Bathroom Renovation - A Step by Step Guide

Bathrooms are probably the smallest rooms in the home and they are generally also the most costly to renovate. Bathroom renovation can be a job that, if done well, can add value with a home as well as a great space brimming with design and light.
Sloping Garden Design Ideas  YouTube

Bathroom design
Bathroom design is the first area of your bathrooms renovation you ought to get right. Just replacing the prevailing bathroom with the same design will not be enough. The key to great bathroom design is always to design it using the people that will certainly use it planned. However make sure that your bathrooms design also has an overall use factor also.

For example: If you were designing your bathroom for families you can still design the bathroom with easy access on the shower and bath. This would make sure that the look would work for people with limited mobility. This means if you opt to sell your own home or if you might be renovating for profit your design has a wider market appeal. Great bathroom design also uses space well, looking at the sunshine or window space, size of fittings, and drainage options. Draw out an agenda to scale and all the way down the sizes of your respective room. Mark the existing drainage points after which and water inlet points. Write down a wish set of the toilet fittings to want and need making use of their sizes. Now marry the 2 together and discover what fits. Note: Most bathroom drainage and water inlet points might be moved but this may come at expense.
Modern Backyard Landscape Home Design Ideas, Pictures, Remodel and Decor

Bathroom remodel
If you decide to perform the task yourself or part of the task it is time to engage a skip bin and pull out the existing bathroom. If your house was made pre 1980 you might have fibro bathroom wall linings with asbestos inside it and great care will have to be taken. You will need some full body disposable overalls, eye protection, and quality dust mask. Check with your neighborhood building authority or council in connection with regulation on bathroom asbestos wall lining removal.
Remove everything except the plumbing. If you keep the lavatory plumbing available you won't have to turn the water off for the complete house. Also you will need to jack hammer the bottom tiles up as well as the sand and cement bed actually laid on.
81 Landscaping Ideas  Backyard  Front Yard Landscape Design  YouTube

Bathroom Renovation and construction
Bathrooms have to be construction properly through the ground up to make certain that the finished job is correct and true. This also ensures the structure and appear of the restroom will have a fantastic finish
The Bathroom Renovation Process

Install water and drainage pipe and electrical wires.

Install wall lining and ceiling and after that install the bathtub hob and bath.

Waterproof the ground and shower and bath recess.

Correct december the ground with sand and cement ready for tiling.

Lay floor and wall tiles and then grout.

Install new bathroom vanity, fittings, and taps - install new electrical.
14 Outstanding Landscaping Ideas For Your Dream Backyard


Paint ceiling and final  one - Plumbing and electrical
At now brand new plumbing is installed for clean cold and hot water and drainage. Careful attention should be taken when positioning the newest plumbing so your plumbing fittings are correct in the event the tiling is finished. For example: To centre a fitting inside a shower recess you must take into consideration the thickness with the wall board, tile glue and tile so the fitting will probably be centred following the tiles are set up. The same applies to installing drainage pipes to get a toilet; the wall lining and tile thickness have to be looked at and so the pipe is within the correct position in the event the toilet is installed after tiling. Also rough inside any new electrical wires without connecting them on the mains power.
29 Cool Backyard Design Ideas  Shelterness

Step two - Install wall and ceiling linings
Install your 6mm wall lining the constant maintenance to nail the fibro board every 150mm without nailing into the newest pipes and electrical wires. The best way would be to measure and mark the pipe and wire layout on your new wall board using a pencil because you go. Screw up (or nail) the ceiling lining, plasterboard could be the most common. However if you are laying your tiles from floor to ceiling usually do not install the cornice because this is most effectively achieved after tiling. If you happen to be not tiling for the ceiling proceed to install the cornice as soon as the wallboard and ceiling lining happen to be installed. Also if your bath just isn't freestanding you can now from the frame and install the tub. Ensure the bathtub is installed correctly allowing for the thickness of the tiles and  sure to evaluate all linings and pipes when you continue with your bathroom renovation.

Modern Backyard Landscape Home Design Ideas, Pictures, Remodel and Decor
Sloping Garden Design Ideas  YouTube

Step three - Waterproof your bathroom
Waterproof a bath room floor, shower recess, and around the bath. When waterproofing the floor ensure that the waterproofing comes 100mm up the walls. The shower recess will need to be waterproofed 100mm across the shower rose outlet. Also the bathtub must be waterproofed 100mm over the lip of the bath around and to the floor. At the doorway purchase a 25 x 25mm aluminum angle glued into place with quality silicone and waterproof into the lip. Your whole bathroom should now the tanked, and so the all water is only going to go down a drain. Bathroom waterproofing tip: waterproofing is an easy job but quality and accuracy is most important.
Step four - Lay inside cement screed for the ground.

Before the floor tiles can laid the ground have to be smooth and fairly flat having a slight fall on the drainage outlet. To do this you need to use sand and cement mix and it is advisable to give a waterproofing agent into this as well. With a level, set the floor level on the doorway. Use the top aluminum angle because the finished floor level and measure around the thickness in the tile plus 10mm for the glue. Mark around the bathroom using a level and then screed in your sand and cement mix which has a 1 to 3 degree fall on the top of the drain outlet. Take your time and acquire it right while using finished level as smooth as possible. When the sand cement mix has set but is just not dry (you can walk onto it however, you it is a bit soft) rub it over with a house brick. This will remove all the small highs and lows and check which has a level while you go. Let the toilet floor fully dry after which you needs to have a great surface to tile onto. Tip: the greater work you set into the bottom screed the simpler your tiling will probably be.
81 Landscaping Ideas Backyard Front Yard Landscape Design YouTube
Modern Backyard Landscape Home Design Ideas, Pictures, Remodel and Decor

Step five: Tile floor and walls
Lay your tiles on the floor first and then grout. Then lay your wall tiles making certain actually level as you lay. Once the restroom tiles are already cut and laid, grout your entire tiles after which buff the tiles clean.
Step six: Install plumbing fitting and fixtures
Install all of your plumbing fittings and taps. Also fit all of your towel rails and soap holders. Fit your brand-new bathroom vanity making sure it really is level and sealed throughout the top with silicone plus seal around the bath. Tip: make sure they are in the right place prior to deciding to drill in your tiles.
14 Outstanding Landscaping Ideas For Your Dream Backyard
81 Landscaping Ideas  Backyard  Front Yard Landscape Design  YouTube

Step seven: painting, and cleaning - enjoy
Paint your ceiling and perform final clean ensuring things are all fitted correctly which there aren't any leaks within your plumbing. - Enjoy your bathroom.