Bathroom Renovation - A Step by Step Guide

Bathrooms are some of the smallest rooms in the house plus they are also certainly the most expensive for renovate. Bathroom renovation is often a job that, if done well, can add value to your home along with a great space brimming with design and light.
House in Bangalore / Cadence  DesignToDesign Magazine  DesignToDesign.com , The Ultimate

Bathroom design
Bathroom design is the first division of your bathrooms renovation you need right. Just replacing the present bathroom with the same design may not be enough. The key to great bathroom design would be to design it using the people that will put it to use in your mind. However be sure that a bath room design even offers an overall use factor as well.

For example: If you were designing a bathroom for families you might still design the toilet with comfortable access to the shower and bath. This would make sure that the design would recieve treatment for those who have limited mobility. This means if you sell your home or if you might be renovating for profit your design includes a wider market appeal. Great bathroom design also uses the space well, looking at the light or window space, sized fittings, and drainage options. Draw out a strategy to scale and down the sizes of your room. Mark the present drainage points and then and water inlet points. Write down a wish listing of the lavatory fittings to wish and need making use of their sizes. Now marry both the together and discover what fits. Note: Most bathroom drainage and water inlet points could be moved but this may come at expense.
House Designs Bangalore  Front Elevation by Ashwin Architects at Coroflot.com

Bathroom remodel
If you've decided to complete the task yourself or part of the project it is time to work with a skip bin and take out the old bathroom. If your property is made pre 1980 you could have fibro bathroom wall linings with asbestos in it and great care will have to be taken. You will need some full body disposable overalls, eye protection, and quality dust mask. Check with the local building authority or council regarding the regulation on bathroom asbestos wall lining removal.
Remove everything except the plumbing. If you keep the toilet plumbing in position you will not ought to turn water off for your house. Also you will likely need to jack hammer the ground tiles up and also the sand and cement bed actually laid on.
house architecture modernhome colonial Mediterranean, traditional contemporary  Architect

Bathroom Renovation and construction
Bathrooms should be construction properly through the ground-up to be sure that the finished job is correct and true. This also ensures the look and appear of the bathroom can have an incredible finish
The Bathroom Renovation Process

Install water and drainage pipe and electrical wires.

Install wall lining and ceiling and after that install the bath hob and bath.

Waterproof the ground and shower and bath recess.

Correct nov the floor with sand and cement ready for tiling.

Lay floor and wall tiles and then grout.

Install new bathroom vanity, fittings, and taps - install new electrical.
Apartment Interior Design Tips For FirstTime Homeowners  Architecture Ideas


Paint ceiling and final  one - Plumbing and electrical
At this point new plumbing is installed for clean cold and warm water and drainage. Careful attention needs to be taken when positioning the modern plumbing so that the plumbing fittings are correct once the tiling is finished. For example: To centre a fitting in the shower recess you must think about the thickness in the wall board, tile glue and tile hence the fitting will likely be centred following your tiles are set up. The same refers to installing drainage pipes for a toilet; the wall lining and tile thickness has to be taken into consideration so the pipe is incorporated in the correct position when the toilet is installed after tiling. Also rough inside the any new electrical wires without connecting them for the mains power.
4 bedroom Villa at Prestige Glenwood por ACE INTERIORS  homify

Step two - Install wall and ceiling linings
Install your 6mm wall lining being careful to nail the fibro board every 150mm without nailing into the modern pipes and electrical wires. The best way would be to measure and mark the pipe and wire layout on your new wall board using a pencil when you go. Screw up (or nail) the ceiling lining, plasterboard will be the most common. However if you happen to be laying your tiles from floor to ceiling don't install the cornice because most effectively achieved after tiling. If you are not tiling towards the ceiling go ahead and install the cornice following your wallboard and ceiling lining have been installed. Also if your bath just isn't freestanding you can now make up the frame and install the bath. Ensure the tub is installed correctly making it possible for the thickness from the tiles and  sure to check on all linings and pipes prior to deciding to continue with your bathrooms renovation.

House Designs Bangalore Front Elevation by Ashwin Architects at Coroflot.com
House in Bangalore / Cadence  DesignToDesign Magazine  DesignToDesign.com , The Ultimate

Step three - Waterproof your bathroom
Waterproof a bath room floor, shower recess, and around the bathtub. When waterproofing the floor make certain that the waterproofing comes 100mm in the walls. The shower recess will need to be waterproofed 100mm above the shower rose outlet. Also the bathtub must be waterproofed 100mm higher than the lip from the bath around and towards the floor. At the doorway use a 25 x 25mm aluminum angle glued into place with quality silicone and waterproof to the lip. Your whole bathroom should now the tanked, therefore the all water will still only go lower a drain. Bathroom waterproofing tip: waterproofing is a simple job but quality and accuracy is most crucial.
Step four - Lay within the cement screed for the floor.

Before the bottom tiles can laid the bottom should be smooth and fairly flat using a slight fall for the drainage outlet. To do this you need to use sand and cement mix in fact it is advisable to put in a waterproofing agent into this also. With a level, set the bottom level at the doorway. Use the top aluminum angle since the finished floor level and measure around the thickness of the tile plus 10mm for the glue. Mark about the lavatory with a level and then screed in your sand and cement mix with a 1 to 3 degree fall towards the top with the drain outlet. Take your time and get it right with the finished level as smooth as you possibly can. When the sand cement mix has set but is not dry (you can walk onto it however you it's still somewhat soft) rub it over which has a house brick. This will remove every one of the small highs and lows and appearance having a level when you go. Let the toilet floor fully dry then you really should have a great surface to tile onto. Tip: the greater work you place into the ground screed the easier your tiling will likely be.
house architecture modernhome colonial Mediterranean, traditional contemporary Architect
House Designs Bangalore  Front Elevation by Ashwin Architects at Coroflot.com

Step five: Tile floor and walls
Lay your tiles on the bottom first and then grout. Then lay your wall tiles ensuring they are level when you lay. Once the toilet tiles happen to be cut and laid, grout your entire tiles and then buff the tiles clean.
Step six: Install plumbing fitting and fixtures
Install all of your plumbing fittings and taps. Also fit all of your towel rails and soap holders. Fit a new bathroom vanity ensuring that it's level and sealed round the top with silicone and also seal around the bath. Tip: make sure they are in the right place before you drill into your tiles.
Apartment Interior Design Tips For FirstTime Homeowners Architecture Ideas
house architecture modernhome colonial Mediterranean, traditional contemporary  Architect

Step seven: painting, and cleaning - enjoy
Paint your ceiling and execute a final clean making certain everything is fitted correctly which there aren't any leaks in your plumbing. - Enjoy a new bathroom.