Desert Landscaping Ideas HGTV

Best Backyard Design Ideas Desert Landscaping Ideas HGTV

Bathroom Renovation - A Step by Step Guide

Bathrooms are among the smallest rooms inside your home and they are generally also certainly the most expensive for renovate. Bathroom renovation is often a job that, if done well, can also add value to some home along with a great space full of design and lightweight.
Desert Landscaping Ideas  HGTV

Bathroom design
Bathroom design could be the first division of your bathrooms renovation you need right. Just replacing the existing bathroom with the exact same design may not be enough. The key to great bathroom design is always to design it with the people that are likely to utilize it in your mind. However make certain that your bathroom design even offers an overall use factor as well.

For example: If you were designing your bathrooms for families you may still design the lavatory with easy access to the shower and bath. This would be sure that the style would also work for people with limited mobility. This means if you choose to sell your home or if you're renovating for profit your design includes a wider market appeal. Great bathroom design also uses the area well, taking into consideration the sunlight or window space, size of fittings, and drainage options. Draw out a plan to scale and all the way down the sizes of one's room. Mark the existing drainage points after which and water inlet points. Write down a wish list of the restroom fittings to need and desire making use of their sizes. Now marry both together to see what fits. Note: Most bathroom drainage and water inlet points can be moved but this does come at expense.
Top 60 Best Cool Backyard Ideas  Outdoor Retreat Designs

Bathroom remodel
If you have chosen to do the job yourself or part of the task it can be time to hire a skip bin and take out the existing bathroom. If your home is made pre 1980 you might have fibro bathroom wall linings with asbestos in it and great care must be taken. You will need some full body disposable overalls, eye protection, and quality dust mask. Check with the local building authority or council about the regulation on bathroom asbestos wall lining removal.
Remove everything except the plumbing. If you keep the toilet plumbing available you'll not need to turn the river off for the entire house. Also you should jack hammer the bottom tiles up along with the sand and cement bed that they're laid on.
25+ Best Front Yard Landscaping Ideas on YouTube  YouTube

Bathroom Renovation and construction
Bathrooms has to be construction properly from the start to make certain that the finished job is correct and true. This also ensures the look and search of the bathroom can have a great finish
The Bathroom Renovation Process

Install water and drainage pipe and electrical wires.

Install wall lining and ceiling and then install the bath hob and bath.

Waterproof a floor and shower and bath recess.

Correct december the bottom with sand and cement ready for tiling.

Lay floor and wall tiles and then grout.

Install new bathroom vanity, fittings, and taps - install new electrical.
16 Captivating Modern Landscape Designs For A Modern Backyard


Paint ceiling and final  one - Plumbing and electrical
At this time new plumbing is installed for clean hot and cold water and drainage. Careful attention must be taken when positioning the newest plumbing so the plumbing fittings are correct in the event the tiling is completed. For example: To centre a fitting in a shower recess you have to consider the thickness from the wall board, tile glue and tile so the fitting will likely be centred following the tiles are in place. The same relates to installing drainage pipes for any toilet; the wall lining and tile thickness have to be taken into account so the pipe is within the correct position if the toilet is installed after tiling. Also rough within the any new electrical wires without connecting them on the mains power.
Planning Your Outdoor Space  HGTV

Step two - Install wall and ceiling linings
Install your 6mm wall lining being careful to nail the fibro board every 150mm without nailing into the brand new pipes and electrical wires. The best way is usually to measure and mark the pipe and wire layout on to your new wall board which has a pencil as you go. Screw up (or nail) the ceiling lining, plasterboard could be the most common. However if you're laying your tiles from floor to ceiling tend not to install the cornice because this is done after tiling. If you happen to be not tiling for the ceiling proceed to install the cornice following your wallboard and ceiling lining happen to be installed. Also if your bath is not freestanding anyone can make up the frame and install the bathtub. Ensure the tub is installed correctly enabling the thickness in the tiles and  sure to test all linings and pipes before you continue with your bathroom renovation.

Top 60 Best Cool Backyard Ideas Outdoor Retreat Designs
Desert Landscaping Ideas  HGTV

Step three - Waterproof your bathroom
Waterproof a bath room floor, shower recess, and around the bath. When waterproofing the bottom make sure that the waterproofing comes 100mm up the walls. The shower recess will have to be waterproofed 100mm above the shower rose outlet. Also the bath needs to be waterproofed 100mm higher than the lip in the bath around and for the floor. At the doorway purchase a 25 x 25mm aluminum angle glued into place with quality silicone and waterproof into the lip. Your whole bathroom should now the tanked, hence the all water will simply go lower a drain. Bathroom waterproofing tip: waterproofing is an easy job but quality and accuracy is most significant.
Step four - Lay inside the cement screed for the ground.

Before the ground tiles can laid the bottom should be smooth and fairly flat using a slight fall on the drainage outlet. To do this you must use sand and cement mix and it is best to add a waterproofing agent into this at the same time. With a level, set the floor level with the doorway. Use the top aluminum angle because finished floor level and measure down the thickness with the tile plus 10mm for the glue. Mark around the toilet which has a level and then screed in your sand and cement mix which has a 1 to 3 degree fall towards the top from the drain outlet. Take your time and obtain it right using the finished level as smooth as you possibly can. When the sand cement mix has set but isn't dry (it is possible to walk into it but you it's still a little soft) rub it over using a house brick. This will remove each of the small highs and lows and check using a level when you go. Let the restroom floor fully dry and after that you needs to have an incredible surface to tile onto. Tip: greater work you set into a floor screed the easier your tiling will be.
25+ Best Front Yard Landscaping Ideas on YouTube YouTube
Top 60 Best Cool Backyard Ideas  Outdoor Retreat Designs

Step five: Tile floor and walls
Lay your tiles on the floor first and after that grout. Then lay your wall tiles ensuring that that they are level while you lay. Once the lavatory tiles are actually cut and laid, grout all your tiles and after that buff the tiles clean.
Step six: Install plumbing fitting and fixtures
Install your entire plumbing fittings and taps. Also fit your towel rails and soap holders. Fit a new bathroom vanity making sure it really is level and sealed across the top with silicone plus seal around the tub. Tip: make sure they have been in the right place prior to deciding to drill into the tiles.
16 Captivating Modern Landscape Designs For A Modern Backyard
25+ Best Front Yard Landscaping Ideas on YouTube  YouTube

Step seven: painting, and cleaning - enjoy
Paint your ceiling and perform final clean ensuring things are fitted correctly and that there isn't any leaks in your plumbing. - Enjoy your brand-new bathroom.

Comments