Spectacular ensuite bathroom designs and decoration ideas

Ensuite Bathroom Designs Spectacular ensuite bathroom designs and decoration ideas

Bathroom Renovation - A Step by Step Guide

Bathrooms are among the smallest rooms at home and they are also the most costly to renovate. Bathroom renovation can be a job that, if done well, will add value with a home along with a great space brimming with design and light-weight.
Spectacular ensuite bathroom designs and decoration ideas

Bathroom design
Bathroom design could be the first area of your bathroom renovation you need right. Just replacing the existing bathroom with the exact same design may not be enough. The key to great bathroom design is to design it while using people that will apply it planned. However ensure that your bathroom design even offers a broad use factor too.

For example: If you were designing your bathrooms for families you might still design the bathroom with easy accessibility on the shower and bath. This would make certain that the style would work for those who have limited mobility. This means if you sell your house or if you might be renovating for profit your design features a wider market appeal. Great bathroom design also uses the room well, looking at the sunlight or window space, size of fittings, and drainage options. Draw out an idea to scale and down the sizes of one's room. Mark the prevailing drainage points after which and water inlet points. Write down a wish report on the toilet fittings to wish and desire making use of their sizes. Now marry both the together and see what fits. Note: Most bathroom drainage and water inlet points might be moved but this certainly does come at extra cost.
Spectacular ensuite bathroom designs and decoration ideas

Bathroom remodel
If you've decided to perform the job yourself or part of the task it's time to work with a skip bin and take out the previous bathroom. If your home appeared pre 1980 you may have fibro bathroom wall linings with asbestos inside and great care must be taken. You will need some full body disposable overalls, eye protection, and quality dust mask. Check with your local building authority or council in connection with regulation on bathroom asbestos wall lining removal.
Remove everything except the plumbing. If you keep the lavatory plumbing in position you will not ought to turn the lake off for the entire house. Also you will likely need to jack hammer a floor tiles up as well as the sand and cement bed they are laid on.
Minosa: Sensory Interior Delight by Minosa

Bathroom Renovation and construction
Bathrooms has to be construction properly from the start to ensure that the finished job is correct and true. This also ensures the look and appearance of the bathroom may have a great finish
The Bathroom Renovation Process

Install water and drainage pipe and electrical wires.

Install wall lining and ceiling after which install the tub hob and bath.

Waterproof the ground and shower and bath recess.

Correct the fall of the floor with sand and cement ready for tiling.

Lay floor and wall tiles then grout.

Install new bathroom vanity, fittings, and taps - install new electrical.
What is different when designing an ensuite bathroom?


Paint ceiling and final  one - Plumbing and electrical
At now new plumbing is installed for clean cold and hot water and drainage. Careful attention needs to be taken when positioning the newest plumbing so that the plumbing fittings are correct once the tiling is completed. For example: To centre a fitting in a very shower recess you should consider the thickness with the wall board, tile glue and tile so the fitting will likely be centred following the tiles are in position. The same applies to installing drainage pipes for a toilet; the wall lining and tile thickness must be looked at so the pipe influences correct position once the toilet is installed after tiling. Also rough within the any new electrical wires without connecting them towards the mains power.
Ensuite bathroom ideas  VictoriaPlum.com

Step two - Install wall and ceiling linings
Install your 6mm wall lining the constant maintenance to nail the fibro board every 150mm without nailing into the modern pipes and electrical wires. The best way is always to measure and mark the pipe and wire layout onto your new wall board with a pencil while you go. Screw up (or nail) the ceiling lining, plasterboard will be the most common. However if you happen to be laying your tiles from floor to ceiling do not install the cornice because this is most effectively achieved after tiling. If you happen to be not tiling for the ceiling proceed to install the cornice following the wallboard and ceiling lining happen to be installed. Also if your bath is just not freestanding anyone can from the frame and install the bathtub. Ensure the bath is installed correctly making it possible for the thickness of the tiles and  sure to check all linings and pipes prior to deciding to continue with your bathroom renovation.

Spectacular ensuite bathroom designs and decoration ideas
Spectacular ensuite bathroom designs and decoration ideas

Step three - Waterproof your bathrooms
Waterproof your bathroom floor, shower recess, and around the bathtub. When waterproofing the bottom ensure that the waterproofing comes 100mm up the walls. The shower recess must be waterproofed 100mm above the shower rose outlet. Also the tub must be waterproofed 100mm higher than the lip of the bath right around and towards the floor. At the doorway put in a 25 x 25mm aluminum angle glued into place with quality silicone and waterproof in to the lip. Your whole bathroom should now the tanked, therefore the all water is only going to go down a drain. Bathroom waterproofing tip: waterproofing is an easy job but quality and accuracy is most significant.
Step four - Lay inside cement screed for a floor.

Before the bottom tiles can laid a floor has to be smooth and fairly flat having a slight fall on the drainage outlet. To do this you must use sand and cement mix and it is advisable to put in a waterproofing agent into this as well. With a level, set the bottom level with the doorway. Use the top aluminum angle because the finished floor level and measure around the thickness with the tile plus 10mm for your glue. Mark about the lavatory with a level and then screed with your sand and cement mix having a 1 to 3 degree fall on the top of the drain outlet. Take your time and get it right with the finished level as smooth as you possibly can. When the sand cement mix has set but isn't dry (it is possible to walk into it however, you will still be a little soft) rub it over using a house brick. This will remove each of the small highs and lows and appearance with a level while you go. Let the lavatory floor fully dry and then you should have a fantastic surface to tile onto. Tip: the harder work you add into the bottom screed the easier your tiling is going to be.
Minosa: Sensory Interior Delight by Minosa
Spectacular ensuite bathroom designs and decoration ideas

Step five: Tile floor and walls
Lay your tiles on the ground first after which grout. Then lay your wall tiles making sure they are level because you lay. Once the restroom tiles are actually cut and laid, grout your tiles after which buff the tiles clean.
Step six: Install plumbing fitting and fixtures
Install your entire plumbing fittings and taps. Also fit all of your towel rails and soap holders. Fit your bathroom vanity ensuring that it can be level and sealed round the top with silicone and also seal around the tub. Tip: make sure they are in the right place prior to deciding to drill to your tiles.
What is different when designing an ensuite bathroom?
Minosa: Sensory Interior Delight by Minosa

Step seven: painting, and cleaning - enjoy
Paint your ceiling and do a final clean ensuring that everything is fitted correctly understanding that there isn't any leaks with your plumbing. - Enjoy a new bathroom.

Comments