House Plans Canada Stock Custom

3 Bedroom Home Design Plans Floor Plan House Plans Canada Stock Custom

Bathroom Renovation - A Step by Step Guide

Bathrooms are among the smallest rooms inside your home and they are also one the most costly to renovate. Bathroom renovation is a job that, if done well, may add value to your home along with a great space packed with design and light-weight.
House Plans Canada  Stock Custom

Bathroom design
Bathroom design could be the first area of your bathrooms renovation you need to get right. Just replacing the current bathroom with the same design will not be enough. The key to great bathroom design is usually to design it while using folks that are going to use it in your mind. However make certain that a bath room design even offers a broad use factor at the same time.

For example: If you were designing a bathroom for families you can still design the toilet with comfortable access on the shower and bath. This would make sure that the look would recieve treatment for those who have limited mobility. This means if you opt to sell your house or if you happen to be renovating for profit your design has a wider market appeal. Great bathroom design also uses space well, looking at the light or window space, height and width of fittings, and drainage options. Draw out an idea to scale and right down the sizes of the room. Mark the present drainage points then and water inlet points. Write down a wish list of the toilet fittings to want and need using their sizes. Now marry both the together and discover what fits. Note: Most bathroom drainage and water inlet points could be moved but this certainly does come at extra cost.
Basham Rentals  235 S Salisbury St  3 Bedroom Floor Plan

Bathroom remodel
If you have decided to accomplish the job yourself or part of the work it's time to engage a skip bin and grab that old bathroom. If your house was developed pre 1980 you may have fibro bathroom wall linings with asbestos within it and great care will need to be taken. You will need some full body disposable overalls, eye protection, and quality dust mask. Check with your neighborhood building authority or council regarding the regulation on bathroom asbestos wall lining removal.
Remove everything except the plumbing. If you keep the lavatory plumbing set up you do not have to turn the river off for the whole house. Also you will have to jack hammer a floor tiles up along with the sand and cement bed actually laid on.
3 Bedrm, 1657 Sq Ft Traditional House Plan 1421176

Bathroom Renovation and construction
Bathrooms must be construction properly through the ground up to make sure that the finished job is correct and true. This also ensures the style and look of the lavatory will have an incredible finish
The Bathroom Renovation Process

Install water and drainage pipe and electrical wires.

Install wall lining and ceiling after which install the bathtub hob and bath.

Waterproof the bottom and shower and bath recess.

Correct the fall of a floor with sand and cement ready for tiling.

Lay floor and wall tiles and after that grout.

Install new bathroom vanity, fittings, and taps - install new electrical.
Floor Plans Ranch Homes Bedrooms Quotes  House Plans  85847


Paint ceiling and final  one - Plumbing and electrical
At this time many new plumbing is installed for clean cold and hot water and drainage. Careful attention must be taken when positioning the brand new plumbing in order that the plumbing fittings are correct if the tiling ends. For example: To centre a fitting inside a shower recess you need to think about the thickness with the wall board, tile glue and tile hence the fitting will be centred following the tiles are available. The same relates to installing drainage pipes for the toilet; the wall lining and tile thickness has to be taken into account so the pipe influences correct position when the toilet is installed after tiling. Also rough inside the any new electrical wires without connecting them for the mains power.
3 Bedroom 285m2 [FLOOR PLAN ONLY] – HousePlansHQ

Step two - Install wall and ceiling linings
Install your 6mm wall lining being careful to nail the fibro board every 150mm without nailing into the new pipes and electrical wires. The best way is usually to measure and mark the pipe and wire layout on your new wall board with a pencil when you go. Screw up (or nail) the ceiling lining, plasterboard will be the most common. However if you are laying your tiles from floor to ceiling do not install the cornice because most effectively achieved after tiling. If you happen to be not tiling for the ceiling just install the cornice after the wallboard and ceiling lining have been installed. Also if your bath isn't freestanding you can now from the frame and install the tub. Ensure the bathtub is installed correctly allowing for the thickness in the tiles and  sure to check on all linings and pipes when you continue with your bathroom renovation.

Basham Rentals 235 S Salisbury St 3 Bedroom Floor Plan
House Plans Canada  Stock Custom

Step three - Waterproof your bathroom
Waterproof your bathroom floor, shower recess, and around the tub. When waterproofing the floor ensure that the waterproofing comes 100mm the walls. The shower recess should be waterproofed 100mm above the shower rose outlet. Also the bathtub needs to be waterproofed 100mm over the lip of the bath right around and for the floor. At the doorway install a 25 x 25mm aluminum angle glued into place with quality silicone and waterproof in the lip. Your whole bathroom should now the tanked, so the all water is only going to drop a drain. Bathroom waterproofing tip: waterproofing is a straightforward job but quality and accuracy is most crucial.
Step four - Lay in the cement screed for the ground.

Before the bottom tiles can laid the floor must be smooth and fairly flat which has a slight fall for the drainage outlet. To do this you must use sand and cement mix and it is far better to give a waterproofing agent into this also. With a level, set a floor level at the doorway. Use the top aluminum angle as the finished floor level and measure around the thickness in the tile plus 10mm for your glue. Mark about the toilet which has a level after which screed within your sand and cement mix having a 1 to 3 degree fall towards the top in the drain outlet. Take your time and have it right with the finished level as smooth as you can. When the sand cement mix has set but is not dry (it is possible to walk on it but you it's still somewhat soft) rub it over with a house brick. This will remove each of the small highs and lows and appearance which has a level as you go. Let the restroom floor fully dry and then you should have an incredible surface to tile onto. Tip: the greater work you place into the bottom screed the easier your tiling is going to be.
3 Bedrm, 1657 Sq Ft Traditional House Plan 1421176
Basham Rentals  235 S Salisbury St  3 Bedroom Floor Plan

Step five: Tile floor and walls
Lay your tiles on the bottom first after which grout. Then lay your wall tiles making certain that they are level while you lay. Once the restroom tiles are already cut and laid, grout all of your tiles after which buff the tiles clean.
Step six: Install plumbing fitting and fixtures
Install all of your plumbing fittings and taps. Also fit your towel rails and soap holders. Fit your new bathroom vanity ensuring it's level and sealed throughout the top with silicone plus seal around the tub. Tip: make sure they have been in the right place before you drill in your tiles.
Floor Plans Ranch Homes Bedrooms Quotes House Plans 85847
3 Bedrm, 1657 Sq Ft Traditional House Plan 1421176

Step seven: painting, and cleaning - enjoy
Paint your ceiling and perform a final clean making certain it is all totally fitted correctly understanding that there are no leaks inside your plumbing. - Enjoy your new bathroom.

Comments