Bathroom Renovation - A Step by Step Guide

Bathrooms are among the smallest rooms at home plus they are also one the most expensive for renovate. Bathroom renovation is often a job that, if done well, can also add value to a home as well as a great space brimming with design and light.
house floor plans with pictures  Jupiter Farms The Oak Model single family home floor plans

Bathroom design
Bathroom design could be the first area of a bath room renovation you need right. Just replacing the present bathroom with similar design is probably not enough. The key to great bathroom design is usually to design it with the folks that will certainly utilize it at heart. However ensure that a bath room design boasts a broad use factor as well.

For example: If you were designing your bathrooms for families you could still design the toilet with easy accessibility for the shower and bath. This would ensure that the design would also work if you have limited mobility. This means if you decide to sell your home or if you're renovating for profit your design includes a wider market appeal. Great bathroom design also uses space well, taking into account the light or window space, size of fittings, and drainage options. Draw out an agenda to scale and all the way down the sizes of your room. Mark the current drainage points and after that and water inlet points. Write down a wish set of the restroom fittings to need and need making use of their sizes. Now marry both the together to see what fits. Note: Most bathroom drainage and water inlet points could be moved but this does come at expense.
Marrano Homes Home Builders in Western New York  Buffalo, NY

Bathroom remodel
If you have decided to complete the project yourself or part of the work it really is time to hire a skip bin and retrieve the previous bathroom. If your own home appeared pre 1980 you might have fibro bathroom wall linings with asbestos in it and great care should be taken. You will need some full body disposable overalls, eye protection, and quality dust mask. Check with the local building authority or council concerning the regulation on bathroom asbestos wall lining removal.
Remove everything except the plumbing. If you keep the bathroom plumbing set up you will not must turn the water off for your house. Also you will have to jack hammer the bottom tiles up and also the sand and cement bed they are laid on.
Simple Single Floor House Design  YouTube

Bathroom Renovation and construction
Bathrooms must be construction properly through the ground-up to make certain that the finished job is correct and true. This also ensures the style and search of the toilet may have a fantastic finish
The Bathroom Renovation Process

Install water and drainage pipe and electrical wires.

Install wall lining and ceiling and then install the tub hob and bath.

Waterproof the ground and shower and bath recess.

Correct december the ground with sand and cement ready for tiling.

Lay floor and wall tiles after which grout.

Install new bathroom vanity, fittings, and taps - install new electrical.
Dryden  Single Family Home Floor Plans  Claridge Homes


Paint ceiling and final  one - Plumbing and electrical
At this time brand new plumbing is installed for clean cold and warm water and drainage. Careful attention has to be taken when positioning the brand new plumbing so your plumbing fittings are correct once the tiling is finished. For example: To centre a fitting in the shower recess you must consider the thickness of the wall board, tile glue and tile therefore the fitting is going to be centred following your tiles are available. The same relates to installing drainage pipes for any toilet; the wall lining and tile thickness must be looked at and so the pipe influences correct position if the toilet is installed after tiling. Also rough in the any new electrical wires without connecting them for the mains power.
Discovery IV  Marrano Homes

Step two - Install wall and ceiling linings
Install your 6mm wall lining the constant maintenance to nail the fibro board every 150mm without nailing into the newest pipes and electrical wires. The best way is usually to measure and mark the pipe and wire layout on to your new wall board with a pencil as you go. Screw up (or nail) the ceiling lining, plasterboard could be the most common. However if you're laying your tiles from floor to ceiling usually do not install the cornice because done after tiling. If you are not tiling for the ceiling proceed to install the cornice as soon as the wallboard and ceiling lining are already installed. Also if your bath is not freestanding you can now from the frame and install the tub. Ensure the bathtub is installed correctly enabling the thickness from the tiles and  sure to test all linings and pipes before you decide to continue with a bath room renovation.

Marrano Homes Home Builders in Western New York Buffalo, NY
house floor plans with pictures  Jupiter Farms The Oak Model single family home floor plans

Step three - Waterproof your bathroom
Waterproof a bath room floor, shower recess, and around the tub. When waterproofing the floor be sure that the waterproofing comes 100mm in the walls. The shower recess should be waterproofed 100mm above the shower rose outlet. Also the bath should be waterproofed 100mm higher than the lip in the bath right around and on the floor. At the doorway install a 25 x 25mm aluminum angle glued into place with quality silicone and waterproof in to the lip. Your whole bathroom should now the tanked, hence the all water is only going to go lower a drain. Bathroom waterproofing tip: waterproofing is a simple job but quality and accuracy is most critical.
Step four - Lay in the cement screed for a floor.

Before the bottom tiles can laid the ground has to be smooth and fairly flat which has a slight fall towards the drainage outlet. To do this you have to use sand and cement mix and it is advisable to put in a waterproofing agent into this also. With a level, set the ground level in the doorway. Use the top aluminum angle because finished floor level and measure on the thickness from the tile plus 10mm for the glue. Mark right around the restroom which has a level and then screed in your sand and cement mix with a 1 to 3 degree fall on the top in the drain outlet. Take your time and acquire it right while using finished level as smooth as possible. When the sand cement mix has set but is not dry (you are able to walk about it but you it is a bit soft) rub it over which has a house brick. This will remove every one of the small highs and lows and appearance which has a level while you go. Let the bathroom floor fully dry after which you really should have an excellent surface to tile onto. Tip: the harder work you add into the bottom screed the simpler your tiling will be.
Simple Single Floor House Design YouTube
Marrano Homes Home Builders in Western New York  Buffalo, NY

Step five: Tile floor and walls
Lay your tiles on the floor first then grout. Then lay your wall tiles ensuring that they are level because you lay. Once the bathroom tiles happen to be cut and laid, grout all your tiles then buff the tiles clean.
Step six: Install plumbing fitting and fixtures
Install all your plumbing fittings and taps. Also fit all of your towel rails and soap holders. Fit your new bathroom vanity ensuring it's level and sealed round the top with silicone as well as seal around the bathtub. Tip: make sure they will be in the right place when you drill into the tiles.
Dryden Single Family Home Floor Plans Claridge Homes
Simple Single Floor House Design  YouTube

Step seven: painting, and cleaning - enjoy
Paint your ceiling and perform a final clean making sure it is all totally fitted correctly which there aren't any leaks within your plumbing. - Enjoy your brand-new bathroom.