New Zara Home Spring Summer 2015 Collection Decoholic

Designs For Wardrobes In Bedrooms 7 Creative Ways To Design Your Bedroom Wardrobe | Home & Decor Singapore New Zara Home Spring Summer 2015 Collection Decoholic

Bathroom Renovation - A Step by Step Guide

Bathrooms are some of the smallest rooms at home and they are generally also the most expensive for renovate. Bathroom renovation is often a job that, if done well, can add value to your home plus a great space full of design and lightweight.
New Zara Home Spring  Summer 2015 Collection  Decoholic

Bathroom design
Bathroom design will be the first division of your bathroom renovation you should get right. Just replacing the existing bathroom sticking with the same design is probably not enough. The key to great bathroom design is to design it using the people that are going to put it to use planned. However be sure that your bathroom design boasts a general use factor also.

For example: If you were designing a bath room for families you might still design the bathroom with quick access towards the shower and bath. This would make sure that the style would work for people with limited mobility. This means if you opt to sell your home or if you happen to be renovating for profit your design features a wider market appeal. Great bathroom design also uses the area well, looking at the sunlight or window space, sized fittings, and drainage options. Draw out a plan to scale and right down the sizes of your room. Mark the existing drainage points and after that and water inlet points. Write down a wish report on the restroom fittings to need and want using sizes. Now marry both the together and find out what fits. Note: Most bathroom drainage and water inlet points may be moved but this does come at extra cost.
T.C. Steele Boyhood Home  Wikipedia

Bathroom remodel
If you have decided to complete the work yourself or part of the job it can be time to hire a skip bin and grab the old bathroom. If your own home appeared pre 1980 you might have fibro bathroom wall linings with asbestos within it and great care must be taken. You will need some full body disposable overalls, eye protection, and quality dust mask. Check with any local building authority or council about the regulation on bathroom asbestos wall lining removal.
Remove everything except the plumbing. If you keep the toilet plumbing set up you will not must turn the water off for your house. Also you will likely need to jack hammer the ground tiles up and also the sand and cement bed that they are laid on.
At home with David Gandy: A glimpse at his London home  The English Home

Bathroom Renovation and construction
Bathrooms have to be construction properly from the start to be sure that the finished job is correct and true. This also ensures the look and search of the bathroom could have an excellent finish
The Bathroom Renovation Process

Install water and drainage pipe and electrical wires.

Install wall lining and ceiling and then install the bath hob and bath.

Waterproof the bottom and shower and bath recess.

Correct late the floor with sand and cement ready for tiling.

Lay floor and wall tiles and then grout.

Install new bathroom vanity, fittings, and taps - install new electrical.
Handsome Rooms with a Masculine Vibe  Traditional Home


Paint ceiling and final  one - Plumbing and electrical
At this aspect new plumbing is installed for clean cold and warm water and drainage. Careful attention has to be taken when positioning the modern plumbing so your plumbing fittings are correct in the event the tiling ends. For example: To centre a fitting in a very shower recess you have to take into consideration the thickness from the wall board, tile glue and tile therefore the fitting is going to be centred following your tiles are available. The same applies to installing drainage pipes for a toilet; the wall lining and tile thickness should be looked at hence the pipe is incorporated in the correct position if the toilet is installed after tiling. Also rough in the any new electrical wires without connecting them towards the mains power.
Modern Adobe Home  Lamar Valley Craftsman

Step two - Install wall and ceiling linings
Install your 6mm wall lining fostering to nail the fibro board every 150mm without nailing into the brand new pipes and electrical wires. The best way is always to measure and mark the pipe and wire layout on your new wall board using a pencil while you go. Screw up (or nail) the ceiling lining, plasterboard is the most common. However if you might be laying your tiles from floor to ceiling tend not to install the cornice as this is most effectively achieved after tiling. If you're not tiling for the ceiling go ahead and install the cornice following the wallboard and ceiling lining are actually installed. Also if your bath is just not freestanding now you can from the frame and install the bathtub. Ensure the bathtub is installed correctly enabling the thickness with the tiles and  sure to check all linings and pipes prior to deciding to continue with your bathroom renovation.

T.C. Steele Boyhood Home Wikipedia
New Zara Home Spring  Summer 2015 Collection  Decoholic

Step three - Waterproof your bathrooms
Waterproof a bath room floor, shower recess, and around the tub. When waterproofing the bottom make certain that the waterproofing comes 100mm in the walls. The shower recess will have to be waterproofed 100mm above the shower rose outlet. Also the bathtub ought to be waterproofed 100mm across the lip with the bath around and for the floor. At the doorway use a 25 x 25mm aluminum angle glued into place with quality silicone and waterproof in the lip. Your whole bathroom should now the tanked, so the all water is only going to decrease a drain. Bathroom waterproofing tip: waterproofing is a simple job but quality and accuracy is most crucial.
Step four - Lay within the cement screed for a floor.

Before the bottom tiles can laid the ground has to be smooth and fairly flat having a slight fall to the drainage outlet. To do this you need to use sand and cement mix and it's also advisable to include a waterproofing agent into this at the same time. With a level, set the ground level in the doorway. Use the top aluminum angle because finished floor level and measure along the thickness of the tile plus 10mm to the glue. Mark right around the bathroom with a level and after that screed within your sand and cement mix which has a 1 to 3 degree fall to the top of the drain outlet. Take your time and obtain it right with the finished level as smooth as possible. When the sand cement mix has set but is just not dry (you'll be able to walk into it but you it's still somewhat soft) rub it over having a house brick. This will remove all the small highs and lows and check which has a level because you go. Let the toilet floor fully dry after which you needs to have a great surface to tile onto. Tip: greater work you place into a floor screed the more your tiling is going to be.
At home with David Gandy: A glimpse at his London home The English Home
T.C. Steele Boyhood Home  Wikipedia

Step five: Tile floor and walls
Lay your tiles on a floor first and then grout. Then lay your wall tiles making sure that they are level while you lay. Once the bathroom tiles happen to be cut and laid, grout all of your tiles after which buff the tiles clean.
Step six: Install plumbing fitting and fixtures
Install all your plumbing fittings and taps. Also fit all of your towel rails and soap holders. Fit a new bathroom vanity making sure it can be level and sealed around the top with silicone and also seal around the bathtub. Tip: make sure they have been in the right place before you decide to drill into your tiles.
Handsome Rooms with a Masculine Vibe Traditional Home
At home with David Gandy: A glimpse at his London home  The English Home

Step seven: painting, and cleaning - enjoy
Paint your ceiling and perform final clean ensuring that things are all fitted correctly knowning that there are no leaks inside your plumbing. - Enjoy your new bathroom.

Comments