Bathroom Renovation - A Step by Step Guide

Bathrooms are some of the smallest rooms at home and they're also the most costly to renovate. Bathroom renovation is really a job that, if done well, can add value to a home as well as a great space full of design and light-weight.
Smart Home Design from Modern Homes Design  InspirationSeek.com

Bathroom design
Bathroom design is the first division of a bath room renovation you should get right. Just replacing the present bathroom with the same design may not be enough. The key to great bathroom design is to design it with the folks that will utilize it planned. However make certain that your bathrooms design also offers a broad use factor at the same time.

For example: If you were designing a bath room for families you can still design the restroom with quick access towards the shower and bath. This would ensure that the structure would recieve treatment for people with limited mobility. This means if you sell your property or if you're renovating for profit your design has a wider market appeal. Great bathroom design also uses the space well, considering the lighting or window space, size fittings, and drainage options. Draw out a plan to scale and all the way down the sizes of your respective room. Mark the current drainage points after which and water inlet points. Write down a wish set of the restroom fittings to wish and want using their sizes. Now marry the two together and see what fits. Note: Most bathroom drainage and water inlet points may be moved but this may come at extra cost.
Interior Design Ideas  Whole House Makeover  YouTube

Bathroom remodel
If you decide to complete the project yourself or part of the job it really is time to employ a skip bin and grab the old bathroom. If your own home appeared pre 1980 maybe you have fibro bathroom wall linings with asbestos within it and great care must be taken. You will need some full body disposable overalls, eye protection, and quality dust mask. Check with any local building authority or council in connection with regulation on bathroom asbestos wall lining removal.
Remove everything except the plumbing. If you keep the toilet plumbing in place you do not need to turn the water off for your house. Also you should jack hammer a floor tiles up and the sand and cement bed actually laid on.
Home Design Ideas with Cape Cod Interior Design  MidCityEast

Bathroom Renovation and construction
Bathrooms have to be construction properly from your ground-up to be sure that the finished job is correct and true. This also ensures the look and appear of the restroom can have an incredible finish
The Bathroom Renovation Process

Install water and drainage pipe and electrical wires.

Install wall lining and ceiling then install the bathtub hob and bath.

Waterproof the bottom and shower and bath recess.

Correct the fall of the ground with sand and cement ready for tiling.

Lay floor and wall tiles then grout.

Install new bathroom vanity, fittings, and taps - install new electrical.
An Old Farmhouse Because A Modern Gem  Decoholic


Paint ceiling and final  one - Plumbing and electrical
At this point brand new plumbing is installed for clean hot and cold water and drainage. Careful attention has to be taken when positioning the new plumbing in order that the plumbing fittings are correct if the tiling is finished. For example: To centre a fitting in the shower recess you must take into consideration the thickness with the wall board, tile glue and tile therefore the fitting is going to be centred following the tiles are in place. The same pertains to installing drainage pipes for a toilet; the wall lining and tile thickness should be looked at so the pipe is within the correct position once the toilet is installed after tiling. Also rough within the any new electrical wires without connecting them towards the mains power.
Quattro Homes  New Homes  Renovations  Extensions

Step two - Install wall and ceiling linings
Install your 6mm wall lining the constant maintenance to nail the fibro board every 150mm without nailing into the modern pipes and electrical wires. The best way is to measure and mark the pipe and wire layout on to your new wall board having a pencil when you go. Screw up (or nail) the ceiling lining, plasterboard is the most common. However if you happen to be laying your tiles from floor to ceiling don't install the cornice as this is done after tiling. If you happen to be not tiling to the ceiling go ahead and install the cornice as soon as the wallboard and ceiling lining have been installed. Also if your bath is not freestanding you can now make up the frame and install the tub. Ensure the tub is installed correctly making it possible for the thickness in the tiles and  sure to check all linings and pipes before you decide to continue with your bathrooms renovation.

Interior Design Ideas Whole House Makeover YouTube
Smart Home Design from Modern Homes Design  InspirationSeek.com

Step three - Waterproof your bathrooms
Waterproof your bathrooms floor, shower recess, and around the bathtub. When waterproofing the bottom be sure that the waterproofing comes 100mm in the walls. The shower recess should be waterproofed 100mm across the shower rose outlet. Also the bath ought to be waterproofed 100mm higher than the lip from the bath about and to the floor. At the doorway install a 25 x 25mm aluminum angle glued into place with quality silicone and waterproof in to the lip. Your whole bathroom should now the tanked, and so the all water will only go down a drain. Bathroom waterproofing tip: waterproofing is a simple job but quality and accuracy is most critical.
Step four - Lay within the cement screed for the bottom.

Before the floor tiles can laid the floor has to be smooth and fairly flat having a slight fall towards the drainage outlet. To do this you must use sand and cement mix which is far better to add a waterproofing agent into this also. With a level, set a floor level at the doorway. Use the top aluminum angle since the finished floor level and measure along the thickness in the tile plus 10mm to the glue. Mark around the bathroom which has a level after which screed within your sand and cement mix with a 1 to 3 degree fall towards the top with the drain outlet. Take your time and acquire it right with the finished level as smooth as you can. When the sand cement mix has set but isn't dry (you can walk into it but you it is still somewhat soft) rub it over with a house brick. This will remove every one of the small highs and lows and appearance using a level because you go. Let the toilet floor fully dry and then you must have an incredible surface to tile onto. Tip: the greater work you put into a floor screed the more your tiling will likely be.
Home Design Ideas with Cape Cod Interior Design MidCityEast
Interior Design Ideas  Whole House Makeover  YouTube

Step five: Tile floor and walls
Lay your tiles on a floor first after which grout. Then lay your wall tiles ensuring actually level when you lay. Once the bathroom tiles happen to be cut and laid, grout your entire tiles after which buff the tiles clean.
Step six: Install plumbing fitting and fixtures
Install all of your plumbing fittings and taps. Also fit your entire towel rails and soap holders. Fit your brand-new bathroom vanity ensuring it can be level and sealed around the top with silicone plus seal around the bathtub. Tip: make sure they will be in the right place before you decide to drill into the tiles.
An Old Farmhouse Because A Modern Gem Decoholic
Home Design Ideas with Cape Cod Interior Design  MidCityEast

Step seven: painting, and cleaning - enjoy
Paint your ceiling and execute a final clean ensuring that things are all fitted correctly which there won't be any leaks in your plumbing. - Enjoy your new bathroom.