
21 Rustic Log Cabin Interior Design Ideas Style Motivation
Top 60 Best Log Cabin Interior Design Ideas  Mountain Retreat Homes

Step seven: painting, and cleaning - enjoy
Paint your ceiling and execute a final clean ensuring that things are all fitted correctly and that there aren't any leaks inside your plumbing. - Enjoy your new bathroom.