Bathroom Renovation - A Step by Step Guide

Bathrooms are some of the smallest rooms in the house and they are also certainly the most expensive to renovate. Bathroom renovation is often a job that, if done well, can add value to some home plus a great space full of design and lightweight.
Modern Edge  Luxury Home Design  Riverstone

Bathroom design
Bathroom design may be the first division of your bathroom renovation you need right. Just replacing the existing bathroom sticking with the same design is probably not enough. The key to great bathroom design is always to design it with all the people that are going to apply it at heart. However be sure that your bathroom design also offers an over-all use factor at the same time.

For example: If you were designing your bathroom for families you could still design the bathroom with easy access on the shower and bath. This would ensure that the design would also work for people with limited mobility. This means if you decide to sell your home or if you happen to be renovating for profit your design has a wider market appeal. Great bathroom design also uses space well, looking at the sunshine or window space, size fittings, and drainage options. Draw out a strategy to scale and down the sizes of one's room. Mark the present drainage points then and water inlet points. Write down a wish listing of the bathroom fittings to require and wish with their sizes. Now marry both the together to see what fits. Note: Most bathroom drainage and water inlet points could be moved but this certainly does come at expense.
Jerndører med glass  Myhre Smie

Bathroom remodel
If you have chosen to accomplish the project yourself or part of the work it is time to engage a skip bin and pull out that old bathroom. If your house was made pre 1980 you may have fibro bathroom wall linings with asbestos inside and great care will have to be taken. You will need some full body disposable overalls, eye protection, and quality dust mask. Check with your local building authority or council regarding the regulation on bathroom asbestos wall lining removal.
Remove everything except the plumbing. If you keep the lavatory plumbing available you'll not ought to turn the lake off for the complete house. Also you should jack hammer the ground tiles up as well as the sand and cement bed they are laid on.
Home Gym Addition Brentwood  Eden Builders

Bathroom Renovation and construction
Bathrooms have to be construction properly in the ground-up to make sure that the finished job is correct and true. This also ensures the structure and appear of the restroom will have a fantastic finish
The Bathroom Renovation Process

Install water and drainage pipe and electrical wires.

Install wall lining and ceiling after which install the tub hob and bath.

Waterproof the bottom and shower and bath recess.

Correct the fall of the ground with sand and cement ready for tiling.

Lay floor and wall tiles and after that grout.

Install new bathroom vanity, fittings, and taps - install new electrical.
St. Patricks Home of Ottawa Long‑Term Care Facility  Hobin Architecture


Paint ceiling and final  one - Plumbing and electrical
At this aspect brand new plumbing is installed for clean hot and cold water and drainage. Careful attention needs to be taken when positioning the brand new plumbing so the plumbing fittings are correct once the tiling ends. For example: To centre a fitting in the shower recess you should take into consideration the thickness in the wall board, tile glue and tile hence the fitting is going to be centred after the tiles are in place. The same applies to installing drainage pipes for the toilet; the wall lining and tile thickness has to be looked at so the pipe is in the correct position in the event the toilet is installed after tiling. Also rough inside the any new electrical wires without connecting them on the mains power.
Ann Arbor Area Real Estate for Sale: Portage Lakefront log home in Pinckney www.KathyToth.com

Step two - Install wall and ceiling linings
Install your 6mm wall lining fostering to nail the fibro board every 150mm without nailing into the brand new pipes and electrical wires. The best way is always to measure and mark the pipe and wire layout on your new wall board using a pencil when you go. Screw up (or nail) the ceiling lining, plasterboard may be the most common. However if you happen to be laying your tiles from floor to ceiling don't install the cornice because this is done after tiling. If you are not tiling for the ceiling proceed to install the cornice as soon as the wallboard and ceiling lining are already installed. Also if your bath is not freestanding now you can make up the frame and install the tub. Ensure the bathtub is installed correctly permitting the thickness from the tiles and  sure to test all linings and pipes when you continue with a bath room renovation.

Jerndører med glass Myhre Smie
Modern Edge  Luxury Home Design  Riverstone

Step three - Waterproof your bathroom
Waterproof a bath room floor, shower recess, and around the bathtub. When waterproofing a floor be sure that the waterproofing comes 100mm up the walls. The shower recess will need to be waterproofed 100mm across the shower rose outlet. Also the tub needs to be waterproofed 100mm across the lip with the bath around and to the floor. At the doorway install a 25 x 25mm aluminum angle glued into place with quality silicone and waterproof into the lip. Your whole bathroom should now the tanked, so the all water will only drop a drain. Bathroom waterproofing tip: waterproofing is a straightforward job but quality and accuracy is most critical.
Step four - Lay inside cement screed for the bottom.

Before the ground tiles can laid the ground should be smooth and fairly flat with a slight fall towards the drainage outlet. To do this you need to use sand and cement mix in fact it is advisable to give a waterproofing agent into this as well. With a level, set the floor level in the doorway. Use the top aluminum angle because finished floor level and measure on the thickness of the tile plus 10mm to the glue. Mark around the toilet with a level then screed with your sand and cement mix which has a 1 to 3 degree fall for the top from the drain outlet. Take your time and acquire it right with the finished level as smooth as you can. When the sand cement mix has set but is just not dry (it is possible to walk into it however you it's still a bit soft) rub it over using a house brick. This will remove all of the small highs and lows and check using a level when you go. Let the bathroom floor fully dry after which you should have a great surface to tile onto. Tip: greater work you set into a floor screed the more your tiling will likely be.
Home Gym Addition Brentwood Eden Builders
Jerndører med glass  Myhre Smie

Step five: Tile floor and walls
Lay your tiles on a floor first after which grout. Then lay your wall tiles making sure they are level because you lay. Once the restroom tiles happen to be cut and laid, grout all of your tiles then buff the tiles clean.
Step six: Install plumbing fitting and fixtures
Install all of your plumbing fittings and taps. Also fit your towel rails and soap holders. Fit your brand-new bathroom vanity ensuring it really is level and sealed throughout the top with silicone as well as seal around the bath. Tip: make sure they come in the right place prior to deciding to drill into the tiles.
St. Patricks Home of Ottawa Long‑Term Care Facility Hobin Architecture
Home Gym Addition Brentwood  Eden Builders

Step seven: painting, and cleaning - enjoy
Paint your ceiling and perform a final clean making sure things are fitted correctly which there won't be any leaks within your plumbing. - Enjoy your brand-new bathroom.