Contemporary Style House Plan 4 Beds 3.5 Baths 4983 Sq/Ft Plan 928287 Dreamhomesource.com

Single Family Home Designs ARCHITECTURAL DESIGN STUDIO Contemporary Style House Plan 4 Beds 3.5 Baths 4983 Sq/Ft Plan 928287 Dreamhomesource.com

Bathroom Renovation - A Step by Step Guide

Bathrooms are one of the smallest rooms in the house and they are generally also certainly the most costly to renovate. Bathroom renovation is often a job that, if done well, can also add value with a home along with a great space packed with design and lightweight.
Contemporary Style House Plan  4 Beds 3.5 Baths 4983 Sq/Ft Plan 928287  Dreamhomesource.com

Bathroom design
Bathroom design will be the first part of your bathrooms renovation you need to get right. Just replacing the present bathroom with the same design will not be enough. The key to great bathroom design is usually to design it with the people that are likely to put it to use at heart. However make sure that a bath room design also offers a general use factor also.

For example: If you were designing a bathroom for families you could still design the restroom with quick access towards the shower and bath. This would ensure that the structure would also work for those who have limited mobility. This means if you sell your own home or if you are renovating for profit your design features a wider market appeal. Great bathroom design also uses the room well, considering the sunlight or window space, sized fittings, and drainage options. Draw out an idea to scale and down the sizes of your respective room. Mark the current drainage points then and water inlet points. Write down a wish report on the lavatory fittings to want and desire using their sizes. Now marry both the together to see what fits. Note: Most bathroom drainage and water inlet points might be moved but this does come at extra expense.
Single Family House Plans Single Family House in USA Outsource Architectural Services, 3D

Bathroom remodel
If you've decided to accomplish the work yourself or part of the job it can be time to employ a skip bin and retrieve the old bathroom. If your house was developed pre 1980 you may have fibro bathroom wall linings with asbestos within it and great care will have to be taken. You will need some full body disposable overalls, eye protection, and quality dust mask. Check with your neighborhood building authority or council about the regulation on bathroom asbestos wall lining removal.
Remove everything except the plumbing. If you keep the restroom plumbing in place you'll not have to turn the river off for the entire house. Also you will have to jack hammer the floor tiles up along with the sand and cement bed that they are laid on.
Proposed two storey residence with carport: single family home by mg architecture design studio

Bathroom Renovation and construction
Bathrooms has to be construction properly through the start to make sure that the finished job is correct and true. This also ensures the look and look of the bathroom may have an excellent finish
The Bathroom Renovation Process

Install water and drainage pipe and electrical wires.

Install wall lining and ceiling and then install the bathtub hob and bath.

Waterproof the ground and shower and bath recess.

Correct the fall of the bottom with sand and cement ready for tiling.

Lay floor and wall tiles after which grout.

Install new bathroom vanity, fittings, and taps - install new electrical.
Encuentra planos gratis de casas ecológicas diseñadas por los mejores arquitectos del mundo


Paint ceiling and final  one - Plumbing and electrical
At this point all new plumbing is installed for clean cold and hot water and drainage. Careful attention must be taken when positioning the modern plumbing so that the plumbing fittings are correct when the tiling is fully gone. For example: To centre a fitting in a shower recess you must take into account the thickness from the wall board, tile glue and tile therefore the fitting will probably be centred as soon as the tiles are in position. The same refers to installing drainage pipes for the toilet; the wall lining and tile thickness have to be taken into account and so the pipe influences correct position once the toilet is installed after tiling. Also rough inside the any new electrical wires without connecting them to the mains power.
3d exterior house design: single family home by thepro3dstudio  homify

Step two - Install wall and ceiling linings
Install your 6mm wall lining fostering to nail the fibro board every 150mm without nailing into the modern pipes and electrical wires. The best way is to measure and mark the pipe and wire layout on your new wall board having a pencil when you go. Screw up (or nail) the ceiling lining, plasterboard will be the most common. However if you're laying your tiles from floor to ceiling tend not to install the cornice as this is best done after tiling. If you might be not tiling for the ceiling go on and install the cornice as soon as the wallboard and ceiling lining happen to be installed. Also if your bath just isn't freestanding anyone can from the frame and install the bathtub. Ensure the bath is installed correctly enabling the thickness from the tiles and  sure to check all linings and pipes before you continue with a bath room renovation.

Single Family House Plans Single Family House in USA Outsource Architectural Services, 3D
Contemporary Style House Plan  4 Beds 3.5 Baths 4983 Sq/Ft Plan 928287  Dreamhomesource.com

Step three - Waterproof a bath room
Waterproof your bathrooms floor, shower recess, and around the tub. When waterproofing the floor ensure that the waterproofing comes 100mm up the walls. The shower recess must be waterproofed 100mm higher than the shower rose outlet. Also the tub should be waterproofed 100mm higher than the lip in the bath about and for the floor. At the doorway install a 25 x 25mm aluminum angle glued into place with quality silicone and waterproof in to the lip. Your whole bathroom should now the tanked, therefore the all water is only going to go lower a drain. Bathroom waterproofing tip: waterproofing is an easy job but quality and accuracy is most important.
Step four - Lay inside cement screed for the ground.

Before the bottom tiles can laid the floor must be smooth and fairly flat with a slight fall to the drainage outlet. To do this you have to use sand and cement mix which is better to add a waterproofing agent into this as well. With a level, set a floor level on the doorway. Use the top aluminum angle since the finished floor level and measure around the thickness with the tile plus 10mm for your glue. Mark right around the toilet which has a level then screed inside your sand and cement mix using a 1 to 3 degree fall towards the top of the drain outlet. Take your time and get it right while using finished level as smooth as is possible. When the sand cement mix has set but isn't dry (you can walk onto it nevertheless, you will still be a lttle bit soft) rub it over which has a house brick. This will remove all the small highs and lows and look having a level as you go. Let the toilet floor fully dry and after that you should have an incredible surface to tile onto. Tip: greater work you set into the ground screed the more your tiling will probably be.
Proposed two storey residence with carport: single family home by mg architecture design studio
Single Family House Plans Single Family House in USA Outsource Architectural Services, 3D

Step five: Tile floor and walls
Lay your tiles on the ground first and then grout. Then lay your wall tiles ensuring that they are level while you lay. Once the restroom tiles happen to be cut and laid, grout all your tiles then buff the tiles clean.
Step six: Install plumbing fitting and fixtures
Install all of your plumbing fittings and taps. Also fit your towel rails and soap holders. Fit your brand-new bathroom vanity making certain it can be level and sealed across the top with silicone and in addition seal around the bath. Tip: make sure they are in the right place prior to deciding to drill into your tiles.
Encuentra planos gratis de casas ecológicas diseñadas por los mejores arquitectos del mundo
Proposed two storey residence with carport: single family home by mg architecture design studio

Step seven: painting, and cleaning - enjoy
Paint your ceiling and perform final clean ensuring it is all totally fitted correctly understanding that there isn't any leaks in your plumbing. - Enjoy your new bathroom.

Comments