Bathroom Renovation - A Step by Step Guide

Bathrooms are among the smallest rooms in the house and they are generally also certainly the most costly to renovate. Bathroom renovation is really a job that, if done well, will add value to your home as well as a great space brimming with design and lightweight.
Montainer makes shipping container architecture easy  TreeHugger

Bathroom design
Bathroom design will be the first area of your bathrooms renovation you ought to get right. Just replacing the existing bathroom with similar design is probably not enough. The key to great bathroom design is usually to design it with the folks that will certainly apply it at heart. However ensure that a bath room design also offers an overall use factor too.

For example: If you were designing a bathroom for families you might still design the lavatory with easy accessibility to the shower and bath. This would make certain that the design would work if you have limited mobility. This means if you sell your home or if you are renovating for profit your design features a wider market appeal. Great bathroom design also uses the space well, looking at the sunshine or window space, sized fittings, and drainage options. Draw out a plan to scale and all the way down the sizes of one's room. Mark the present drainage points after which and water inlet points. Write down a wish listing of the restroom fittings to wish and wish using sizes. Now marry the two together and discover what fits. Note: Most bathroom drainage and water inlet points might be moved but this certainly does come at extra cost.
Shipping Container Home Designs and Plans

Bathroom remodel
If you have decided to perform the project yourself or part of the task it's time to employ a skip bin and grab that old bathroom. If your property is made pre 1980 maybe you have fibro bathroom wall linings with asbestos inside and great care will have to be taken. You will need some full body disposable overalls, eye protection, and quality dust mask. Check with the local building authority or council concerning the regulation on bathroom asbestos wall lining removal.
Remove everything except the plumbing. If you keep the toilet plumbing set up you do not ought to turn the lake off for the complete house. Also you will need to jack hammer the floor tiles up and the sand and cement bed that they're laid on.
Shipping Container Cabin Concept – Part 3

Bathroom Renovation and construction
Bathrooms must be construction properly from the ground-up to ensure that the finished job is correct and true. This also ensures the style and look of the toilet may have an excellent finish
The Bathroom Renovation Process

Install water and drainage pipe and electrical wires.

Install wall lining and ceiling after which install the tub hob and bath.

Waterproof the ground and shower and bath recess.

Correct late a floor with sand and cement ready for tiling.

Lay floor and wall tiles and after that grout.

Install new bathroom vanity, fittings, and taps - install new electrical.
Shipping Container Home Design in Iowa  S3DADESIGN CONTAINER


Paint ceiling and final  one - Plumbing and electrical
At this point brand new plumbing is installed for clean cold and warm water and drainage. Careful attention must be taken when positioning the new plumbing in order that the plumbing fittings are correct once the tiling ends. For example: To centre a fitting in a shower recess you should think about the thickness in the wall board, tile glue and tile so the fitting will likely be centred after the tiles are set up. The same refers to installing drainage pipes for a toilet; the wall lining and tile thickness have to be taken into account so the pipe influences correct position once the toilet is installed after tiling. Also rough inside any new electrical wires without connecting them towards the mains power.
Resume Template  Best Template  Resume Template Word  Professional Resume Template  Modern

Step two - Install wall and ceiling linings
Install your 6mm wall lining being careful to nail the fibro board every 150mm without nailing into the new pipes and electrical wires. The best way is to measure and mark the pipe and wire layout onto your new wall board having a pencil as you go. Screw up (or nail) the ceiling lining, plasterboard could be the most common. However if you are laying your tiles from floor to ceiling usually do not install the cornice because this is best done after tiling. If you happen to be not tiling on the ceiling just install the cornice following the wallboard and ceiling lining happen to be installed. Also if your bath just isn't freestanding now you can form the frame and install the bathtub. Ensure the bath is installed correctly permitting the thickness of the tiles and  sure to check on all linings and pipes prior to deciding to continue with a bath room renovation.

Shipping Container Home Designs and Plans
Montainer makes shipping container architecture easy  TreeHugger

Step three - Waterproof your bathroom
Waterproof a bath room floor, shower recess, and around the bathtub. When waterproofing the floor be sure that the waterproofing comes 100mm the walls. The shower recess will have to be waterproofed 100mm higher than the shower rose outlet. Also the bathtub should be waterproofed 100mm over the lip of the bath right around and to the floor. At the doorway put in a 25 x 25mm aluminum angle glued into place with quality silicone and waterproof into the lip. Your whole bathroom should now the tanked, hence the all water is only going to drop a drain. Bathroom waterproofing tip: waterproofing is a straightforward job but quality and accuracy is most critical.
Step four - Lay in the cement screed for the bottom.

Before a floor tiles can laid the bottom have to be smooth and fairly flat which has a slight fall to the drainage outlet. To do this you must use sand and cement mix in fact it is best to add a waterproofing agent into this at the same time. With a level, set the bottom level on the doorway. Use the top aluminum angle because the finished floor level and measure on the thickness from the tile plus 10mm for your glue. Mark right around the bathroom using a level after which screed in your sand and cement mix having a 1 to 3 degree fall for the top in the drain outlet. Take your time and acquire it right with the finished level as smooth as you can. When the sand cement mix has set but just isn't dry (it is possible to walk on it however, you it is a bit soft) rub it over with a house brick. This will remove every one of the small highs and lows and check having a level as you go. Let the lavatory floor fully dry and after that you needs to have a fantastic surface to tile onto. Tip: the greater work you place into a floor screed the simpler your tiling is going to be.
Shipping Container Cabin Concept – Part 3
Shipping Container Home Designs and Plans

Step five: Tile floor and walls
Lay your tiles on the bottom first and after that grout. Then lay your wall tiles making certain that they're level while you lay. Once the bathroom tiles happen to be cut and laid, grout all of your tiles and then buff the tiles clean.
Step six: Install plumbing fitting and fixtures
Install all of your plumbing fittings and taps. Also fit your towel rails and soap holders. Fit your brand-new bathroom vanity making sure it can be level and sealed throughout the top with silicone as well as seal around the bath. Tip: make sure they will be in the right place before you decide to drill into the tiles.
Shipping Container Home Design in Iowa S3DADESIGN CONTAINER
Shipping Container Cabin Concept – Part 3

Step seven: painting, and cleaning - enjoy
Paint your ceiling and execute a final clean making certain everything is fitted correctly understanding that there won't be any leaks within your plumbing. - Enjoy your brand-new bathroom.