Personalizing Boys Bedrooms with Decorating Themes, 22 Boy Bedroom Ideas

Boy Bedroom Designs Ideas For Decorating A Boys Bedroom Awesome Design Cf Boys Room Personalizing Boys Bedrooms with Decorating Themes, 22 Boy Bedroom Ideas

Bathroom Renovation - A Step by Step Guide

Bathrooms are one of the smallest rooms in the house plus they are also certainly the most expensive to renovate. Bathroom renovation is really a job that, if done well, may add value with a home plus a great space full of design and light-weight.
Personalizing Boys Bedrooms with Decorating Themes, 22 Boy Bedroom Ideas

Bathroom design
Bathroom design will be the first section of your bathrooms renovation you should get right. Just replacing the current bathroom with the exact same design might not be enough. The key to great bathroom design would be to design it with all the folks that will certainly apply it at heart. However be sure that a bath room design also has an over-all use factor as well.

For example: If you were designing your bathroom for families you can still design the restroom with comfortable access to the shower and bath. This would be sure that the design would work if you have limited mobility. This means if you opt to sell your home or if you might be renovating for profit your design carries a wider market appeal. Great bathroom design also uses the space well, considering the lighting or window space, size fittings, and drainage options. Draw out an agenda to scale and all the way down the sizes of one's room. Mark the prevailing drainage points and then and water inlet points. Write down a wish list of the lavatory fittings to wish and want making use of their sizes. Now marry the two together and see what fits. Note: Most bathroom drainage and water inlet points may be moved but this will come at expense.
30 Awesome Teenage Boy Bedroom Ideas DesignBump

Bathroom remodel
If you've decided to do the task yourself or part of the work it is time to employ a skip bin and retrieve that old bathroom. If your house is made pre 1980 maybe you have fibro bathroom wall linings with asbestos within it and great care will need to be taken. You will need some full body disposable overalls, eye protection, and quality dust mask. Check with any local building authority or council in connection with regulation on bathroom asbestos wall lining removal.
Remove everything except the plumbing. If you keep the restroom plumbing in position you do not ought to turn the lake off for the complete house. Also you will have to jack hammer the floor tiles up as well as the sand and cement bed actually laid on.
20 Awesome Boys Bedroom Ideas

Bathroom Renovation and construction
Bathrooms has to be construction properly from your ground-up to make certain that the finished job is correct and true. This also ensures the style and look of the bathroom could have an incredible finish
The Bathroom Renovation Process

Install water and drainage pipe and electrical wires.

Install wall lining and ceiling then install the tub hob and bath.

Waterproof the ground and shower and bath recess.

Correct nov the bottom with sand and cement ready for tiling.

Lay floor and wall tiles then grout.

Install new bathroom vanity, fittings, and taps - install new electrical.
Classic Boys Room  12 Amazing Kids Bedrooms  Childrens Bedroom Ideas  Inspirations  Cool


Paint ceiling and final  one - Plumbing and electrical
At this aspect new plumbing is installed for clean hot and cold water and drainage. Careful attention must be taken when positioning the brand new plumbing so that the plumbing fittings are correct if the tiling is completed. For example: To centre a fitting in a shower recess you have to think about the thickness with the wall board, tile glue and tile so the fitting will probably be centred following your tiles are in position. The same relates to installing drainage pipes for any toilet; the wall lining and tile thickness should be taken into account therefore the pipe is within the correct position once the toilet is installed after tiling. Also rough in the any new electrical wires without connecting them for the mains power.
The 25+ best Boy bedrooms ideas on Pinterest  Boys room ideas, Kids bedroom boys and Boys room

Step two - Install wall and ceiling linings
Install your 6mm wall lining fostering to nail the fibro board every 150mm without nailing into the new pipes and electrical wires. The best way is to measure and mark the pipe and wire layout onto your new wall board which has a pencil when you go. Screw up (or nail) the ceiling lining, plasterboard could be the most common. However if you might be laying your tiles from floor to ceiling do not install the cornice as this is best done after tiling. If you might be not tiling on the ceiling proceed to install the cornice following your wallboard and ceiling lining are actually installed. Also if your bath isn't freestanding anyone can from the frame and install the bath. Ensure the tub is installed correctly enabling the thickness from the tiles and  sure to test all linings and pipes before you continue with your bathroom renovation.

30 Awesome Teenage Boy Bedroom Ideas DesignBump
Personalizing Boys Bedrooms with Decorating Themes, 22 Boy Bedroom Ideas

Step three - Waterproof a bath room
Waterproof your bathroom floor, shower recess, and around the tub. When waterproofing the floor make certain that the waterproofing comes 100mm inside the walls. The shower recess will have to be waterproofed 100mm higher than the shower rose outlet. Also the tub must be waterproofed 100mm over the lip in the bath around and towards the floor. At the doorway put in a 25 x 25mm aluminum angle glued into place with quality silicone and waterproof to the lip. Your whole bathroom should now the tanked, so the all water is only going to go down a drain. Bathroom waterproofing tip: waterproofing is an easy job but quality and accuracy is most significant.
Step four - Lay inside cement screed for the bottom.

Before the ground tiles can laid a floor must be smooth and fairly flat using a slight fall to the drainage outlet. To do this you need to use sand and cement mix which is advisable to include a waterproofing agent into this also. With a level, set the bottom level in the doorway. Use the top aluminum angle as the finished floor level and measure along the thickness in the tile plus 10mm for your glue. Mark right around the bathroom using a level and after that screed within your sand and cement mix having a 1 to 3 degree fall for the top from the drain outlet. Take your time and have it right with all the finished level as smooth as possible. When the sand cement mix has set but is not dry (you can walk on it however you it's still a bit soft) rub it over using a house brick. This will remove all the small highs and lows and check with a level as you go. Let the bathroom floor fully dry and after that you really should have a great surface to tile onto. Tip: the more work you place into the bottom screed the easier your tiling will be.
20 Awesome Boys Bedroom Ideas
30 Awesome Teenage Boy Bedroom Ideas DesignBump

Step five: Tile floor and walls
Lay your tiles on the bottom first and then grout. Then lay your wall tiles making sure that they're level when you lay. Once the restroom tiles are actually cut and laid, grout all of your tiles after which buff the tiles clean.
Step six: Install plumbing fitting and fixtures
Install your entire plumbing fittings and taps. Also fit your towel rails and soap holders. Fit your new bathroom vanity ensuring that it's level and sealed around the top with silicone as well as seal around the bath. Tip: make sure they come in the right place when you drill into your tiles.
Classic Boys Room 12 Amazing Kids Bedrooms Childrens Bedroom Ideas Inspirations Cool
20 Awesome Boys Bedroom Ideas

Step seven: painting, and cleaning - enjoy
Paint your ceiling and perform a final clean ensuring it is all totally fitted correctly which there isn't any leaks inside your plumbing. - Enjoy your bathroom.

Comments