Bathroom Renovation - A Step by Step Guide

Bathrooms are among the smallest rooms in the home and they're also one the most expensive to renovate. Bathroom renovation is really a job that, if done well, will add value to your home plus a great space packed with design and light-weight.
Marrano Homes Home Builders in Western New York  Buffalo, NY

Bathroom design
Bathroom design will be the first section of your bathroom renovation you should get right. Just replacing the present bathroom with the exact same design might not be enough. The key to great bathroom design would be to design it with the folks that will certainly put it to use in your mind. However make sure that your bathroom design boasts a general use factor also.

For example: If you were designing your bathroom for families you may still design the lavatory with quick access to the shower and bath. This would make sure that the design would recieve treatment for people with limited mobility. This means if you sell your own home or if you might be renovating for profit your design includes a wider market appeal. Great bathroom design also uses the space well, considering the sunshine or window space, size of fittings, and drainage options. Draw out an idea to scale and right down the sizes of the room. Mark the prevailing drainage points after which and water inlet points. Write down a wish set of the toilet fittings to wish and desire using their sizes. Now marry both the together and see what fits. Note: Most bathroom drainage and water inlet points may be moved but this will come at extra expense.
Discovery IV  Marrano Homes

Bathroom remodel
If you decide to perform the job yourself or part of the task it is time to hire a skip bin and grab the existing bathroom. If your home was developed pre 1980 you may have fibro bathroom wall linings with asbestos inside it and great care will need to be taken. You will need some full body disposable overalls, eye protection, and quality dust mask. Check with the local building authority or council about the regulation on bathroom asbestos wall lining removal.
Remove everything except the plumbing. If you keep the bathroom plumbing available you will not must turn the water off for the complete house. Also you will have to jack hammer the floor tiles up and also the sand and cement bed they are laid on.
Modern Minimalist House Design for A Single Family Life  YouTube

Bathroom Renovation and construction
Bathrooms should be construction properly in the ground-up to make certain that the finished job is correct and true. This also ensures the structure and search of the restroom could have a great finish
The Bathroom Renovation Process

Install water and drainage pipe and electrical wires.

Install wall lining and ceiling and then install the bathtub hob and bath.

Waterproof the ground and shower and bath recess.

Correct late the ground with sand and cement ready for tiling.

Lay floor and wall tiles after which grout.

Install new bathroom vanity, fittings, and taps - install new electrical.
MultiFamily House Plan First Floor 055D0865 BEAUTIFUL units in both sides of this Duplex


Paint ceiling and final  one - Plumbing and electrical
At this point new plumbing is installed for clean cold and hot water and drainage. Careful attention should be taken when positioning the brand new plumbing so the plumbing fittings are correct when the tiling is fully gone. For example: To centre a fitting in a very shower recess you must take into consideration the thickness in the wall board, tile glue and tile therefore the fitting will probably be centred following the tiles are available. The same pertains to installing drainage pipes to get a toilet; the wall lining and tile thickness should be taken into consideration therefore the pipe is in the correct position in the event the toilet is installed after tiling. Also rough inside the any new electrical wires without connecting them for the mains power.
Building a Secondary Suite  City of Surrey

Step two - Install wall and ceiling linings
Install your 6mm wall lining being careful to nail the fibro board every 150mm without nailing into the modern pipes and electrical wires. The best way is always to measure and mark the pipe and wire layout on your new wall board having a pencil because you go. Screw up (or nail) the ceiling lining, plasterboard could be the most common. However if you're laying your tiles from floor to ceiling tend not to install the cornice because this is best done after tiling. If you might be not tiling to the ceiling go on and install the cornice following the wallboard and ceiling lining are already installed. Also if your bath is not freestanding now you can make up the frame and install the bathtub. Ensure the tub is installed correctly allowing for the thickness in the tiles and  sure to check on all linings and pipes before you continue with your bathrooms renovation.

Discovery IV Marrano Homes
Marrano Homes Home Builders in Western New York  Buffalo, NY

Step three - Waterproof your bathroom
Waterproof your bathroom floor, shower recess, and around the tub. When waterproofing a floor ensure that the waterproofing comes 100mm up the walls. The shower recess must be waterproofed 100mm above the shower rose outlet. Also the bathtub needs to be waterproofed 100mm over the lip with the bath about and for the floor. At the doorway put in a 25 x 25mm aluminum angle glued into place with quality silicone and waterproof in the lip. Your whole bathroom should now the tanked, hence the all water will simply go lower a drain. Bathroom waterproofing tip: waterproofing is a simple job but quality and accuracy is most crucial.
Step four - Lay inside the cement screed for the bottom.

Before the ground tiles can laid the bottom should be smooth and fairly flat having a slight fall towards the drainage outlet. To do this you need to use sand and cement mix and it's also far better to put in a waterproofing agent into this also. With a level, set a floor level at the doorway. Use the top aluminum angle because the finished floor level and measure around the thickness with the tile plus 10mm for that glue. Mark about the restroom using a level then screed with your sand and cement mix using a 1 to 3 degree fall to the top of the drain outlet. Take your time and get it right using the finished level as smooth as you can. When the sand cement mix has set but is not dry (you'll be able to walk on it however you will still be a little soft) rub it over using a house brick. This will remove each of the small highs and lows and check using a level because you go. Let the restroom floor fully dry then you should have a fantastic surface to tile onto. Tip: greater work you place into the bottom screed the simpler your tiling will be.
Modern Minimalist House Design for A Single Family Life YouTube
Discovery IV  Marrano Homes

Step five: Tile floor and walls
Lay your tiles on the floor first and after that grout. Then lay your wall tiles making certain that they are level because you lay. Once the lavatory tiles have been cut and laid, grout your tiles and after that buff the tiles clean.
Step six: Install plumbing fitting and fixtures
Install your entire plumbing fittings and taps. Also fit all your towel rails and soap holders. Fit your brand-new bathroom vanity making certain it's level and sealed around the top with silicone plus seal around the bathtub. Tip: make sure they are in the right place before you decide to drill into the tiles.
MultiFamily House Plan First Floor 055D0865 BEAUTIFUL units in both sides of this Duplex
Modern Minimalist House Design for A Single Family Life  YouTube

Step seven: painting, and cleaning - enjoy
Paint your ceiling and perform final clean making certain things are fitted correctly understanding that there aren't any leaks in your plumbing. - Enjoy your bathroom.