Cayman Structural Group Luxury Kitchen Design Construction Cayman Structural Group

Luxury Modern Kitchen Designs Kitchen : Custom Luxury Modern Kitchen Designs Homes Small Design Cayman Structural Group Luxury Kitchen Design Construction Cayman Structural Group

Bathroom Renovation - A Step by Step Guide

Bathrooms are some of the smallest rooms at home and they are also certainly the most expensive to renovate. Bathroom renovation is really a job that, if done well, can add value to a home as well as a great space full of design and light-weight.
Cayman Structural Group Luxury Kitchen Design  Construction  Cayman Structural Group

Bathroom design
Bathroom design will be the first section of a bath room renovation you need to get right. Just replacing the current bathroom sticking with the same design might not be enough. The key to great bathroom design is usually to design it with the people who will utilize it in your mind. However make certain that your bathroom design even offers an over-all use factor too.

For example: If you were designing your bathrooms for families you could still design the lavatory with quick access on the shower and bath. This would be sure that the design would recieve treatment if you have limited mobility. This means if you sell your property or if you are renovating for profit your design carries a wider market appeal. Great bathroom design also uses the space well, considering the sunlight or window space, height and width of fittings, and drainage options. Draw out a strategy to scale and all the way down the sizes of one's room. Mark the prevailing drainage points and then and water inlet points. Write down a wish listing of the toilet fittings to want and wish making use of their sizes. Now marry both together and find out what fits. Note: Most bathroom drainage and water inlet points could be moved but this does come at extra cost.
Modern Kitchen Designs  Gallery of Pictures and Ideas

Bathroom remodel
If you have decided to perform the project yourself or part of the project it can be time to engage a skip bin and retrieve the existing bathroom. If your house was developed pre 1980 maybe you have fibro bathroom wall linings with asbestos inside it and great care must be taken. You will need some full body disposable overalls, eye protection, and quality dust mask. Check with the local building authority or council in connection with regulation on bathroom asbestos wall lining removal.
Remove everything except the plumbing. If you keep the bathroom plumbing available you won't ought to turn the water off for the complete house. Also you should jack hammer the ground tiles up and also the sand and cement bed that they are laid on.
Cozinhas modernas

Bathroom Renovation and construction
Bathrooms have to be construction properly from your ground up to be sure that the finished job is correct and true. This also ensures the structure and look of the restroom can have an excellent finish
The Bathroom Renovation Process

Install water and drainage pipe and electrical wires.

Install wall lining and ceiling and after that install the bathtub hob and bath.

Waterproof a floor and shower and bath recess.

Correct the fall of the ground with sand and cement ready for tiling.

Lay floor and wall tiles and after that grout.

Install new bathroom vanity, fittings, and taps - install new electrical.
20 Ultra Modern Kitchens Every Cook Would Love to Own  Home Design Lover


Paint ceiling and final  one - Plumbing and electrical
At this aspect brand new plumbing is installed for clean cold and warm water and drainage. Careful attention needs to be taken when positioning the brand new plumbing in order that the plumbing fittings are correct once the tiling is finished. For example: To centre a fitting in a shower recess you have to consider the thickness from the wall board, tile glue and tile so the fitting is going to be centred following your tiles are available. The same refers to installing drainage pipes for a toilet; the wall lining and tile thickness have to be taken into account so the pipe influences correct position in the event the toilet is installed after tiling. Also rough inside any new electrical wires without connecting them for the mains power.
2015 Midwest Home Luxury Home 1  Denali Custom Homes  Contemporary  Kitchen  Minneapolis

Step two - Install wall and ceiling linings
Install your 6mm wall lining the constant maintenance to nail the fibro board every 150mm without nailing into the modern pipes and electrical wires. The best way is to measure and mark the pipe and wire layout on your new wall board having a pencil because you go. Screw up (or nail) the ceiling lining, plasterboard is the most common. However if you're laying your tiles from floor to ceiling tend not to install the cornice because this is done after tiling. If you happen to be not tiling towards the ceiling go on and install the cornice after the wallboard and ceiling lining have been installed. Also if your bath is not freestanding you can now from the frame and install the tub. Ensure the tub is installed correctly making it possible for the thickness from the tiles and  sure to check all linings and pipes when you continue with your bathrooms renovation.

Modern Kitchen Designs Gallery of Pictures and Ideas
Cayman Structural Group Luxury Kitchen Design  Construction  Cayman Structural Group

Step three - Waterproof your bathroom
Waterproof your bathroom floor, shower recess, and around the bath. When waterproofing the bottom ensure that the waterproofing comes 100mm inside the walls. The shower recess will have to be waterproofed 100mm over the shower rose outlet. Also the bathtub must be waterproofed 100mm higher than the lip with the bath around and to the floor. At the doorway put in a 25 x 25mm aluminum angle glued into place with quality silicone and waterproof in to the lip. Your whole bathroom should now the tanked, so the all water will simply go down a drain. Bathroom waterproofing tip: waterproofing is a straightforward job but quality and accuracy is most crucial.
Step four - Lay inside cement screed for the ground.

Before a floor tiles can laid the floor has to be smooth and fairly flat using a slight fall on the drainage outlet. To do this you should use sand and cement mix which is better to include a waterproofing agent into this too. With a level, set the ground level in the doorway. Use the top aluminum angle since the finished floor level and measure down the thickness in the tile plus 10mm for your glue. Mark about the toilet having a level and after that screed inside your sand and cement mix which has a 1 to 3 degree fall towards the top with the drain outlet. Take your time and have it right while using finished level as smooth as possible. When the sand cement mix has set but is not dry (it is possible to walk into it nevertheless, you it is still a lttle bit soft) rub it over using a house brick. This will remove every one of the small highs and lows and appearance using a level while you go. Let the restroom floor fully dry after which you should have a great surface to tile onto. Tip: greater work you set into the ground screed the more your tiling will likely be.
Cozinhas modernas
Modern Kitchen Designs  Gallery of Pictures and Ideas

Step five: Tile floor and walls
Lay your tiles on a floor first after which grout. Then lay your wall tiles ensuring that they are level because you lay. Once the lavatory tiles are actually cut and laid, grout all your tiles and after that buff the tiles clean.
Step six: Install plumbing fitting and fixtures
Install all your plumbing fittings and taps. Also fit all your towel rails and soap holders. Fit your brand-new bathroom vanity ensuring that it really is level and sealed round the top with silicone and also seal around the bathtub. Tip: make sure they have been in the right place before you decide to drill to your tiles.
20 Ultra Modern Kitchens Every Cook Would Love to Own Home Design Lover
Cozinhas modernas

Step seven: painting, and cleaning - enjoy
Paint your ceiling and do a final clean making certain things are fitted correctly understanding that there aren't any leaks within your plumbing. - Enjoy a new bathroom.

Comments